User Requirement Specification
                  Comprehensive specification of requirements
BEIJING MEDICAL FACTORY clean room, rooms 01-09
Project Gambro
Cleanroom MED-03
URS identification project_CR_BEIJING MEDICAL FACTORY_URS_01
Prepared By Process Engineer:
István Varga
Initials: Date: Signature:
Reviewed By Technical Flow Manager:
Károly Szép
Initials: Date: Signature:
Reviewed Production Flow Manager:
Ottó Steiner
Initials: Date: Signature:
Reviewed By Quality Assurance:
Tibor Montovay
Initials: Date: Signature:
Approved By Production Director:
Bart Nolden
Initials: Date: Signature:
Approved By Key Account Manager:
Balázs Döbör
Initials: Date: Signature:
Approved By Quality Director:
István Czaba
Initials: Date: Signature:
Distribution:       
Original to:
 
WSS > Production Documents > Gambro > belső dokumentumok > validációs dokumentumok > Clean Room
 
Q-P archive>Gambro > belső dokumentumok > validációs dokumentumok > Clean Room
Paper copy to: Quality organisation
Electronic copy to: WSS > Production Documents > Gambro > belső dokumentumok > validációs dokumentumok > Clean Room
           
 

1PURPOSE

The purpose of this document is to specify the requirements for the premises, the air management, and the equipment to be installed in BEIJING MEDICAL FACTORY. The requirements must be compatible with the GMP and with the requirements concerning security, the environment and health. We have specified these requirements in such a manner that they should correspond to the requirements imposed by projects, users and the quality assurance department.

1.1      Scope

The premises are intended to be used for the production injection moulded components for medical technical products for Nolato.
The requirement specification includes requirements for manufacturing hall, sluice gates and finished product packaging rooms, dressing rooms. The requirements cover construction, air management and equipment-related issues.
The injection moulding hall must be fit for injection moulding, in compliance with the effective URS.
This means that all equipment should be scaled in such a manner that on average, it should be possible to work with 30 injection moulding machines of 50-160 tons (clamping force).

1.2      Project background

-       The hall should be adjusted so that production with maximum intensity could take place there, with max15 persons in each shift. In the first step 6 IM machine will be set up.  The hall should also be able to be used for a different scenario, when production  are running with summ 30 machine  with more packaging and product management.
Both scenarios have been calculated for continuous operation (4 shifts 7 day/week).
-       The input material for injection moulding is different types of plastic raw materials.



2         SYSTEM OVERVIEW

2.1      Interface/responsibility

·                    The lighting and interior fittings required for a process are covered by the specifications for the respective processes.
·                    The building contractor is responsible for making holes and joints in the roofs, walls, doors and the floor.
·                    The building contractor is responsible for the placement of the fresh- and exhaust air apertures in the halls after consultation with Nolato.
·                    HEPA-filters must be handled, installed and tested by staff members having the requisite qualification.
·                    The existing Monitoring system (Control and Monitoring System) must control (regulate) the air management equipment so that it operates in line with the air technical parameters described in this requirement specification.
·                    A Monitoring -system must continuously monitor and record critical air technical parameters under its control.
·                    The building contractor is responsible – after consulting Nolato - for the placement of the compressed air and other gas outlets, the connections in the cleanroom and the air sluices.


2.2      System description

 
BEIJING MEDICAL FACTORY cleanroom
Definitions:
White Zone: The part of the clean room ISO 8 having no connection with the uncontrolled area (BEIJING MEDICAL FACTORY CLEAN ROOM-01, and CLEAN ROOM-02)
Grey Zone: Adjacent or connecting rooms that have connection with clean room and the uncontrolled areas such as warehouse, sluice gates, dressing rooms etc.
The raw material for injection moulding coming from outside the cleanroom by an automatized centralized material system in a closed pipeline system. The centralized material system should have the possibility to make use of a scanner system with locks to prevent errorous material handling. 
 The packaging materials supplied from the central warehouse into the material handling area “grey zone” side, from the “grey zone”, the plastic bags go into the “white zone” through a sluice gate. The plastic bags go into the production area from the white zone.
In the production area BEIJING MEDICAL FACTORY-01 goods are packed in single palstic bags and plastic boxes as temporaly storage or according to customer requirements. In these boxes, the final goods leave BEIJING MEDICAL FACTORY-01 through a sluice gate (goods air shower). Here, the goods are packed according to customer requirements and the finished package (in closed cardboardboxes or similar) go out to the central warehouse.

2.3      Specification of room, air management and equipment

 
·                    The input components of the hall, the air management system and the equipment must be designed with a view to hygiene and ergonomics, so that cleaning and tidying etc. should be easy.
·                    All input components in the classified halls must be designed, adjusted and shaped to meet the requirements of the hall’s cleanliness level.
·                    All components in the cleanroom must complie to MSZ-EN-ISO 14644 and withstand cleaning with common cleaning agents like 70 % Iso-propil-alkohol, Bendurol Forte, Molarsolv EV07, 70%-os etil-alkohol, GERMIMED, VANTROPOL, MEDONAL



2.4      Critical parameters influencing processes and products

The following parameters have a direct influence on the process and consequently on product safety and quality:
·                    Electricity
·                    Compressed air pressure
·                    Water cooling/pressure
 
None of these parameters will be verified in connection with the facility validation. They will be validated in the equipment validation process.
 
The following systems have an indirect influence by way of creating the environment in which the product is produced, or are used as assistance tools in the process.
·                    Ventilation (temperature, relative humidity and the number of particles and micro-organisms)
·                    Compressed air
·                    Tap water (hand washing) and drain
 

2.5      Interface to other systems

·                    Monitoring system (Monitoring system) for ventilation and equipment in Nolato Beijing Medical factory needs to be installed.
·                    Existing water and drain system have been expanded and needs to be installed
·                    A separate transformator will be supplying  the clean room area

2.6      Accessible equipment

None of the existing equipment will be used


2.7      Environment, health and safety

  • Work environment, minimise noise (≤ 85 dB (A))  from the systems and the machines.
  • Fire classification for whole cleanroom have to “D”
  • Emergency exit have to built in
 

2.8      Layout/drawings

The layout and the drawings were given separately.

2.9      Life cycle

The facility and all components must follow a life cycle including its every phase, i.e. design/construction, installation, validation, use and removal. This means that all design documents must be updated during the whole life cycle, so that they should always reflect the real layout and function of the facility. The following documents are included:
·                    URS
·                    Room function programme
·                    Drawings and sketches
·                    Technical building descriptions (construction documents)
·                    Traceability matrix
·                    Other design documents
 
The documents must be available in the appropriate version and shall be approved. This means that the following approved documents must be available:
·                    Before installation/the start of the construction (including the construction documents)
·                    Before validation
·                    After validation (including the “as built” documentation)
·                    After changes in the course of usage
 
In order for the documents to be traceable and well under control, all changes must take place in a well-controlled manner. See bracket 11
 

3         LIMITATIONS

This document includes only the requirements imposed by operation. This document does not cover financial or legal aspects related to procurement/procurement procedure.
 

4         DEFINITIONS AND ABBREVIATIONS

This part presents the definitions and abbreviations used in this document.

4.1        ABBREVIATIONS

RK/EG        Cleanliness category/ Environmental grade
EU GMP European Commission Good Manufacturing Practices
ISO International Organization for Standardization
GMP Good Manufacturing Practice
GEP Good Engineering Practice
OEL Occupational Exposure Limit
HEPA-filter High Efficiency Particle Air- filter
RFP Room function programme
 

4.2    Definitions

See the Nolato instruction Terms and abbreviations in the validation process


4.3      Cleanliness categories /environmental grades and environmental requirements

The requirements for the number and size of the particles in the classified halls are found in EN ISO-14644-1 “Cleanroom-associated controlled environments Part 1- Classification of air cleanliness” Methods for design, operation, testing and monitoring are found in ISO-14644-2 to ISO-14644-5. A vocabulary can be found in ISO-14644-6. Requirements for the testing and monitoring of microorganisms are found in ISO-14698-1 and 2.
The BEIJING MEDICAL FACTORY shall meet ISO14644-1, min. class 8 in operation, in and “as built”  and “at rest” state. Microbiological requirements shall be met “as built”, according to 44/2005.X 10.19 EüM rendelet melléklete (GMP Eudralex, volume 4, Annex 1, class D).
The process requires controlled temperature and humidity in the production halls.


5         CLASSIFICATION OF REQUIREMENTS

In order to be able to differentiate between the different requirement types, we have rendered a code to every requirement, as stated below:
I= information that gives information but cannot be tested.
1= Nolato’s own internal requirements
Internal requirements related to. e.g. the environment, health and safety. These should not be tested formally, but verified against the Good Engineering Practice during – for example – the review.
2= GMP requirement
GMP requirements related to e.g. product safety, requirements in the ISO standard or requirements imposed by the authorities must be tested (qualified/validated) formally against the GMP, producing a testing protocol.
3= Non-GMP requirement
Non-GMP requirements related to e.g. construction-technology should not be tested or verified, but handled according to the tendering procedure.
 

6          OPERATIONAL AND FUNCTIONAL REQUIREMENTS VENTILLATION

6.1        Monitoring systems

6.1.1       General

Requirement no. Description Code
6.1.1.1       A monitoring system must monitor the air management equipment according to the air technical parameters presented in this requirement specification. I
 

6.1.2       Alarm functions

Requirement no. Description Code
6.1.2.1    In the Monitoring system it must be possible to set warning and alarm levels for critical parameters specified in this requirement specification. 2
6.1.2.2    The Monitoring system must continually monitor, alarm and log the critical parameters that are controlled by the Monitoring system. Critical parameters must be logged every 10 minutes. 2
6.1.2.3    Information about the alarm levels, delays and logging frequency is found in annexes (hall function programme for halls) I
6.1.2.4    The alarm functions in the Monitoring system must be reviewed in consultation with NOLATO and shall be approved by NOLATO. I
6.1.2.5    In the event of power breakdown or other disruption of the critical alarm, a visual alarm must be activated by the Monitoring system . 2
6.1.2.6    Alarms must be registered in the alarm lists, and it must be possible to print them out from the Monitoring system. 2
       

6.1.3       Control/interlocks

Requirement no. Description Code
6.1.3.1                          The differential pressure must be maintained by controlling exhaust air (dampers & valves in the ventilation channels) 3
6.1.3.2                          Fresh air must maintain the turnover requirements imposed, normally constant. 2
6.1.3.3                          In the event of power breakdown or interruption of service of the air handling unit, air flow directions must not be reversed. 2
6.1.3.4                          In the event of power breakdown of service, air flow directions must be kept by closing a spring loaded latch. 2
6.1.3.5                          The New cleanroom plc controller should controll the humidity 3
 
 

7         TECHNICAL REQUIREMENTS

7.1        Clean room

7.1.1       General requirements surface materials

Requirement no. Description Code
7.1.1.1       The surface must withstand common cleaning with chemical agents, 70 % Iso-propil-alkohol, Bendurol Forte, Molarsolv EV07, 70%-os etil-alkohol, GERMIMED, VANTROPOL, MEDONAL, INTOMILD .The chemical certificate confirming this must be enclosed to the documentation. 2
7.1.1.2       Surfaces must be visibly smooth and without any visible cracks or holes. 2
7.1.1.3       All connections between the walls, floor, roof and installations must be joined together tightly. 2
7.1.1.4       Floor: Epoxi (silica infused), Grey (Or similar colour Polyurethane) in the whole BEIJING MEDICAL FACTORY. 3
7.1.1.5       Exposed surfaces may not be of wood, chipboard, plywood, paper or cardboard. 2
7.1.1.6       The walls must have  powder coated, smooth surface (inner surface) Kingspan panel (or similar) 2
7.1.1.8       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.1.9       Avoid horizontal and tilted surfaces as much as possible to make cleaning easy. 2
7.1.1.10     The installation of electricity, pipes and data cables must be hidden in the walls as much as possible or must be outside the room. 2
 

7.1.2      Ceiling

Requirement no. Description Code
7.1.2.1       The surface must withstand common cleaning with chemical agents, 70 % Iso-propil-alkohol, Bendurol Forte, Molarsolv EV07, 70%-os etil-alkohol, GERMIMED, VANTROPOL, MEDONAL, INTOMILD. The chemical certificate confirming this must be enclosed to the documentation. 2
7.1.2.2       Surfaces must be visibly smooth and without any visible cracks or holes. 2
7.1.2.3       The ceiling shall be a self carry construction, passable from the top (200kg/m2) 3
7.1.2.4       All joints between ceilings, walls, must be joined and sealed. 2
7.1.2.5       Eventual equipment must simply be drawn through an opening in the roof. Transits must be sealed. 2
7.1.2.6       All media must be drawn above the ceiling and in the service corridors. 2
7.1.2.7       For joining together, always use mould-resistant material. 2
7.1.2.8       Specification/data sheet for how to use the joining material must be enclosed to the documentation. 2
7.1.2.9       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.2.10     The plates in the ceiling must be white. 3

7.1.3       Walls

Requirement no. Description Code
7.1.3.1       The surface must withstand common chemical cleaning agents, like 70 % Iso-propil-alkohol, Bendurol Forte, Molarsolv EV07, 70%-os etil-alkohol, GERMIMED, VANTROPOL, MEDONAL, INTOMILD.
The chemical certificate confirming this must be enclosed to the documentation.
2
7.1.3.2       Surfaces must be visibly smooth and without any visible cracks or holes. 2
7.1.3.3       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.3.4       All joints between the wall elements, roof, floor, doors and windows must be joined together tightly. 2
7.1.3.5       For joining together, always use mould-resistant material. 2
7.1.3.6       Specification/data sheet for how to use the joining material must be enclosed to the documentation. 2
7.1.3.7       All eventual equipment must simply be drawn through an opening in the wall. Cable transits must be sealed. 2
7.1.3.8       The floors must be drawn up onto the walls with a wedge having a holker to the room. 2
7.1.3.9       Exhaust air apertures must be installed and joined into the wall. 2

7.1.4       Doors

Requirement no. Description Code
7.1.4.1       Doors must close tightly against the floor, the ceiling and the walls when shut. 2
7.1.4.2       Doors must be constructed in a way that makes them fulfill the requirements set for cleanrooms ISO 14644 Materials of the doors must be plastic or metal. Doors must be equipped with safety glass windows. 2
7.1.4.3       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.4.4       Doors must have an auto-close function. 2
7.1.4.5       The doors should open into the rooms with the highest differential pressure. The differential pressure must help the door close. Deviations may be allowed if the layout so requires. If needed it must be checked if the door/s really close/s if the air management system is in full operation. 2
7.1.4.6       Doors of the sluices leading to production halls must be interlocked with an interlock system. 2
7.1.4.7       Thresholds may not be present on floors. 2
7.1.4.8       Doors with windows must be even with the door panel. 2
7.1.4.9       Door fittings must be designed in such a way that there are no sharp parts or places that are difficult to clean. 2
7.1.4.10     All joints between the door and the wall elements must be joined and sealed. 2
7.1.4.11     For joining together, always use mould-resistant material. 2
7.1.4.12     Specification/data sheet for how to use the joining material must be enclosed to the documentation. 2
7.1.4.13     Fast moving door towards the non controlled  area from the grey zone of the pack area. 2

7.1.5     Windows

Requirement no. Description Code
7.1.5.1       It must not be possible to open the windows. 2
7.1.5.2       The Materials of the windows must be plastic or metal materials 2
7.1.5.3       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.5.4       The windows must be even with the wall elements in the clean room. 2
7.1.5.5       All joints between the windows and the wall elements must be joined and sealed. 2
7.1.5.6       The windows must be placed in the walls between the different rooms of the clean room and from the injection moulding area to the service corridors. 3

 


7.1.6     Floor

Requirement no. Description Code
7.1.6.1       The floor must bear a load of 2 tons in a point (2t/100cm2) 3
7.1.6.2       Material: Epoxi, Grey (Or similar colour Polyurethane). With holker against all walls. 2
7.1.6.3       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.6.4       The surface must be free of pores. (fulfill the cleanroom requirement ISO 14644 ) 2
7.1.6.5       The floor must be drawn up on the walls with a wedge that forms a holker with the room. 2

7.1.7       Lighting

Requirement no. Description Code
7.1.7.1       The luminaries must be fit and sealed to the ceiling, closed system, easy to clean and must withstand cleaning agents. 2
7.1.7.2       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.7.3       The fluorescent lamps must be made of safety glass and may not be of the “starter” type (fire hazard). 2
7.1.7.4       Luminosity in BEIJING MEDICAL FACTORY should be 800 ± 10% Lux in the centre of the production hall without daylight. At the outer edges of the production halls the luminosity must not be lower than 450 Lux.
The luminosity must be measured at 1500 mm from the floor with calibrated measuring instrument, and a copy of the calibration certificate of the measuring instrument must be enclosed.
2

7.1.8       Electronic connecting points and computer outlets

Requirement no. Description Code
7.1.8.1       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.1.8.2       The 400V and the 240V sockets must be installed with as few protruding details as possible, and that is it possible to wipe them off with a wet cloth. 2
7.1.8.3       Cat. 6 Screened cables in the production spaces, but not in the offices 3

7.1.9     Heating systems

Requirement no. Description Code
7.1.9.1       Heating is maintained by the air management equipment. 3
7.1.9.2       Radiators are not allowed inside the clean room 2

7.1.10Sluice gates  

7.1.10.1   Staff sluice gates

Requirement no. Description Code
7.1.10.1.1         All entries and exits of the personnel must be through the personnel sluices. 2
7.1.10.1.2         Sluice gates must be equipped with an interlock system. (See Interlock spec). 2
7.1.10.1.3         There must be clear definitions /markings between the different sluice steps (grey zone- white zone). 2
7.1.10.1.4         The white zone of the sluice must have ISO8 category in operation. 2
7.1.10.1.5         The grey zone of the sluice must have ISO 8 category as built 2
7.1.10.1.6         The staff and material sluice gates must be separate 3
7.1.10.1.7         The lowest height of the internal roof must be 2.5 meters 3
7.1.10.1.8         The staff sluice gates must not have any wall windows towards the external corridors. 3
7.1.10.1.9         Every door in the sluice gate must have windows allowing the sight of the next room. 3
7.1.10.1.10      Personnel sluices must be equipped with wash basins that are connected to the sewage system of the building. These must have a back-lock design to prevent odour etc from the sewage system. 2
7.1.10.1.11      Soap-, disinfectant-, and towel dispensers must be set up at the wash basins. 2
7.1.10.1.12    S There must be a mirror in the sluice. 2

 

 

7.1.10.2   Material sluice gate

Requirement no. Description Code
7.1.10.2.1.        All in- and outbound transportation of materials and equipments must be carried out through the material sluice. 2
7.1.10.2.2.        The air shower of the sluice area must conform with ISO8 category class for operation. 2
7.1.10.2.3.        There must be well defined areas for clean and less clean materials in the sluice, (markings on the floor etc.). 2
7.1.10.2.4.        All sluices must have interlocking doors. (See Interlocs spec). 2

7.2        Air management

7.2.1       General requirements for air management units    

Requirement no. Description Code
7.2.1.1       The air management unit must be designed with a view to hygiene, which includes:
·         Easy to assemble components for easy cleaning and maintenance
·         Fully flat inside and outside surfaces
·         Sealed panel joints
·         Large inspection doors
·         Extensible filter walls
·         F9 pre filter in the machine
I
7.2.1.2       The BEIJING MEDICAL FACTORY must meet the requirements for particles set by ISO14644-1 class 8  “as built” & “at rest” and “in operation” in white zone and “as built” and “at rest” in grey zones. 2
7.2.1.3       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.2.1.4       The installation must be carried out in such a way that it is easily accessible for cleaning and maintenance. 2
7.2.1.5       The installation must be carried out in such a way that areas around (sides and above) are easily accessible as far as possible. 2
7.2.1.6       The cleaning agents specified by supplier must be approved by NOLATO: The specification of the cleaning agent used must be enclosed to the documentation. 2
7.2.1.7       Drainage of parts of the unit and the components thereof must be possible. Drainage sumps must slope towards the sewer. 3
7.2.1.8       Drainage function has to be controlled and documented prior to approval. Enclose signed and dated minutes to the air management documentation. 2
7.2.1.9       It must not be possible for water to gather in corners or dirt catchers and become stagnant in parts of the air handling unit. 2
7.2.1.10     Filtering in the air management unit must be carried out two steps: outdoor air goes through a fine filtration process, with the filter class being F5  F7 and goes out trough a F9 towards the room intake HEPA filters. 2
7.2.1.11     Assembled filters and filter class must be documented in a dated and signed protocol which is attached to the documentation of air management. 2
7.2.1.12     The filter edges and the filter bars must be sealed. Control is carried out visually and a dated and signed test protocol is attached to the documentation on air management. 2
7.2.1.13     Filters must not rest on the floor of the air management unit. Visually inspect and enclose a dated and signed test protocol to the air management documentation. 2
7.2.1.14     Pressure tests must be carried out on the air management unit and its components.
Air handling units and its components must be made and sealed in such a way that they meet the requirements for class B tightness (described in for example VVS AMA 98 - General description of materials and works in the field of Building Services). A dated and signed proof of pressure tests must be attached to the documentation on air management.
2
7.2.1.15     The components of the dampers must be designed ISO 16…. requrements (with a view so that microbiological growth that could contaminate the air management components or the system is prevented. ) 2
7.2.1.16     All parts of the air handling unit must be cleaned before the unit is put into service. Cleaning must be confirmed and documented. 2
7.2.1.17     Air management takes place with recirculated air, 70% is internal air. 2
7.2.1.18     Jointing can only be done by using a mildew resistant jointing compound. All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.2.1.19     Energy recycling takes place with heat exchanger. 3
7.2.1.20     Install HEPA filter (H14) in the end of the system in the clean room BEIJING MEDICAL FACTORY. 2
7.2.1.21     Include nipples to feed in the test aerosol in units equipped with a HEPA filter or where a HEPA filter can be installed. 2
7.2.1.22     It should be possible to install a pipe with an external diameter of 6 mm . 2
7.2.1.23     The placing and marking of the nipples must be documented in the drawings. 2
7.2.1.24     The requirement for the sealing test of the HEPA-filter (H14) and its fixture is <0.05 %. The upstream concentration of the test aerosol must be at least 10 µg/l. (A higher concentration may be required for stable measurement).
Test aerosol must be Emery 3004 or something equivalent regarding particle size. The testing method should be approved according to ISO 14644 and EN 1822 standards.
2
7.2.1.25     The upper limit value for the HEPA filter differential pressure must be possible to register in the Monitoring system, and the exceeded limit value will activate the alarm. 2
7.2.1.26     It must be possible to measure the pressure differential of F9 2
7.2.1.27     The air handling unit and all critical components thereof must be marked with specific, clear and hygienic labels. 2
7.2.1.28     HEPA filter (H14) is to be supplied with a filter certificate. The filter certificate must at least indicate the serial number, the filter class, the test method, the test standard and the scanning result. If a lower class of filter is installed, the filter class must be documented. 2
7.2.1.29     The serial number of HEPA-filter (H14)must be documented (for the sake of traceability). 2

7.2.2     Supply air diffuser

Requirement no. Description Code
7.2.2.1       Supply air must be brought in through ceiling diffusers. Exceptions are allowed if required by the process, to be approved by Nolato Medical Beijing. 2
7.2.2.2       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.2.2.3       It must be possible to set up the supply air diffusers against the ceiling. 2
7.2.2.4       The inlet air apertures must withstand common cleaning agents e.g. 70 % Iso-propil-alkohol, Bendurol Forte, Molarsolv EV07, 70%-os etil-alkohol, GERMIMED, VANTROPOL, MEDONAL, INTOMILD. The chemical certificate conforming this must be enclosed to the documentation. 2
7.2.2.5       When placing the inlet air apertures in the room, consider the activity therein. The location of the process equipment, the ventilation installations and lighting must not inhibit the mixing of the air. The impetus and the range must be taken into consideration in order to have peaceful air movement in the room. Choose the location in consultation with NOLATO. I
7.2.2.6       The supply air diffusers are positioned/distributed in the room as evenly as possible in order to avoid areas of stationary air. Positioning is documented in the drawings. 2

7.2.3       Exhaust air apertures

Requirement no. Description Code
7.2.3.1       Exhaust air must be led through apertures near the floor and in the roof above the injection moulds. Exceptions are allowed if required by the process approved by NOLATO. 2
7.2.3.2       All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.2.3.3       The extract air diffusers must be positioned /distributed in the room as evenly as possible in order to avoid areas of stationary air. Positioning is documented in the drawings. 2
7.2.3.4       Extract air diffusers in the room must be supplied with protecting grilles. The design must be approved by NOLATO. 2
7.2.3.5       The protecting grilles must be easily removed and reassembled. 2

7.2.4       Air apertures above

Requirement no. Description Code
7.2.4.1       NA  

7.3        Pipe systems and other ventilation installations

Requirement no. Description Code
7.3.1           The ducting must be made of galvanized sheets. 2
7.3.2           All materials used must be described in data sheets and specifications enclosed to the documentation. 2
7.3.3           The duct system must be equipped with inspection holes The choice of location takes place in consultation with Nolato. 3
7.3.4           There must be sockets in the pipe system to control the air flow. There must be sockets so that it is possible to control the air flow in every room. 2
7.3.5           Bore all the holes and install all the sockets and sensors before installing a pipe section. No drilling can be made to the pipes after they have been sealed. 2
7.3.6           All pipes must be cleaned and sealed up before installation so as to ensure that there are no metal particles or dirt in the pipes before and after installation. Inspect the pipe sections visually with a view to cleanliness before the contractor installs them. Document the results and enclose to the documentation. 2
7.3.7           As the work proceeds, seal up the canals at the end of each work phase and at the end of the working day. 2
7.3.8            The intake section and the exhaust section must be positioned  such a way that exhaust air is not drawn into the intake section. The intake section must be positioned in such a way that possible external odours and sources of contamination like exhaust gases are not drawn in.
Enclose a documentation explaining the choice of the location to the air management documentation. Take the effective main direction into consideration.
2
 

7.4        Air turnover

Requirement no. Description Code
7.4.1           There must be a process mode. 2
7.4.2           The air turnover measured in the incoming air must be ≥15 changes/h  for BEIJING MEDICAL FACTORY whole area 2
 

 

7.5        Differential pressure and air directions  

Info: The differential pressure must be constantly monitored through the Monitoring system.      
Requirement no. Description Code
7.5.1           The positive differential pressure from the BEIJING MEDICAL FACTORY to the unclassified halls must be ≥ 10 Pa under normal operating conditions. 2
7.5.2           The differential pressure must be measured and monitored over the sluice gates sides. The measurement points must be chosen in consultation with NOLATO. The differential pressure is presented on the layout, the pressure level and the air directions. 2
7.5.3           When setting the differential pressure, take eventual measuring errors in the calibration equipment and during inspection into consideration, and remember that the target value under normal operation should not be too close to the chosen alarm limit. The consequence of the target value being too close to the alarm limit is that fluctuations in the air management system and the opening of doors in the locks and rooms may result in false alarms . 2
7.5.4           The air must flow from ISO class 8 through the sluice towards the unclassified areas. 2
7.5.5           +10Pa  pressure diff.  from the unclassified part of the staff sluice gate towards the unclassified showing corridor. This is presented on the layout of the cleanliness category, pressure level and air directions. 2
7.5.6           The differential pressure meter must have a working range 0  to 50 Pa and a measuring uncertainty of ≤ 3 %.  
7.5.7           The manufacturing certificate must be presented in the case of critically important sensors. (differential pressure) 2
7.5.8           The differential pressure must be monitored and logged, and exceeded alarm limits must be recorded in the Monitoring system as alarms. 2
7.5.9           The excess of alarm limits must be indicated visually in the production rooms. (red lamp) 2

7.6      Climate

Info: The temperature and relative humidity must be measured/monitored via the Monitoring (all temp and humidity condition equal in all cleanroom area)
Requirement no. Description Code
7.6.1           The temperature in all classified rooms must be 20 ±3 °C. 2
7.6.2           The relative humidity must have a target value of 55% RH with a permitted variation of ± 20 % RH. See the specification of every room. 2
7.6.3           The temperature and air humidity must be logged in the Monitoring system. Limit excesses must be recorded as alarm. 2
7.6.4           Temperature sensors
Measuring range: 0 ... +40 °C or more
Measuring precision: 0.5 °C or better
2
7.6.5           Relative humidity sensor
Measuring range: 0-100% RH
Measuring precision at 0...+ 50 °C
 (0....100% RH) ±5. % RH
at 20°C (40….60% RH) ±3. %
2
7.6.6           The manufacturing certificate must be presented for critical sensors (temperature and relative humidity). 2

7.7      Air adjustments

Requirement no. Description Code
7.7.1           The automatic adjustment takes place when the building is intact and the air management equipment has been put into operation and tested. The result have to be included in the documentation. The setting procedure must be documented and approved by NOLATO. 2
7.7.2           The fine-tuned adjustment must take place when all process equipment have been delivered, installed and put into operation . The result have to be included in the documentation 2
7.7.3           While the fine-tuned adjustment is taking place, no other activity which may disturb the adjustment is allowed in the building. 2
7.7.4           All instruments used must be calibrated and are traceable to national standards with the help of the attached copies of certificate of calibration of the measuring instruments. Current method of calibration must be documented and the documents must be attached. 2
7.7.5           Protocols of air adjustment must at least include information on partial flow of supply air, extract air, measurings of differential pressure and air flow directions, as well as calculated air changes figures, and the HEPA filters integrity investigation. Air change figures must be calculated on the bases of the final supply air flows and the measured room volume. The contractor provides a measuring protocol that must be reviewed and approved by Nolato before the measurement starts. 2
7.7.6           The protocol must be dated and signed by all performers. 2
7.7.7           The documentation must be approved by NOLATO. 2
 

7.8      Storage rooms for products and materials

Requirement no. Description Code
7.8.1        NA 2
 

7.9      Compressed air systems

Requirement no. Description Code
7.9. 1      6,5-8 bar pressure, dehumidified, oil free 2
7.9. 2      0.1 µm technical filter 2
7.9. 3      Dew point -40 to -60°C 3
7.9. 4      Material: fulfill the ISO 14644 requirement 2
7.9. 5      Pipe dimension diam min 50mm 3
7.9. 6      The pipes must be closed off with valve 3
7.9. 7      The alarm function must be logged in the Monitoring system 3
 

7.10   Central vacuum cleaner

Requirement no. Description Code
7.10.1     There must be a central vacuum cleaner or the possibility to install one at a later time. 2
7.10.2     All material in the cleanroom must fulfil the cleanroom requirements ISO14644 class 8 2
7.10.3     The unit must be placed outside the cleanroom 3
7.10.4     The placement of outlets according to the relevant drawing 2
7.10.5      Maximum number of simultaneous users is 1. 3
7.10.6     The central vacuum cleaner must have a fire alarm 3
7.10.7     Consideration shall be taken to the desing of the piping work so that it minimized pressure drops. Bends need to be smooth and of large radiuses. 3

7.11 Water/drain

Requirement no. Description Code
7.11.1     There must be water/sewage in the personnel sluice acc . the construction documentation. The quality of water must meet the requirements of the Chinese water standards . 2
7.11.2     The water to the injection moulding machine and to the heaters must be led in a closed system; the water must be deionized and decalcified. 3
7.11.3     Cooling water temperature tool circle 16,5°C  +/- 1,5 ,machine oil cooling circle 23°C +/-1,5 3
7.11.4     Wash basins tap valves must be controlled by photo cells or by other similar technique which makes hand- to- faucet contact unnecessary. Wash basins must be easy to clean. 2

7.12   Clean air system

Requirement no. Description Code
7.12.1     NA 2

7.13   Raw material management for injection moulding

See in the URS of the material supply system:
BEIJING MEDICAL FACTORY project_material_supply_system_and_auxiliary_equipment

8         CALIBRATION

Info: Applies to all control and alarm sensors/measurement points in the Monitoring system.
Requirement no. Description Code
8.1            The control and alarm sensors in the system must be designed so that it is easy to implement regular calibration. I
8.2            Indicate in the document the sensors to be calibrated and present this to NOLATO. 2
8.3            The supplier should supply methods of calibration and calibration frequency for sensors. 2
8.4            The critical sensor must be calibrated at the time of delivery and calibration certificate must be attached. The calibration method used must be compatible with the national standard. 2
8.5            All reference instruments must be calibrated and compatible with the national standard. A copy of the calibration certificate must be enclosed to the documentation. The certificate must contain information on calibration points, date of calibration and the next date for calibration. 2
8.6            All critical sensors must be calibrated and the results must be presented in a calibration certificate or calibration report. The certificate/report must include information regarding the identification of the sensor (unique ID), the calibration method, the identification of the reference instrument, the calibration interval, the calibration points, the acceptance criteria, the results, the date of calibration, the next calibration date and the date and signature. 2
8.7            All applied software must be validated  
 

9         REGULATORY REQUIREMENTS

Requirement no. Description Code
9.1            The delivered equipment must be in compliance with all EU legislation and regulations effective as of the date of the order. 3
9.2            The delivered equipment must be CE-marked. 3
9.3            The installation must be used to produce and install components of medical technical products and must meet the ISO 13485 standard. I
9.4            The installation must meet the requirements of MSZ-EN-ISO 14644-1 to MSZ-EN-ISO 14644-8 for the number of particles and for the measurement methods. The recommendations concerning the design and operation of the installation must be taken into consideration. I
 

10   REQUIREMENTS ENVIRONMENT AND SAFETY

Requirement no. Description Code
10.1         Noise levels ≤ 85 dB (A) 1
10.2         All warm surfaces should be clearly marked 1
10.3         Surfaces potentially causing injury by crushing or squeezing should be clearly marked 1

11   CHANGE CONTROL

Requirement no. Description Code
11.1         All changes should be investigated and decisions/approvals should be documented in e.g. memos and meeting minutes. I
11.2         All changes in design must be documented in the relevant design document. I
11.3         All design documentation must be updated in versions. Changes must be documented in the documentation history including at least the date of the change, its description, the responsible/implementing person. I
 

12   REQUIREMENTS DOCUMENTATION

12.1   General proMonitorings

Requirement no. Description Code
12.1.1         Every document must have a unique ID and must be updated in versions. I
12.1.2         References to other documentation must be clear, also featuring unique identifiers. I
12.1.3         The instruction documents/manuals must be in Hungarian. Other documents can be in English or in Hungarian. I
12.1.4         All documents must be signed and dated. I
12.1.5         Raw data/results, dates and signatures must be written in archiving- resistant ink. I
12.1.6         When changing a result or a text, cross the affected part with a line so that the result or the text can still be read. Provide the reason for the change in writing. I
 

12.2   Documents from the project implementation/contractor

(in case of contradiction between the contract and the requirement specification, consult NOLATO about the way forward.)
Requirement no. Description Code
12.2.1         The project implementation/contractor must deliver the documentation according to the following:
·         Construction documents incl. technical documents and drawings
·         Relations documents (“as built” documents including the technical documents, drawings and sketches, D drawings)
·         Supplier quality project control programmes
·         Technical documents and data sheets for critical components
·         Functionality descriptions
·         Reports/documentation on adjustments, controls, tests and probes
·         Technical manuals for operation and maintenance of all input equipment/components
·         Manuals for all input software, including system software, applications and development tools for continued maintenance.
·         Validation report of all software applied
·         Instructions manuals for  use of the systems, equipment, etc.
·         Calibration certificates and methods
·         Parts lists and critical part list, preventive maintenance plans
·         IQ validation protocol & report
2
12.2.2         All test documents must be dated and signed by the contractor and signed and checked by NOLATO The contractor is responsible for the existence of signing and dating fields. I
12.2.3         Test readyness control/coordinated testing
Installation controls can be implemented when a system, e.g. the air management system or the cleanroom, is installed.
Own controls must be implemented so as to verify that the system is ready for a coordinated test.
a)    The project implementation /contractor must prepare the minutes for the own control and the coordinated test. The protocol for the own control or the coordinated test must define what tests should be implemented as per NOLATO’s requirements laid down in this specification. In case of a coordinated test check if the systems function according to the requirements laid down for their relevant environment.
b)     The own control- and coordinated test protocol must be delivered to NOLATO five (2) weeks before the test at the latest.
c)    The own control must be presented to NOLATO for review and eventual updating before the installation starts.
d)    The project implementation/contractor must write a report about the own control and the coordinated test. 
I
12.2.4         All design documentation must be approved by NOLATO. I
12.2.5         All test documentation must be approved by NOLATO. I
12.2.6         All documentation must be handled in a safe and controlled manner. I
12.2.7         Documents that are part of the final documentation must be delivered in at least two copies. One original and one copy. 2
 

13     VALIDATION AND QUALIFICATION

Requirement no. Description Code
13.1             The premises must be qualified before production starts. 1
13.2             The IQ is responsibility of the contractor (IQ protocol and report approved by Nolato is a must to take over the premises)
Implement a final review of the “Test readyness control/coordinated testing“ and have it approved by NOLATO before IQ starts.
1
 

14   REQUIREMENTS FOR MAINTENANCE AND SERVICE

Requirement no. Description Code
14.1         The contractor must draw up a list containing the parts of all input equipment/systems & spare part list and critical part list (Sub-supplier identification). 2
14.2         The supplier must prepare a maintenance- and service plan in colaboration with Nolato. 2
 

15   TRAINING

Requirement no. Description Code
15.1         The contractor must provide training courses for those members of Nolato’s staff who will be in charge of the equipment and the systems. 2
15.2         The contractor must supply proof of training courses provided for NOLATO’s staff after the courses are performed. 2
15.3         The contractor must be responsible for the costs of the training. 2
15.4         The contractor must provide course material for NOLATO’s future internal trainings. 2
 

16   REFERENCES

·         MSZ EN ISO-14644-1 “Clean rooms associated controlled environments Part 1- Classification of air cleanliness”
·         MSZ EN ISO-14644-2 “Clean rooms and associated controlled environments, Part 2: Specifications for testing and monitoring to prove continued compliance with ISO 14644-1”
·         MSZ EN ISO-14644-3 “Clean rooms and associated controlled environments - Part 3: Test methods”
·         MSZ EN ISO-14644-4 “Clean rooms and associated controlled environments, Part 4: Design, construction and start-up”
·         MSZ EN ISO -14644-5 “Clean rooms and associated controlled environments, Part 5: Operations”
·         MSZ EN ISO-14644-6 ”Clean rooms and associated controlled environments, Part 6: Vocabulary”
·         MSZ EN ISO-14698-1” Clean rooms and associated controlled environment, Biocontamination control, Part 1: General principles and methods”
·         MSZ EN ISO-14698-2 ” Clean rooms and associated controlled environments, Biocontamination control, Part 2: Evaluation and interpretation of biocontamination data”
·         44/2005.X 10.19 EüM rendelet melléklete (GMP EUDRALEX, volume 4, annex 1.)
·         SS-EN 1822 Highly effective air filters (HEPA and ULPA)
·         AMA 98 General material and work description
 

17   ATTACHMENTS

Room functionality programme
Interlock plan

VERSION MANAGEMENT
 
Version Date Changed Prepared by
1 2013.07.17 1st edition Jonas Porat
       
 

世聯翻譯-讓世界自由溝通!專業(yè)的全球語言翻譯供應商,上海翻譯公司專業(yè)品牌。絲路沿線56種語言一站式翻譯與技術解決方案,專業(yè)英語翻譯、日語翻譯等文檔翻譯、同傳口譯、視頻翻譯、出國外派服務,加速您的全球交付。 世聯翻譯公司在北京、上海、深圳等國際交往城市設有翻譯基地,業(yè)務覆蓋全國城市。每天有近百萬字節(jié)的信息和貿易通過世聯走向全球!積累了大量政商用戶數據,翻譯人才庫數據,多語種語料庫大數據。世聯品牌和服務品質已得到政務防務和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認可。
  • “貴司提交的稿件專業(yè)詞匯用詞準確,語言表達流暢,排版規(guī)范, 且服務態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達質量得到很大提升”

    華東建筑設計研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準的服務,得到了國外合作伙伴的認可!”

    世萬保制動器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學研究軟件、儀器和集成系統的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強,翻譯難度較大,貴司總能提供優(yōu)質的服務。”

    諾達思(北京)信息技術有限責任公司

  • “為我司在東南亞地區(qū)的業(yè)務開拓提供小語種翻譯服務中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時翻譯質量和速度也得到我司的肯定和好評!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質量實在不敢恭維,所以當我認識劉穎潔以后,對她的專業(yè)性和貴公司翻譯的質量非常滿意,隨即簽署了長期合作合同�!�

    銀泰資源股份有限公司

  • “我行自2017年與世聯翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對我行提出的要求落實到位,體現了非常高的專業(yè)性。”

    南洋商業(yè)銀行

  • “與我公司對接的世聯翻譯客服經理,可以及時對我們的要求進行反饋,也會盡量滿足我們臨時緊急的文件翻譯要求。熱情周到的服務給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復雜,試譯多家翻譯公司,后經過比價、比服務、比質量等流程下來,最終敲定了世聯翻譯。非常感謝你們提供的優(yōu)質服務�!�

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強,涉及面廣,翻譯難度大,貴司總能提供優(yōu)質的服務。在一次業(yè)主單位對完工資料質量的抽查中,我司因為俄文翻譯質量過關而受到了好評�!�

    中辰匯通科技有限責任公司

  • “我司在2014年與貴公司建立合作關系,貴公司的翻譯服務質量高、速度快、態(tài)度好,贏得了我司各部門的一致好評。貴司經理工作認真踏實,特此致以誠摯的感謝!”

    新華聯國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強的專業(yè)性,貴公司的德文翻譯稿件和現場的同聲傳譯都得到了我公司和合作伙伴的充分肯定�!�

    西馬遠東醫(yī)療投資管理有限公司

  • “在這5年中,世聯翻譯公司人員對工作的認真、負責、熱情、周到深深的打動了我。不僅譯件質量好,交稿時間及時,還能在我司資金周轉緊張時給予體諒�!�

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯翻譯一直保持著長期合作關系,這家公司報價合理,質量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對方也很認可。”

    北京世博達科技發(fā)展有限公司

  • “貴公司翻譯的譯文質量很高,語言表達流暢、排版格式規(guī)范、專業(yè)術語翻譯到位、翻譯的速度非�?�、后期服務熱情。我司翻譯了大量的專業(yè)文件,經過長久合作,名副其實,值得信賴�!�

    北京塞特雷特科技有限公司

  • “針對我們農業(yè)科研論文寫作要求,盡量尋找專業(yè)對口的專家為我提供翻譯服務,最后又按照學術期刊的要求,提供潤色原稿和相關的證明文件。非常感謝世聯翻譯公司!”

    中國農科院

  • “世聯的客服經理態(tài)度熱情親切,對我們提出的要求都落實到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責,獲得與其共事的公司總部同事們的一致高度認可�!�

    格萊姆公司

  • “我公司與馬來西亞政府有相關業(yè)務往來,急需翻譯項目報備材料。在經過對各個翻譯公司的服務水平和質量的權衡下,我們選擇了世聯翻譯公司。翻譯很成功,公司領導非常滿意。”

    北京韜盛科技發(fā)展有限公司

  • “客服經理能一貫熱情負責的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協助我方建立專業(yè)詞庫,并向譯員準確傳達落實,準確及高效的完成統一風格。”

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對翻譯項目進行了幾次詳細的會談,期間公司負責人和廖小姐還親自來我社拜訪,對待工作熱情,專業(yè)度高,我們雙方達成了很好的共識。對貴公司的服務給予好評!”

    東華大學出版社

  • “非常感謝世聯翻譯!我們對此次緬甸語訪談翻譯項目非常滿意,世聯在充分了解我司項目的翻譯意圖情況下,即高效又保質地完成了譯文�!�

    上海奧美廣告有限公司

  • “在合作過程中,世聯翻譯保質、保量、及時的完成我們交給的翻譯工作�?蛻艚浝砉ぷ鞣e極,服務熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝�!�

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項目與你們相識乃至建立友誼,你們報價合理、服務細致、翻譯質量可靠。請允許我們借此機會向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯的翻譯質量,交稿準時,中英互譯都比較好,措辭和句式結構都比較地道,譯文忠實于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應也不錯�!�

    TNC大自然保護協會

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務,因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準的服務,給我們留下了非常深刻的印象�!�

    北京師范大學壹基金公益研究院

  • “在與世聯翻譯合作期間,世聯秉承著“上善若水、厚德載物”的文化理念,以上乘的品質和質量,信守對客戶的承諾,出色地完成了我公司交予的翻譯工作�!�

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項目要求時間相當緊湊,所以世聯在保證質量的前提下,盡力按照時間完成任務。使我們在世博會俄羅斯館日活動中準備充足,并受到一致好評�!�

    北京華國之窗咨詢有限公司

  • “貴公司針對客戶需要,挑選優(yōu)秀的譯員承接項目,翻譯過程客戶隨時查看中途稿,并且與客戶溝通術語方面的知識,能夠更準確的了解到客戶的需求,確保稿件高質量。”

    日工建機(北京)國際進出口有限公司