Document No. Q2026
Edition 3: P2of six 
Compiled by: Engineering Department 
Implementation date: Aug 20th, 2011
 
Customer Acceptance Control Procedure CACP
 
Customer Acceptance Control Procedure CACP
Document No. Q2026
Edition 3: P3of six 
Compiled by: Engineering Department 
Implementation date: Aug 20th, 2011
 
Acceptance data summary 
Notice to client 
Client acceptance 
Determination 
Signature of acceptance Document 
Data systemizing and recording 
Improvement 
Access inspection 
Determination 
Installation control 
Site verification and correction 
Returning structure 
Installation inspection 
 
Document No. Q2026
Edition 3: P4of six 
Compiled by: Engineering Department 
Implementation date: Aug 20th, 2011
Customer Acceptance Control Procedure CACP
 
6. Contents 
6.1 Access inspection 
6.1.1 The quality inspector, jointly with related staff shall make inspection on the steel structure, including stains, loss or deformation arising from the transportation and loading and unloading procedures after the access from Manufacture Department, guaranteeing the quality control on main materials, parts and components and finished products and standard products. 
6.1.2 The Project Manager shall arrange the site verification and correction on the unqualified steel structures after the inspection. Any steel structure unsuitable for the site verification and correction shall be returned to Manufacture Department for unqualified product control in accordance with the requirements of Unqualified product control procedure (Document 8.7).
6.1.3 The Project Manager shall make record on inspection results and corresponding measures in the Delivery List (Appendix 7.1) or Client Claim Response Sheet (Appendix 7.2) submitted by the production management department. 
6.2 Installation control 
6.2.1 Only the qualified steel structure after the access inspection can be used for installation in accordance with Installation Control Procedure (Document 8.1). 
6.2.2 The Engineering Department shall make inspection on the torque coefficient and fastening axis force (pre-tension force) on high strength hex bolt set and tor-shear bolt set before using and within the quality warranty period. Such inspection shall be made on sampling and submission with witness. 
6.3 Installation inspection 
6.3.1 The inspection lot shall be divided on the structure section according to the following principles: 1on the deformation joint for the single-layer steel structure; 2 on different floors or construction sections for the multi-layer or high steel structure; 3 on roof, wall and floor for the contour metal sheet engineering; 4 to combine or divide the inspection lot of the acceptance of raw materials and finished products on the actual project scale and material delivery. 
6.3.2 The inspection shall be made with the method and sampling quantity specified in Steel Structure Construction Quality Acceptance Regulations (Document 8.2) on different inspection lots, making sure meeting the quality standards of the regulations with full acceptance records on sheets required by the local quality inspection sector of the project, such as Steel Sheet, Wave Steel Sheet Roof Section Quality Inspection Table (Document 7.3) or Steel Structure Crane Beam Installation Section Quality Inspection Table (Document 7.4), whose format shall be stipulated by the quality inspection sector. 
6.3.3 The Project Manager shall make continuous supervision and control with various records on installation welding seams and high strength bolt connection. 
6.3.4 The next procedure shall start only after the inspection items in the previous procedure meet the requirements. 
6.4 Acceptance data summary 
6.4.1 The Engineering Department shall make acceptance data summary according to requirements of the client and Project Acceptance Data Table of Contents Instruction (Document 8.5). 
6.4.2 The Engineering Department shall summarize and bind the acceptance data submitted by related sectors. 
6.5 Notice to client 
6.5.1 The Engineering Department shall fill in Project Contact Sheet (Appendix 7.5) or Project Completion Report (Appendix 7.6) after the internal inspection and make notice to the client for acceptance officially. 
6.5.2 The Engineering Department shall submit the acceptance data to the client as well as the quality inspection sector and shall make improvement in case of any objection arising from the data. 
6.6 Client acceptance 
 
Customer Acceptance Control Procedure CACP
Document No. Q2026
Edition 3: P5of six 
Compiled by: Engineering Department 
Implementation date: Aug 20th, 2011
 
 
6.6.1 The Engineering Department shall cooperate or require related sectors to cooperate with the client in the site acceptance inspection. 
6.6.2 The Project Contact Sheet or Improvement Notice by the client in the acceptance inspection shall be kept properly as the basis for the site improvement and further improvement. 
6.6.3 The Engineering Department shall make contact with related sectors for unqualified product control procedure for improvement until meeting the client requirements in accordance with the unqualified item response record and acceptance record in case of any disqualification. 
6.7 Signature of acceptance Document 
6.7.1 The client shall sign on Unit Project Quality Acceptance Record (General table 1) (Appendix 7.7), Section Project Acceptance Summary Table (General table 2) (Appendix 7.8), Quality Warranty Data Inspection Record (General table 3) (Appendix 7.9) and Unit Project Visual Quality Inspection Record (General table 4) (Appendix 7.10) after making acceptance of the whole project. 
6.7.2 The above mentioned tables and forms are general quality tables stipulated by the local quality inspection sector of the project, of which the format shall be stipulated by the quality inspection sector. 
6.8 Data systemizing and recording 
The acceptance shall, after systemizing, be submitted to the department authority for inspection on the completion in accordance with requirements of Record Control Procedure (Document 8.6). 
7 Appendix 
7.1 Delivery List -------------------------------------------------------NO: 
7.2 Client Claim Response Sheet ------------------------------------NO: Q4142
7.3 Steel Sheet, Wave Steel Sheet Roof Section Quality Inspection Table
7.4Steel Structure Crane Beam Installation Section Quality Inspection Table
7.5 Project Contact Sheet --------------------------------------------NO: Q4079
7.6 Project Completion Report  ----------------------------------------------NO: Q4075
7.7 Unit Project Quality Acceptance Record (General table 1)
7.8 Section Project Acceptance Summary Table (General table 2)
7.9 Quality Warranty Data Inspection Record (General table 3)
7.10 Unit Project Visual Quality Inspection Record 
8 Reference documents:  
8.1 Installation control procedure  -----------------------------------NO: Q2020
8.2 Steel Structure Construction Quality Acceptance Regulations -NO:GB50205-2001
8.3 Client acceptance control procedure  -----------------------------NO: Q2026
8.4 Reference to ISO terms: 8.2.4 
8.5 Project Acceptance Data Table of Contents Instruction ---------NO: Q3082
8.6 Record control procedure  ------------------------------------------NO: Q2002
8.7 Unqualified product control procedure  --------------------------------------NO: Q2037
世聯(lián)翻譯-讓世界自由溝通!專業(yè)的全球語言翻譯供應(yīng)商,上海翻譯公司專業(yè)品牌。絲路沿線56種語言一站式翻譯與技術(shù)解決方案,專業(yè)英語翻譯日語翻譯等文檔翻譯、同傳口譯、視頻翻譯、出國外派服務(wù),加速您的全球交付。 世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。