国产精品人人爱一区二区白浆_国产我不卡午夜伦理_免费电影亚洲一级黄片_国产午夜福利久久_51视频在线观看免费国产_天堂AV网手机版_国产精品毛片一区二_印度女人性液_日韩大片91免费观看视频播放_日本欧美国产精品第一页久久

手機(jī)版
1 2 3 4
首頁 > 新聞中心 > 行業(yè)新聞 >
行業(yè)新聞

上海翻譯公司完成工程類英文翻譯

發(fā)布時(shí)間:2018-03-16 08:52  點(diǎn)擊:

上海翻譯公司完成工程類英文翻譯
SPECIFICATION FOR SITE OFFICE AND SIGN BOARD GENERAL  PRICING PREAMBLE
BILL OF QUANTITIES
 
SITE WORK AND PRELIMINARIES ROADWORKS
ELECTRICAL WORKS TELECOM DUCTING WORKS SECURITY DUCTING WORKS WATERWORKS
STORM WATER WORKS SEWERAGE WORKS IRRIGATION WORKS LANDSCAPING WORKS
 
SECTION 5
 
SECTION 6
 
SUMMARY OF THE BILL OF QUANTITES (S) DAY WORK SCHEDULE (DW)
 
(a) Manpower
 
(b) Material
 
(c) Equipment
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
Abu Dhabi Police GHQ- Police Projects Committee intends to construct the main infrastructure of the new  Training  Village  at  Al  Hafar.  The pro 丿 ect site is  approximately  1.0  km  by  2.0 km located
approximately 6 km north of Abu Dhabi - Al Ain highway, refer to site location map & Key plan drawings contained in Vol.4 of the tender documents. The project consists of the following zones:
. ZONE A -  Main Administration
. ZONE B - Maintenance and Services
. ZONE C - lndoo 「 Ranges
. ZONE D -  Public Order
. ZONE E - Arms and Explosives
. ZONE F -  Urban Zone
. ZONE G -  Prison Zone
. ZONE I - Anti Narcotics
. ZONE J - Crime Scene ZONE K - Dog Training ZONE L -  F7 Zone
. ZONE M -  Driver Training
. ZONE 0-AirWing Zone
The scope of work includes supply, install, construct, test and commission of the main infrastructure which includes the following disciplines:
 
 
The earthwork for the entire project was part of a separate contract, however Contractor is required to undertake the earthwork related to the installation of the specific infrastructure as per the Tender Documents and the authorities general and standa「ds and guidelines.
 
The scope of work is detailed further in the following sections.
 
Contractor shall read this document in conjunction with the full set of the Tender Documents which includes Tender Drawings and shall comply in all respect to the requirements of the relevant service departments/authorities for these wo「ks.
 
The existing services, if shown, on the drawings are for information purposes only and do not necessarily show exact locations, depths, spacing, smaller branches of utilities and services which are not normally indicated on such drawings, nor the possible existence of other underground utilities and services.
 
The Contractor shall be responsible for investigating the soil / ground conditions and shall make all the necessary soil investigation and subsurface investigation as he may require to fully familiarize himself  with the  properties  of  the  soil and  shall be deemed  to  have included  in  his  tender all
materials, plant services, labour and provisions as may be required for all earthwork to complete the Works.
 
The Contractor shall provide all necessary protection for the existing services as may be requ「i ed by his works operations and to the satisfaction of the owning authorities and the Engineer
 
The Contractor shall carry out all the necessary tests to establish the suitability of the borrow materials, the placed borrow material and the ground exposed as a result of the cut operation shall be evenly compacted in accordance with the relevant terms of the specifications and as directed by the engineers
 
Infrastructure Disciplines:
 
1. Road Works
 
Abu Dhabi Police Training Village (ADPTV) will be constructed on pre-graded area of approximately 1.00km x 2.00km. Grading of village is part of separate contract. Road works include tying into existing road, earthwork, signs and marking, roadside furniture, footpath/sidewalk and other related
construction. Construction shall be according to the drawings & specification included with this tender.
 
Roadway construction shall consist of asphaltic wearing course, asphalt binder course, asphalt concrete base course, aggregate base and granular sub-base. Signage to be provided shall include warning, regulatory signs appropriate to traffic construction: in addition to temporary sign required during construction period. Roadway construction is under this tender is only limited to the entrance of each zone/plot, any details inside the plots even if shown on the drawing shall be considered fo 「information only.
 
Summary of scope of road works includes but not limited to the following
 
13.00 km of single carriageway
 
1.20 km of dual carriageway with
 
1.60 km of access road to utilities building
 
2 no. new access from exiting/upgraded road to ADPTV.
 
2.00m wide footpath/walkway along the road.
 
30 no.s raised pedestrian crossings
 
48 no.s of speed control hump
 
Road signs and marking
 
FOR TENDER ONLV
'""'°"' I  旦 CT
TE巳ODIN M.E . Ltd.
 
 
 
2. Telecom and Electrical Works
 
2.1 11kV Network
 
Supply, install, test and commission the 3CX300 sq.mm Cu/XLPE 11KV cable as per ADDC specifications, from 33/11kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply, install, test and commission the 3CX120 sq.mm Cu/XLPE 11kV cable as per ADDC 的 m Ring main unit up to the transformer as per the d「awings.
 
Supply, install , test and commission 32 core Fibre optic cable from 33/11 kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply and install the Fiber optic cable chambers as per the drawings and as per ADDC standards.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
All the substation equipments, as per pro 」ect requirement shall be supplied and installed by the contractor as per ADDC requirement.
 
Supply, install, test and commission distribution transformers, RMUs, earthing of the equipments, and all necessary fitments including connections to the EFls as per ADDC specification and drawings.
 
All the protection requirements including but not limited to protection setting calculations shall be provided by the contractor as per ADDC specifications.
 
 
 
2.2 Street Lighting System
 
Supply, install, test and comm1ss1on the 3CX10 sq.mm Cu/XLPE cable as per ADM specifications from street lighting control cabinet to street lighting poles as per the drawings.
 
Supply, install, test and commission the street lighting system including street lighting control cabinets, street lighting poles and light fixtures with all the necessary fitments as per ADM specifications, as pe 「 the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADM, client and other authorities.
 
Street lighting system should be fed from the substationTRM04/M. All the LV cables required to be laid between the substation LV panel and the service cabinets should be supplied and installed by the contractor.
 
All the substation equipments shall be supplied and installed by the contractor as per ADDC requirement and as per project requirements.
 
 
 
2.3 Telecom
 
Supply and install the 4-way telecom ducts as per the drawings
 
Supply and install the JRC-12 and JRC-14 manholes as per the drawings
 
Contractor shall supply and install all the cables of telecom system.
 
Preparation of shop drawings and as-built drawings as per the requirements of Etisalat and client.
 
 
 
2.4 Structured Cabling System
 
Supply and install the 9-way security ducts, JRC-12 and JRC-14 manholes and all the cables of structured cabling system as pe「 the drawings and specifications.
 
Construct the Police Main IT building as per the details indicated in the specification and drawings as per project requirement including but not limited to raised floor, cable trays, etc. as
pe「 GHQ specifications as per project requirements.
 
Contractor shall supply, install, test and commission Tetra tower system with all the associated works including the power as per the drawings, specification and project requirement.
 
Preparation of shop drawings and as-built drawings as per the client's requirements.
 
2.5 LV Network
 
Supply, install, test and commission LV service cabinets including earthing and necessary fitments as per ADDC specifications and drawings. The arrangement to feed the  service cabinets from the LV panel in TRM-04 M is also included in the SCOPE. This shall also include supply install test and commission the LV cables as per the ADDC specifications and RSB guide lines. All the necessary calculation to justify the cable size shall be provided by the contractor
 
Supply, install, test and commission 4CX95 sq.mm Cu/XLPE cables as per ADDC/ADM specifications to feed the street lights control cabinets from the service cabinets as per the drawings and as per the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
3. Water Works
 
The scope of for water works shall include but not limited to the following:
 
Supply, installation and construction of new 0D250 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents including all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works as per the details indicated in the specification and drawings
 
Supply, installation and construction of new 0D180 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 0D160 HOPE Pipeline of within the approved pipeline route as pe 「 the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 00110 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply  and installation  of  all  necessary  fittings,  gate  valves,  contro.l  valves ,  Electromagneitc flow meters and 閑 ated accessories as per the details indicated in the Tender Documents.
 
Supply and construction of Road Crossing ducts (concrete encased GRP ducts) as per the details indicated in the Tender Documents.
 
All necessary connections/disconnections to be made between the new/relocated waterlines and the existing system as per the details indicated in the Tender Documents
 
Construction  of  Civil  works  including  valve  chambers,  bulk  consume「  chambers, fire hydrant boxes, protection slabs, water ducts at road crossings, sign posts and marker posts all as pe 「the details indicated in the Tender Documents.
 
Supply and construction of reinforced concrete slabs for waterline under roads and parking areas as per the details indicated in the Tender Documents and/o「 directed by the ENGINEER.
 
Carryout all required safety measures and temporary facilities for pedestrian and vehicles according to HSE requirements and procedures to ensure public safety during the execution of the project.
 
Removal, shifting or transplantation of the trees/plants in conflict with waterline route to the locations as approved by the concerned authorities
 
 
 
Removal and reinstatement of tiles, green and asphalt area, etc.
 
Successfully conducting the preliminary and final hydraulic pressure testing, disinfecting and flushing of the completed waterlines prior to commissioning and connection/disconnection to the existing water network system.
 
With respect to construction, testing, sterilising and commissioning etc. the following shall be taken into consideration:
 
o All construction work shall be conducted with the minimum possible disturbance of the water supply serving consumers who are already connected to the existing system.
 
o The CONTRACTOR shall liaise fully with the ENGINEER and ADDC in order to temporarily shut down existing live pipelines  if necessa ry, in order to carry out the WORKS.
 
All other associated works necessary to successfully  complete all above works
 
 
 
4. Storm Water
 
The objective of the storm wate 「 system of Abu Dhabi Police Training Village is to provide cost efficient means of collecting and disposing storm water run-off to a suitable location (Pond / Lagoon) to prevent flooding as a result of rainfall event as shown in the Tender Documents and bill of quantities.
 
There is existing storm water system (collection & disposal) within and adjacent to the project area and a proposed storm water system to be provided in the future. Howeve 「 Contractor is responsible to examine the area and obtain any information from the authorities on potential existing utilities
befo「e excavation.
 
4.1 Storm water system - Pipes & Manholes
 
The storm water system mainly is divided to two pipelines connected to each others:
 
Collection Lines:
 
Normally have pipe dia. of 300mm with average slope of 0.5%. The collection lines shall have rectangular chambers to be installed as inlets. Majorly, two types of inlets are available in network; Inlet chamber & Catch-basins. Both chambers shall have it own arrangement  in supply, excavation & installation. The required chambers a「 e proposed to be installed in two different locations, on curb edge as kerb inlet and the other within road way as flush inlet
 
Main Lines: Varies as followinq:
 
1. 300, 400 & 500mm diameters-uPVC at average depths of 1.0 - 4.0m with average slope of 0.25%, 0.17% & 0.15%, respectively. The manholes proposed along these pipes are storm water circular manholes (Type-4) with internal dia. of 1.1m. the average distances between manholes aren't exceeding 1OOm , maximum.
 
2. 600, 700 & 800mm diameters-GRP at average depths of 1.0 - 3.0m with average slope of 0.14%. The manholes proposed along these pipes a「 e storm water rectangular manholes with circular  shafts (Type-5)  with internal dia. of 1.1m and intermediate slap as per ADM
standa「ds. The average distances between manholes aren't exceeding 120m, maximum.
 
4.2 Retention / Infiltration Pond:
 
The proposed SW pond is located at North/East corner of PTV area. The pon.d shall work as retention / infiltration pond for the expected amount of flow conveyed through SW pipelines. The out fall pipe discha 「 ging to the pond shall has non-return valve (Flap valve) at its open end. uPVC perforated  pipes  are proposed  surrounding  the  pond  circumference in  order  to  filtrate  SW into
su「r ounding natural ground.
 
5. Sewerage Works
 
The sewerage network of ADPTV is designed to deal with the estimated peak flow  from all zones and to collect the sewage into the temporary proposed holding tank. The collected sewage shall be transferred by tankers to the nearest existing STP in coordinatoi n and approval of the ADSSC.
 
Sewage generated from each zone wilt be collected via manholes insfalled at each zone boundary, then discharging the collected sewage by a system of gravity sewers and manholes into the holding tank. Due to the excessive depth of the inlet pipe of the holding tank, a lifting station is proposed to lift the sewage and discha「ge into the holding tank.
 
The sewerage network contains the following components:
 
5.1 Sewerage Pipelines and Manholes
 
The material of sewerage pipelines is uPVC with diameter varies from  160mm  to 300mm. One typical manhole with internal diamete「 of 1.50m is used.
 
The contractor shall provide / include in his construction works the main supply pipe up to the boundary limit (fence) of the current development providing end cap for future connection
 
5.2 Pump Stations
 
One pumping station is required. The pumping station has 1 duty and 1 standby sub mersible pump installed within a wet well receiving sewerage from a gravity collection network and discharging the flow into the discharge chamber then throughgravity sewers to the holding tank.
 
The type of the station will be type 1 as the flow is less than 100 I/sec.
 
The pumps are selected to delive 「 the required flow at calculated total head. Pumps are of submersible type with non-clogging mixed-flow impellers. Pumps and motor drives are selected to satisfy the final design flow. The internal diameter of the wet well will be 3.2 m as shown in tender drawings.
 
5.3 Holding tank
 
A temporary holding tank is to be constructed in the north side of ADPTV. The holding tank is divided into two compartments.  It will be furnished with inlet pipe receiving flow from the discharge chamber In addition, outlet pipe will be provided and furnished with end cap/plug to allow for future connection once the planned sewerage treatment plant is completed and operated
 
6. Irrigation Works
 
lrriHation Network
 
The scope of works comprises the installation and testing of the irrigation network of the training village as detailed in the Tender Documents. Contractor shall install all the necessary irrigation appurtenances complete in all respect as per drawing details and specificationas follows:
 
1. DN250mm dia. Pipe Class-D (1O")
 
2. DN200mm dia. Pipe Class-D (8")
 
3. DN100mm dia. Pipe Class-D C4")
 
4. DN75mm dia. Pipe Class-D (3")
 
5. DN50mm d舊.Pipe Class-D (2")
 
6. DN38mm dia. Pipe Class-D (1-1/2")
 
7. DN25mm dia. Pipe Class-E (1")
 
8. DN250mm gate valve (1O")
 
9. DN200mm gate valves (8")
 
10. DN100mm gate valves (4")
 
11. DN100mm Zone demand points (4")
 
12. 2" Air-Vacuum valves
 
13. 4" Wash-out valves
 
14. Irrigation decoder cables (AWG #14)
 
15. 4 Station stand alone type controller at the main entrance roundabout
 
16. 1" solenoid valves along the main entrance road
 
17. Drippers and dripline tubing along the main entrance road lrriqation Tank and Pump Room:
The  irrigation  tank  and  pump  room  shall  be  for  future  installation,  howeve「, the  contractor  shall provide/ include in his construction works the main supply pipe (DN250mm) up to the boundary lim 仆(fence) of  the current development  and provide pvc end cap  fo 「 future connection
 
Additional Contractor's scope of work is installation/ construction of the following:
 
 
 
Page 10 of 13
 
 
 
1. DN75mm (3") pvc solenoid valve risers with end cap
 
2. DN25mm (1") pvc quick coupling valves risers/connection with end cap
 
3. Termination of decoder cables at the proposed location of decoder cont「olle「s and the proposed location of solenoid valve risers.
 
4. Provision, installation, testing and commissioning of standard 4 station cont 「 olle 「 at the main entrance road
 
5. p 「 ovision, installation, testing and commissioning of 1" solenoid valves at the main entrance road
 
6. Provision, installation, testing and commissioning of irrigation cables at the main entrance road
 
7. Provision, installation, testing and commissioning of drippers and dripline tubing at the main entrance road
 
The main irrigation network is for futu「e utilization in anticipation when treated sewage effluent (TSE) irrigation water shall become available at the fac小ty. The Contracto「 therefore, shall take every steps and consideration to install the main irrigation network in its fullness, whereby future excavation shall be avoided, except for the installation of the solenoid valves, the two (2) decoder controllers, quick coupling valves, the secondary and tertiary irrigation lines downstream of the solenoid valves.
 
 
 
7. Landscape Works
 
The landscape works shall comprise of soft and hardscape works. The quantity of the landscape drawings have been modified to address the unavailability of treated sewage effluent irrigation water. The modification involves the replacement of softscape with gravel mulching and ornamental pebbles.
 
The only place for softscape is in the main entrance  road of the tac 仆 ity. The 「 est of the previous  area of  softscaping  works are now replace with ornamental  pebbles and gravel mulching.
 
The softscape  works  at  the  main entrance road  comp「ises of  installation and maintaining  for one year the plantation as follows:
 
1. Palm Trees = 9 nos
 
2. Ornamental Trees = 26 nos
 
3. Shrubs and ground cover   = 785 m2
 
Estimate of the gravel mulching quantities to be laid in place of the softscape works are as follows:
 
1. Type 1 Ornamental Pebbles= 450 m3
 
2. Type 2 Ornamental Pebbles= 210 m3
 
3. Type 3 Ornamental Pebbles= 230 m3
 
4. Type 4 Ornamental pebbles= 270 m3
 
 
5. Type 1 Gravel mulch
 
6. Type 2 Gravel mulch
 
7. Type 3 Gravel mulch
 
= 2,270 m3
 
= 1,280 m3
 
= 650 m3
 
 
The ornamental pebbles and gravel mulch we「e estimated at a depth of 75mm and the above figures are indicative only. Con「t actor shall be responsible in verifying the quantities shown above.
 
Included in tender drawings are the original approved landscape drawings. Cont「actor shall take note to disregard the softscape design in these drawings, Contractor shall consider only the hardscape such as trash bins, benches, walkway and pavements, and water feature details as follows
 
1. Trash Bins details
 
2. Benches details
 
3. Roundabout pavement details
 
4. Pavement and walkway details
 
 
 
5. Water feature details
 
6. Fountain at the roundabout
 
7. Electrical landscape lighting at the main entrance of the facility
 
Contractor shall be responsible in assessing the practicality and complicity of the hardscape design on walkways, pavements, water fountain and water feature and accordingly produce its own shop drawings for final approval.
 
The Contractor shall in his own discretion and experience, consider in his bid items that are not shown / mention in any of the tender documents but are necessary in completing the irrigation and landscape works as envisioned in this tender.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
 
Temporary offices at the site for government officials and the consultant Staff
 
Number of offices on the site is depending on the number of consultant's supervision staff. The offices area is as follows:
.Authority Representative
 
Soil Laboratory Room:
 
The area of soil laboratory shall be (18 m2) and the area of restroom shall be (2 m2) with add巾onal room of (20 m2) if needed. All the rooms shall be air-conditioned.
 
These areas do not include the corridors.
 
Offices furniture for government officials and the Consultant Staff
 
Government official Office
 
Large desk and desk chair +4 chairs + center table + corner table.
 
Project Manaqer Office
 
Large desk and desk chair+ 2 chair + Sofa set number 4+ center table + corner table + Documents cabinet.
 
su  ervision en  ineer or surve   or materials  en  ineer Offices: Desk and desk cha 「i + 2 chairs + corner table + Documents cabinet A small desk and cha 「i + Documents cabinet
Laboratory
 
Office and Office Chair + 2 chairs + Documents cabinet  
FOR  TENDER ONLV
2 2 OCT 2012 PAR.
,,, .  .   .. .,.,,, L-
TESOOIN M.E. Ltd.
Page 1 of 2
 
Meetinq Room Table+ 8 Chairs
Kitchen
 
12 ft Refrigerator +2 Flame Cooker+ Plates Cabinet+ Cooking and plates tools to serve the supervision staff (minimum number of 6 people)
 
All offices are air-conditioned SPECIFICATION FOR SIGN BOARDS
The specification of the sign board shall be in accordance with the drawing that is enclosed in Contract Drawings Vol. 4.
 
1. The Bills of Quantities he 面 n, including all notes and instructions shall form an integral part of the CONTRACT. However, the descriptions contained in the Bills of Quantities for each item are not necessarily complete. The CONTRACTOR is referred to the CONTRACT and APPENDICES, SPECIFICATIONS and DRAWINGS as well as the relevant Standards and Codes of Practice for further information, as no claim or VARIATION will be considered on account  of the Contractor's failure  to do so.
 
2. The CONTRACTOR shall familiarize himself with all documents comprising the CONTRACT including, but not limited to, the DRAWINGS and SPECIFICATIONS (o 「 any other information that can be reasonably inferred from any of them)  and  all obligations contained  in  the CONTRACT shall be included in the rates and prices entered herein, even if specific items relating to such obligations are not listed in the Bills of Quantities.
 
3. The CONTRACTOR'S unit rates shall be fully inclusive of the work described and must include all related work, accessories or consumable materials , incidental labou 「 , supervision, administration, tools, construction equipment, overheads,  profit and all costs and expenses  that may be required for the completion of the work described, together  with all costs and expenses in complying with all
genera「l isks, liabilities and obligations set forth or implied in the CONTRACT
 
4. DRAWINGS, SPECIFICATIONS and Bills of Quantities and all other CONTRACT Documents a 飛complementary and if any item is included in any of them, it shall be deemed included in all,
 
5. The CONTRACTOR'S lump sum price for the entire WORKS shall provide for the superv 閣 on of any or all t「 ades that are not intended to be performed with his own forces. No extra compensation for services as a General CONTRACTOR will be paid.
 
6, The lump sum amount entered by the CONTRACTOR  in  the Bills of Quantities shall constitute the entire claim for compensation fo 「 the WORKS under this CONTRACT in accordance with the conditions of contract. The WORKS shall not be re-measured  and  will be subject  to  adjustment  only as a result of VARIATIONS. The Bills of Quantities will therefore be used as a Schedule of Rates to enable pricing of VARIATIONS.
 
7. The CONTRACTOR  shall, prior to submission of his tende「, request w「itten clarification from the ENGINEER of any point he considers being a majo「 omission from the Bills of Quantities, and the ENGINEER shall issue instructions  in response to each  request.  Notwithstanding the  foregoing, the Contractor shall be responsible for ensuring that his Unit Rates and Lump Sum Price are inclusive of all discrepancies in description or quantity contained in these Bills of Quantities, as no adjustment to quantities will be made,
 
8. After submission of Tenders, it will be deemed that the value of  any  discrepancy  has  been included in the Tender sum, that all billed quantities are accepted as co 「 rect, sub 丿 ect to any adjustments  instructed  by the ENGINEER. Consequently,  no claim whatsoever will be entertained in respect of any discrepancy between individual Documents comprised in the CONTRACT.
 
9. The CONTRACTOR is required to check the numbers of the pages of the Bills of Quantities and should any be found missing or in duplicate or the figures or writing indistinc,t the CONTRACTOR shall  notify the  ENGINEER  at once and have the matter rectified before  the date of submission of
Tenders.  No  Liability  whatsoever  will  be  entertained  in  respect   of  a  y  c aim   or  error 1
CONTRACTOR'S  tender resulting from failures to comply with the foregoli: LY
 
10. Unit rates may be used reciprocally in the settlement of accounts unless conflict between them occurs. The CONTRACTOR is, therefore, to ensure that identical items occu 「 ring  in separate Bills are not priced at different rates unless this is his  deliberate intention.
 
11. The Bills of Quantities have been measured generally in accordance with the Rules of POM (I) (as here below defined). In any case in the Bill of Quantities where the  method  differs,  then  the method expressed must be accepted and measured in accordance therewith. Notwithstanding the above, the following Pricing P「 eambles are offered only as an amplification or clarification to billed descriptions.
 
12. Items in the Preambles Section of  these Bills of Quantities are deemed  to qualify and  to form part of every description of measu「ed work to which they refe「 including composite descriptions.
 
13. The CONTRACTOR shall not use the Bills of Quantities as a construction programme or for the purpose of ordering materials or a「 ranging SUBBCONTRACTS. The references for these activities shall be the DRAWINGS, SPECIFICATIONS and instructions issued by the ENGINEER.
 
14. Should the CONTRACTOR consider any further items to the items described in the Bills of Quantities are necessary to complete his pricing then he should identify these  items and include them in his offer.
 
15. Any error in description or in quantity o 「 in omission of items from the Bills of Quantities shall not vitiate this CONTRACT nor release the CONTRACTOR from the execution of the whole  or  any  part of the WORKS comprised therein according to the DRAWINGS and  SPECIFICATIONS  o 「from any of his obligations or liabilities unde 「 the CONTRACT. Any error in or omissions from the Bills of Quantities shall not be corrected by a VARIATION  issued by the ENGINEER
 
16. Lump Sum shall not be given where unit rates are applicable
 
17. Amendments shall not be  made to the Bills of Quantities without the ENGINEE  written permission
 
18. In add 仆 ion   to  common abbreviations, the following have been adopted:
 
 
POM (I):
 
 
 
 
STM: BS:
 
PRINCIPLES   OF   MEASUREMENT (INTERNATIONAL)    FOR    WORKS  OF
CONSTRUCTION dated June 1979 and published by the Royal Institution of Chartered Surveyors, London
 
American Society for Testing Materials. British Standa「d,
 
Dia: diameter
 
Hr hou「
 
mm: millimetre
 
m; meter
 
m2: square meter
 
m3: cubic meter
 
No./Nr.: Number
 
Kg: kilog「am
 
Sq: squa飛
 
Ref: reference
 
PC Sum: Prime Cost Sum
 
PS: Provisional Sum
 
LS: Lump Sum
 
19, Rates shall be comprehensive and include for, but not be limited to, the following:
 
(a) All obligations imposed by the CONTRACT.
 
(b) Complying in every respect with the requirements of the CONTRACT
 
(c) Labou 「 and all costs in connection.
 
(d) Materials and goods and all costs in connection, including samples
 
(e) Fittings and fixing materials and goods in position including hoisting to any height
 
(f) Use of scaffolding, plant, equipment and tools
 
(g) Any additional labours usually associated with measured items.
 
(h) Establishment and overhead charges and profit.
 
(i) Laps, waste and trade or any allowance.
 
20. The pricing of materials shall take account of the following:
 
a. PRICING PREAMBLES and SPECIFICATIONS shall apply reciprocally between sections of the WORKS unless otherwise described.
 
b. Materials shall be of the quality specified unless otherwise directed by the ENGINEER.
 
c. All materials shall be transported, handled, stored and fixed in accordance with the printed instructions or recommendations of their manufacturers or suppliers.
 
d. Protection of completed work, all casings and temporary coverings and  making  good, cleaning and polishing and clearing away upon completion
 
21. Where the word "allow" is used, the cost of such item shall be the responsibility of the CONTRACTOR.
 
22. The amounts set against any items of profit shall include for all costs in connection with letters of credit, bank charges, interest charges and insurance after the materials come under the control of the CONTRACTOR.
 
PilinA / Secant piles:
 
Unless detailed otherwise, rates for piling shall include the following:
 
1. Cost of carrying out structural calculations and obtaining approval from local authority and the Engineer ,
 
2. Mobilization of piling equipments.
 
3. Setting up plant at each pile position including any levelling or site preparation required.
 
4. Supply of all materials including concrete, steel reinfo「cement,etc
 
5. Provision of testing equipments and carrying out the specified tests.
 
6. Cutting back piles to the formation levels and bending steel into pile caps.
 
7. Dc-mobilization of piling equipments.
 
Excavation and earth Works
 
Unless detailed otherwise, rates for excavation and earth works shall include the following:
 
1 Increase 1n bulk.
 
2. Excavation in any material including「ock.
 
3. Upholding sides of excavation with timber or steel sheeting o「 any other means.
 
4. Keeping excavation free from water
 
5. Backfilling where required with approved material compacted  as specified and  approved by the Engineer, all to reach the specified finished levels. Any loss in volume due to compaction and for additional materials required due to penetration  of the filling materials into the ground or any settlement o「 compaction of the original ground levels unde 「 the weight of the materials or due to methods of compaction or construction  traffic shall be accounted for in the rates,
 
6. Disposal of surplus materials to areas designated by Municipality and as approved by the Engineer.
 
7. Forming temporary spoil heaps where required and multiple handling.
 
8. Levelling  and  compacting   the  bottoms  of  all  excavations  to  receive  concrete  or  othe「 construction.
 
PRICING PREAMBLES FOR WATER WORKS
 
1. General
 
The Scope of Work, Specifications, Schedules of Prices and Drawings do not necessarily cove 「 all items to achieve the 「 equirementsof the AGREEMENT. The AGREEMENT rates, however, shall be deemed to include all costs to execute the specified works and all related works, which an experienced CONTRACTOR shall reasonably foresee. Costs of items described or implied in the Specifications and not specifically mentioned in the Schedules of Prices shall be deemed to be included in the rates and prices of other items.
 
Descriptions offered by ADDC/ENGINEER  shall be for  guidance  only. The CONTRACTOR  shall be fully responsible for determining items and quantities as necessary for reaching the lump-sum prices required for performing all the CONTRACTOR's obligations under the AGREEMENT .
 
The CONTRACTOR shall be deemed to have included in his sums for all waste, bulking or compaction factors, dewatering, over pulling and all other like elements or operations required to complete the WORK(S), including all necessary measures to protect or preserve adjacent work or property during such operations, in accordance with the provisions of the AGREEMENT
 
Should any new areas of work transpire which ADDC/ENGINEER consider not envisaged as being part of this AGREEMENT, quantities shall be measured by ADDC/ ENGINEER.
 
The CONTRACTOR shall be given the opportunity, in such cases, to be present during the measurement. Prices for the new work, if any, shall be mutually agreed between ADDC/ENGINEERand  the CONTRACTOR.
 
No request shall be considered for an increase in the unit rates on the grounds that they shall be inadequate to carry out additional wo「k of a similar nature.
 
The CONTRACTOR shall be required to complete, in full, his pricing inclusions in the columns provided as listed in the Schedule of Prices. Items not priced by the CONTRACTOR shall be deemed to be included elsewhere.
 
Prices shall be quoted for each item, even when the quantity of that item is zero. This will enable variation order for unforeseen changes to route o 「 for unexpected obstacles to be priced. TENDERERS are cautioned in respect of the prices quoted for unit rates, as these will be taken into account during the evaluation of the submitted offer and excessive values will not be tolerates
 
The CONTRACTOR shall be deemed to have included for all the necessary information, details, clarifications or drawings and documents of the CONTRACT.
 
The CONTRACTOR shall be 「 equired to take all measures necessary to ensure that the whole of the WORK(S) shall be executed in such a manner so as to minimize the generation of dust and other hazards.
 
The CONTRACTOR  shall execute the WORK(S) in accordance with the specifications, drawings,
 
ADDC/ENGINEER shall have the right to remove any item from the Scope of Work due to operational o「 safety 「 equirements and the appropriate value shall be deducted from the Contract Price without any claim from the CONTRACTOR.
 
No cutting away or welding of any parts of the WORK(S) shall be pe「mitted unless with the written consent of ADDC/ENGINEER.
 
The supply of electricity and water for construction purpose shall be the CONTRACTOR's responsibility.
 
The  TENDERER's  attention  is  directed  to  the  Price  Breakdown  Summary  Sheet,  Schedule of Prices, Progress Schedule, Schedule of Cash Flow, General Conditions, Special Conditions and Requirements,  Technical Specifications and Tender Drawings,  and all these documents are  to be
「 ead in conjunction with the Schedule of Prices (Bills of Quantities) and the relevant notes on the Schedule of Prices (Bills of Quantities). Insofar as these notes on the Schedule of P 「 ices (Bills of Quantities) and Tender Drawings may affect the  execution and pricing  of the WORKS,  they shall be deemed to form part of the Conditions of CONTRACT.
 
General directions and desc 「 iptions of the WORKS and material are not necessarily repeated in the Schedule of Prices (Bills of Quantities) and reference is to be made to the relevant articles of the various sections of the Tender Document for each item of the Schedule of Prices (Bills of Quantities).
 
The TENDERER shall include but not by way of limitation all labou「, materials, tools, equipmen,t plants and appurtenances to perform all the WORKS as required for all water pipeline  work specified in these documents.
 
2. Prices
 
The TENDERER shall quote firm unit prices and based on these firm unit prices and on the estimated quantities, the TENDERER shall quote the total price for all materials C&F Abu Dhabi up to designated site stores and/or the ADDC's stores or other designated location. The C&F unit prices and total prices for all materials shall include, but not be limited to the following:
 
1. Design, manufacture, factory inspection and testing by an independent laboratory, supply, export packing and marking and all transport costs incurred until placing all materials on board the vessel, airplane or truck.
 
2. Freight from port of shipment to port of destination in the U.A.E.
 
3. Patent rights, trade marks, name or other protected rights, royalties etc.
 
4. Responsibility for any loss and/or damage until the material has been installed at the site or placed at the ADDC's storeyards.
 
5. Provision of clear on-board bills of lading.
 
6.
 
7. Dock  dues  and  port  charges,  including  import  duties  at  port  of  destination,  permits, contributions, clearance of goods through customs, off-loading and all incidental expenses
 
8. Transportation to designated stores, unloading at store and storage at stores
 
9. Checking and verifying all shipmentsreceived against shipping documents and issuing receipt and damage report.
 
10. Certificate of origin, or any other documents issued in the country of shipmen,t or those required under Laws of Abu Dhabi and the United Arab Emirates.
 
11. All expenses of the CONTRACTOR'S personnel in connection with the discussion and/or co­ ordination meetings in the ADDC's offices and/or in the ENGINEER's offices in Abu Dhabi throughout the CONTRACT Period.
 
12. The cost of marine insurance from warehouse to warehouse
 
The cost of the Third Party Inspection Authority (TPIA) shall be paid by the ADDC.
 
The TENDERER shall quote firm unit prices for all further services in connection with local transpor,t insurance, facilities  for  the ADDC/ENGINEER  and for all expenses in connection  with erection , construction or exhumation, testing, commissioning or abandonment on the basis of estimated quantities. These unit prices shall be referred to as Local Expenses.
 
The price of the Local Expenses shall include but not be limited to the following:
 
a) Loading at store, transportation from store to the site, unloading at site, handling from site storage to the point of final installation.
 
b) Complete insurance comprising marine transport insurance from warehouse to warehouse, insurance of plant, workman's compensation insurance, third party, public liability and property damage insurance, CONTRACTOR's all risks insurances etc. in accordance with Tender requirement s.
 
c) Construction, erection, installation, exhumation, testing and commissioning or abandonmetn of works and all other expenses arising until Final Acceptance of the WORKS.
 
d) All costs associated with labour and living expenses.
 
e) Cost of local transportation of any indigenous equipment and/or materials
 
f) Costs of providing transport for the supervisory staff on site to carry them from the site office to the site of the WORKS and between the site offices of the Project.
 
g) Costs incurred in providing the services of an engineer, to be made available on site at ADDC's short notice during maintenance period.
 
h) The cost of providing manuals, progress photographs in colour and/or black & white etc. as per specification or as directed by ADDC/ENGINEER.
 
i) Cost of pipeline route survey and any other survey work 「 equ 「i ed fo 「 the execution of the WORKS as per the specification.
 
j) Cost of preparation and submission of pipeline profile drawings, layout drawings, detailed drawings and any other drawings deemed necessary for the construction of the WORKS.
 
k) All  prices  and  rates  shall  include  for  preparation  of  proposals,  drawings,  engineering, calculations, documentation, etc. as shall be「equ「i ed for approval procedure.
 
I}   Any other cost or expense contingently necessary for the proper completion of the WORKS
 
The TENDERER shall quote his prices by filling in the blanks in the Schedule of Prices (Bills of Quantities) of this Section.
 
All prices quoted by the TENDERER shall not be affected by the increase in price level in any country. The lumpsum prices of those items for which a lumpsum has to be quoted and the unit prices (rates) to be entered in the Schedule of Prices (Bills of Quantities) shall be firm prices.
 
3. Scaffolding, Trestles, Ladders, Etc.
 
The CONTRACTOR shall provide at his own cost, means of access to work using scaffolding, trestles, ladders, brackets or whatever equipment the circumstances dictate with "safe" wo「king as the major consideration. Where such access shall be erected or provided for the CONTRACTOR's activities, the CONTRACTOR shall permit reasonable utilisation and use of such facilities by others executing concurrent activities provided that such permission and use shall not cause delay or unreasonable hindrance o「 interruptionof the CONTRACTOR's own operations.
 
The CONTRACTOR's scaffolding and means of access shall be erected for a period prior to commencement of the work if required by ADDC/ENGINEER and shall remain until ADDC/ENGINEER inspection process shall be satisfactorily completed. The period in either case shall not exceed one week.
 
4. Lifting Tackles, Wire Ropes, Etc.
 
All lifting tackles, wire ropes, blocks, shackles etc. including any special equipment for executing the WORK(S) shall comply with the requirements of the appropriate British Standard Specification or equivalent and carry a valid test certificate. Under no circumstances shall chain slings be used.
 
Where there shall be a possibility of damage to material equipment, or its deformation due to slinging from more than one point, ample strutting shall be p「 ovided so as to ensure that perfectly vertical lift shall be obtained.
 
5. Climatic Conditions
 
The CONTRACTOR shall be deemed to have allowed for all effects on the execution and progress Of WO「k s occasioned by climate and prevalent conditions and with specific reference to periods of high humidity and the incidence of wind/air borne dust occurring naturally.
 
Page 4 of 28
 
6. Removal of Debris
 
Accumulated debris or unusable materials shall be removed by the CONTRACTOR to a suitable location off site designated  by Municipality.  The cost of  cleaning  up and removal  shall be deemed to be included in the CONTRACTOR's rates.
 
7. Land Cutting and Filling
 
Where 仆 is necessary the part or all of the project area shall be levelled by means of balancedcut and  fill  with  use  of  the  original  materials  and  the  Contracto「  shall  adhere  to  the  following procedure:
 
a) The Contractor shall survey the original topography of the designated area and provide cross-sections at 25 m intervals and as directed at site by ADDC/ ENGINEER.
 
b) The said area shall be refe「red to a suitable fixed local temporarybenchmark and the cross­ sections shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the future preparation of cross-section profiles after completion of the land cut/f曲 ng operation
 
c) On completion of land cut/filling a 「 esurvey of the designated area shall be made along the same cross-section grid to establish the finished profile and levels of the site as pe 「 the Contract Drawings.
 
d) All elevations shall be referred to the contract datum.
 
The rates and prices for the CONTRACT shall include all costs related to leveling of the pipeline route area by means of the balanced cut and fill that shall be carried out prio 「 to commencement  of excavation fo 「 layingthe pipes.
 
It shall therefore be the TENDERER(S)  sole responsibility to ensu「e that all the necessary information in this respect are duly gathered by him on site prior to establishing his rates and prices for the CONTRACT.
 
8. Embankments
 
In low lying areas where the balanced cuVfilling of the land can not be applied, it is necessary that the pipeline be laid in embankments/bund constructed  from approved imported  fill mate「ials, the CONTRACTOR shall adhere to the following procedure:
 
a) The   Contractor   shall   survey  the   original   topographical   contou「  along   the  proposed centreline of the pipeline and p 「 ovide cross sections at 10 m intervals, or as directed at site by ADDC/ENGINEER.
 
b) The said contour shall be 「 eferredto the corresponding elevation of the edge of the road or other notified refe 「 ence level and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate  the future preparation  of cross section profiles  at 1O metres intervals
afte「 constructionof the embankments.
 
All elevation shall be referred to New Abu Dhabi Datum or as instructed by ADDC/ENGINEER
 
It shall therefore be the CONTRACTOR's sole responsibility to ensure that all the necessary information is duly recorded and certified by ADDC/ENGINEER, prior to the commencement of any work which, for purpose of any payment,  may require compliance  with  the  above mentioned
procedu 飛
 
If the existing surface level is found to 「 equire filling under the pipe in order to give a minimum cover of 1000 mm on top of the pipe, such filling shall be executed to the requiredbottom level of the pipe.
 
The supply, placing and compaction of imported fill material shall be measured per cum as placed into position after compaction.
 
9. Surveying
 
Surveying work shall be carried out in accordance with the relevant specifica tion, clauses and drawings. The cost for such work shall be deemed to be included in the rate of  the  respective  items. Surveying  work shall include, but not be limited to, the following:
 
a) All labour, equipment and materials necessary for the survey and pegging out of  the pipelines and other structures and installations.
 
b) The surveying of the most suitable route bearing in mind the construction and site operating requirements, including trial hand excavation to locate existing unde「ground services etc
 
c) Any deviations or changes from the route or locations shown on the Tender Drawings whether  necessitated by local conditions  or by ADDC's/ENGINEER's requirements
 
d) The pegging out with approved conspicuous pegs at such intervals that when standing  at any peg, both the preceding and following pegs are in view, including maintenance and protection of the pegs.
 
e) The installation or marking and maintenance of a reference benchmark(s) on site, referenced to established site datum, as instructed by ADDC/ENGINEER.
 
f) The preparation of survey route cross section and profile drawings giving all necessary elevations, dimensions and data,「elatedback to the reference benchmark.
 
g) The provision of all necessary assistance, equipment transport etc to ADDC/ENGINEER as specified elsewhere.
 
10. Precast Concrete Items
 
Cost for all required precast concrete items and related works shall be deemed to be included in the rates of the respective items. Cost fo 「 precastitems such as, ARV and valve spindle protection chambers, marker posts, pipe sleepers, pipeline protection slabs, paving elements, kerbstones etc, and shall also include fo 「 the provision of samples if required of each precast item for quality review and approval, and for storage, handling transport, installation in position etc
 
The rates fo「 the chambe「 and valve spindle protection chambe「 shall be per unit and shall include for the supply and installation of all ancillary items as for reinforced concrete chambers.
 
Cost for marker posts shall include for stainless steel plates, painting, markings etc as detailed on the Tender Drawing.
 
The provisions of this clause shall apply equally to proprietary plastic protection or marker boards if approved as an alternative to precast concrete slabs.
 
Cost for paving elements such as concrete slabs, interlocking blocks or pavers etc, shall be inclusive of all retaining kerbs, haunching, bedding, jointing etc.
 
11. Discount
 
If a discount is offered by the CONTRACTOR it shall apply to all Schedules of Prices through establishing the discount percentage in respect of the relevant Agreement price and then applying this percentage to each of the items in the Schedule of Prices. Whenever a general discount is offered affecting the prices, the percentage of such a discount with respect to the total value of the schedule of prices shall be applied to all the items pro rata. Re-adjustment of the prices in any other  manner will not be acceptable.
 
12. Quantities And Rates
 
All the quant 仆 ie s stated in the Schedule of Prices (Bills of Quantities) shall be treated as approximate only and are given to provide a common basis for tendering. The basis of payment shall be the actual quantities of supplied and installed material and works carried out, as measured and accepted by the ENGINEER or his representative and valued at the rates or prices quoted in the Schedule of Prices (Bills of Quantities).
 
The CONTRACTOR shall prepare detailed construction shop drawings based on the CONTRACT Plans  and as directed by the ENGINEER.  The CONTRACTOR  shall  carry  out extensive   field
 
Pag e 7 of 28 TEBOOtN M.E. Ltd.
 
investigation and consider all existing conditions and obstructions for the preparation of shop drawings. Shop d 「 awings should in addition incorporate all required revisions to the CONTRACT Drawings including, but not limited to additions, deletions or route changes of the proposed lines  as directed by the ENGINEER.
 
The CONTRACTOR shall assess the preliminary quantity of materials to complete the WORKS based on the CONTRACT Drawings or shop drawings as considered appropriate by the CONTRACTOR to ensure procurementof materials as early as possible and as demanded by the CONTRACTOR's   construction   time   scheduling.   The   CONTRACTOR's   proposed   materials procurement list identifying the items and quantities should be submitted to the ENGINEER fo 「assessing the availability of 「f ee-issuematerials from the ADDC's con 「t acts and/or ADDC Stores, prior to ordering the materials.
 
The ADDC may supply certain materials as free issue from other contracts and/or from the ADDC stores, if such items are available as surplus. Prior to ordering the materials, the CONTRACTOR shall explore the availability of these free issue materials with the ENGINEER. If it is established that part of the materials are available for free issue, then the ENGINEER will issue the appropriate instructions to the CONTRACTOR for the CONTRACTOR to make a「「angementsto collect the materials and incorporate them into the WORKS. Such material will be in lieu of the materials to be supplied unde 「 BOO No. 1 and shall be transported/constructed/installed in accordance with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) fo「Construction and Installation.
 
After completion of the above steps, the CONTRACTOR should assess the quantities of the remaining materials required to complete the WORKS and, as soon as material data sheets are approved, should proceed with ordering the 「 emaining materials after accounting the free issue items and quantities. To lessen the possibility of procuring surplus materials, which may not be actually required for the WORKS, the CONTRACTOR should finalise and get approval for the shop drawings in a timely manner, prefe「ablyprior to ordering his materials
 
Payment for the CONTRACTOR supplied materials will be made only for the measured installed quantity. If there has been a 汜 vision to design ordered by the ADDC after approval of the shop drawings and after ordering the materials, consideration will be made on paying for the resulting surplus materials based on the ADDC's and/or ADDC's acceptance of a properly documented claim.
 
The responsibility for assessment of Materials Quantity is  with  the  CONTRACTOR CONTRACTOR does not have to wait for either processing his shop drawings or quantity authorisation by the ADDC and/or ENGINEER, for ordering materials once the  material  data sheets are approved. Any material that becomes surplus, due to over estimation by the CONTRACTOR will not be paid for and such materials will be the property of the CONTRACTOR
 
It shall be the CONTRACTOR's sole responsibility to orde 「 a certain amount of material necessary for the uninterrupted completion of the WORKS to compensate for material losses due to cutting of pipes , wastage, at no extra cost to the ADDC
 
The TENDERER shall include extra costs, if any, associated with part ordering of materials.
 
TEliODIN M.E. Ltd.
 
A separate price or rate shall be entered for each item of the Schedule of Prices  (Bills of Quantities) in figures. Items against which no price or rate is entered will be deemed to be covered by rates or prices of other items of the Schedule of Prices (Bills of Quantities). No new items shall be added to the Schedule of Prices (Bills of Quantities) nor shall any alternatives be made thereto.
 
In case of discrepancy between the quoted unit rate or price and the total amount for any item of Schedule of Prices (Bills of Quantities), the unit rate or price shall be binding
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of all costs incurred in any manner whatsoever in complying with the provisions of the Tender Documents , whether or not such items are specifically described in the Schedule of Prices (Bills of Quantities), including all labou「 cost, testing of materials by independent  laboratories, temporary works, erection, testing and commissioning, maintenance, insurance, taxes, duties,  every incidental and contingent cost and charges whatsoever.
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of the cost of all ancillary work and materials not separately mentioned in the Schedule of Prices (Bills of Quantities), but which may  reasonably  be implied to be necessary by the Specification,  Schedule of Prices (Bills of Quantities) or Drawings, or reasonably be inferred to be necessary there f「om, or which are usual or essential to the completion of the WORKS.
 
The prices and rates inserted in the Schedule of Prices (Bills of Quantities) shall be the full inclusive value of the work described under the several items, including all costs and expenses which may be 「 equired in and for the construction and installation of all the work described completely , together with all general risks, liabilities and obligations set forth or implied in the Tender Documents.
 
The rates quoted in the Schedule of Prices (Bills of Quantities) shall include for all costs and shall be deemed to be complete in all respects conforming to the Tender Documents and normal acceptable construction practices fo「 all the WORKS until the date of Final Acceptance Certificate.
 
The work shall be measured net as executed and erected on site unless otherwise specified.
 
All materials brought onto the site by the CONTRACTOR in accordance with the approved shop drawings are the ADDC's property and shall be in CONTRACTOR's custody fo 「 erection and installation.
 
The  ADDC  may provide certain materials  from ADDC's  stores and/or from ongoing  projects for
inco「poration in the WORKS. Such material will be in addition to or in lieu of the materials to be supplied unde「 BOQ No. 1 and shall be transported/constructe/dinstalled in accordance  with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) for Construction and Installation.
 
All materials ordered by the CONTRACTOR before the free issue of certain materials by the ADDC and become surplus due to the free issue, shall be assessed by the CONTRACTOR prior to their shipment to the U.A.E. and returned/deliveredby the CONTRACTOR directly to the ADDC's stores and/or other designated stores at no add仆ion al cost to the ADDC.
 
TEBOO,N  M.E.. Ltd.
 
All unused free issued and/o 「 approved surplus materials shall  be  cleaned/repaired at no extra cost to the ADDC, delive 「 ed and offloaded undamaged by the CONTRACTOR as and  when required by the ADDC to the ADDC's stores within 90 KM or any other place if required. The transportation cost of justified approved surplus materials will be paid in accordance with the relevant item in BOQ No. 3.
 
Should there be any discrepancy between unused free issued quantity, the approved surplus quantity and the quantity of undamaged materials delivered and taken over by the ADDC's Stores and/or other designated stores, then the difference shall be evaluated using the respective  rates and prices in the Schedules of Prices and the amount deducted from the CONTRACT PRICE.
 
13. Working Hours
 
ADDC's working hours at SITE are set out in the TENDER Documents. The CONTRACTOR  shall be allowed to work outside the site working hours and days at the disc 「 etion of ADDC/ENGINEER subject  to security  and  othe 「 rules  at  each  location.  All  extra  costs  incurred  through working
ove 巾 me shall be included in the CONTRACTOR's price. Such costs  shall include, but not limited to travel, overtime, supervision, food and all incidental expenses.
 
14. Safety Provisions
 
Unit Rates and Prices shall include for all site protection as per ADDC Safety Rules  and Regulations, T「 affic Police, Municipality, Oil Companies or other relevant Authorities, including but not limited to provision of metal screens and safety barriers and all measures necessary to protect adjacent structures, properties from the effects  of over spray, paint spatter or drainage  by impact of o「 introductioninto machinery of sand blasting material. All such measures shall be provided  to the satisfaction of ADDC/ENGINEER
 
15. Excavation and Backfilling
 
Unless specified otherwise, the rates given in the Schedule of Prices (Bills of Quantities) fo 「excavation and backfilling of trenches, foundations, etc., shall include, but not be limited to:
 
1. All labour, equipment and materials necessary
 
2. Clearing and grubbing of the site and the pipeline route and「emoval of any obstruction.
 
3. Hand or machine digging and excavation in all type of ground, not specifically mentioned under separate BOQ items, and stacking the spoil adjacent to the excavations in an approved manner. No distinction shall be made between soft, hard or rocky ground even if any of the foundation areas or pipeline routes are changed from those shown on the CONTRACT Drawings to any othe「 route w咖 n the working area of this p「oject.
 
4. Construct   and  maintain  all  ramps,   temporary  access,  safety  barriers,   signs,   lights and
diversion「oads as required by the Traffic Police, Municipality, Oil Companies or other relevant Authorities.
 
 
Page 10 of 28
 
5. Dewatering of excavations and disposal of wate「 by any means  in an approved  manner as directed by the ADDC/ENGINEER and as per the requirements of the concerned Authority.
 
6. Double or multi-handling where necessary in connection with the removal and disposal of surplus o「 unsuitableexcavated materials to a location approved by the ADDC/ENGINEER.
 
7. Working around or under and protecting any ad丿ac ent structures, pipes, cables, ducts or other existing services and structures.
 
8. Any exploratory holes, trenches, etc. that may be required to locate services o「 to test soil characteristic.s
 
9. Supply and placing of pipeline bedding materia,l levelling and compacting the bottom of excavation,s trimming and shoring sides of excavation slopes and placing  backflil in compacted layers over and around the pipeline.
 
10. Completing the backfilling in compacted layers including the provision for importing  an approved backfill material as necessary and restoring the area as directed by the ENGINEER
 
11. Provision of fencing, lighting, watching, temporary reinstatement and maintenance of surfaces other than asphalt roads, parking areas, footpaths, e tc., and every other expense in strict conformity with the Specification.
 
12. Any additional excavation for buried valves, f「i e hydrants, fittings, etc.
 
13. Should the CONTRACTOR over excavate any part of the WORKS either depth wise o「 width wise, such over excavation shall be made good with approved backfill material at CONTRACTOR's  expense.
 
14. Excavation and trenches in the existing and/or proposed roads shall be backfilled to the grade level with thoroughly compacted material approved by the ENGINEER
 
15. Removing all su 「 plus excavated material and levelling and landscaping as directed by ENGINEER
 
16. Reinstatement of road surfaces,  green areas o「 any other buildings,  structures,  pipes, cables or any other services which has been removed or damaged in order to perform the WORKS
 
17. Obtaining necessary permit to work from Oil Companies, Defence/security areas, Traffic Police, Municipality or other Authorities that my be required to perform the wo「ks.
 
18. Provision of shoring and shutting to safeguard against side collapse of excavations and trenches.
 
19. All costs with respect to disturbance of green areas not covered by the 「 egulations of the Agriculture Department.
 
Measurement for excavation, dewate「ing and backfill shall be per metre run (MR) of trenchgiving a minimum cover to the pipe of  as specified in the tende 「 docur:i罕 and is ir「espective of the
 
 
Page 11 of 28
 
TEBO,一DfN M.E. Ltd.
 
trench width for all operations till completion of the CONTRACT. Where add 仆 ion al excavation is necessary, it shall be measured for every additional 500mm depth specified, but shall only be considered valid when the continuous length of trench requiring additional excavation exceeds  thirty (30) metres at any individual location and more than one location along the excavation route shall not be measured cumulatively. Additional excavationless than 500mm shall be deemed to be included in the unit rate for excavation, dewatering and backfilling
 
Extra excavation, dewatering & backfilling required for construction of chambers, pits and thrust block s shall be included in the rates for construction, erection etc. of respectvi e items in BOO No. 2.
 
Excavation, dewatering and backf 曲 ng for any other excavation work as directed by the ENGINEER shall be per cubic metre (Cum) and as specified in the Schedule of Prices (Bills of Quantities)
 
The supply and placing of ex 「t a fill materials shall be measured per cubic metre (Cum) as placed into location afte 「 compactionand include transportof original material to a site approved by the ENGINEER.
 
In low lying areas where it is necessary that the pipeline be laid in embankmenst constructed from
approved  imported   fill   material,   the   rates  fo「  suppyl   of   fill   material   and  construction  of
embankments shall be per cubic metre (Cum). The CONTRACTOR shall adhere to the following procedure:
 
a) The CONTRACTOR shall survey the original topographical contour along the proposed centre line of the pipeline and provide cross sections at 25m intervals.
 
b) The said contour shall be related to the corresponding elevation of the edge of the road and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the  future preparation of cross section profiles at 25m intervals after construction of the embankments
 
c) On completion of the construction of the embankments a survey shall be made to determine the final contours, which shall then be plotted against the original contours to establish profiles at 25m intervals thus determiningthe final volume.
 
Irrespective of the method of measurement adopted by the CONTRACTOR, when preparing his invoices for fill material, the final quantities shall be defined from the results of the application of paragraphs a), b) and c) above.
 
It shall therefore be the CONTRACTOR's sole responsib 仆 ity to ensure that all the necessa ry informationis duly 「 ecorded and certified by the ENGINEER, prior to the commencement of any work,  which, for purposes of  any payment, shall require compliance  with  the above-mentioned procedure.
 
If the existing surface level is found to require filling under the pipe in order to give a minimum cover, as specified in the tender documen,t on top of the pipe , such filling shall be executed to the required bottom level of the pipe
 
 
Horizontally this filling shall be extended up to the nearest「oad ke「bstone, whenever this is 5m o「less from the pipeline. Unit rates for this operation shall include for the supply of suitable fill material.
 
Imported fill material required for embankments shall be measured from the existing surface level or from the bottom of pipe, whichever is the higher, up to the final road level, all as calculated from the results of the route survey mentioned above.
 
16. Concrete Works
 
The rates and prices for all concrete wo「ks shall include but not be limited to:
 
1. Any calculations, detailing and construction drawings, which in the opinion of the ENGINEER are necessary for the proper execution of the WORKS.
 
2. The supply of concrete, reinfo 「 cement, all-necessary labour, equipment and materials required fo「 the preparation, placing and protection of the concrete works.
 
3. The required excavation, backfilling, blinding, formwork, placing of concrete, compaction and vibrating and any additional formwork for the construction of joints, stop ends, building in fittings, pipes, conduits, bolts and the like, which although not specifically mentioned in the Tender Documents or shown on the drawings, are reasonably to be inferred from the specifications or  drawings  and  the ADDC's/ENGINEER'isnstruction.s
 
4. The supply and fixing of formwork and steel reinforcement in accordance with the drawings and specifications, includingall cutting, bending, fixing and provision of all necessary spac 「e bars, saddles, binding wire etc
 
5. Sampling and testing the characteristics of the concrete and concrete materials as per the specfiication.
 
6. The supply/application of protective coatings and waterproofing to cone「ete below ground or exposed to atmosphere as pe「 thespecification or shown on the drawings.
 
7. Supply and fixing of water stop at joints as per the specification or shown on the drawings.
 
In situ concrete shall be measured as the net volume shown on the drawings or variations to the drawings as directed by the ADDC/ENGINEERor his representative,sbut no deductions shall be made for  small chamfe「s,  steel work, reinfo「cement, bolt holes「equiredto be built in,  nor shall extra value be measured for splays or fillets.
 
 
 
17. Supply of Materials
 
Unless specified otherwise, the rates for the supply of all materials shall include all costs in respect of manufacturer's testing, testing by independent laboratory, C&F charges, clearance, all handling and transportation, storage, and any other costs incu「red under the obligations of the CONTRACT
 
The rates for the supply of pipes, valves, fittings etc. shall include for all lubricant, bolts, nuts, washers, gaskets, wheels, extension spindles , extension pieces, warning tapes, polyethylene sleeves, etc. and protective coatings as specified in the Tender Documents.
 
18. Storage, Warehousing, Etc.
 
The CONTRACTOR shall include for all temporary warehousing required by the CONTRACTOR to store his materials etc., in accordance with the CONTRACT, including Vendor's  storage instructions . The CONTRACTOR shall include for the protection and storage of sensitive material including pressurized and/or air-conditioned storage. The protection of all works and material shall be by the CONTRACTOR whether to installed or non-installeditems.
 
19. Pipe Construction
 
Unless otherwise specified or covered by separate BOQ items, the rates for pipe construction shall include, but not be limited to:
 
1. Supply of all labour, tools, equipment, plant and installation
 
2. The installation of polyethylene sleeve and placing of warning tape over the pipeline as per specification.
 
3. Costs for cleaning, jointing and cutting, trimming and otherv-Jise preparing the ends of pipes, hydrostatic pressure testing, flushing, disinfecting, sampling, commissioning and handing over of the completed WORKS.
 
4. All cost「elatedto collection and transportation of the water samples from site to the testing Laboratory and collection of Test results and submission to ADDC/ENGINEER's office
 
5. The water required for testing, flushing and disinfection shall be a「rangedby the Contractor at his  own  expenses.  Contractor  shall  be  responsible   to  arrange  all  ancillaries,  logistics, connections etc. for transmission of water from network point and tankers (certified for potable water) for transmission of water from supply station, if required.
 
The measurement for pipe construction shall be per metre length (MR) of pipeline including all valves and fittings, measured along the axis of the line before backfilling
 
 
20. Valves and Flowmeters
 
The supplies of gate valves and butterfly valves shall be measured per unit of each type and size. The prices for the supply of material shall be inclusive of, but not be limited to the following
 
1. A stem coupling of standard dimensions.
 
2. An extension spindle with standardised cap extending to approximately 150mm below the surface box cover.
 
3. Supply of hand wheel for butterfly valvesfor operation from inside the chamber.
 
4. Supply of bolts, nuts and washers or other approved bolt systems and rubber gaskets.
 
The TENDERER shall also include in his rates for the supply of 1 (one) number "tee" handled operating keys for every 10 (ten) valves supplied with a minimum of one.
 
The installation of valves, flow meter, flow control valves, etc. shall be measured extra over the appropriate item for installation of straight pipe for each type and size and shall include for installation of all accessories.
 
21. fittings
 
The supply of fittings shall be measured per unit of each type and size. Flanged items shall include all necessary bolts, nuts, washers and gaskets .
Should certain items described not be  available, the CONTRACTOR  shall propose  alternatives. The unit rates listed in the Schedule of Prices (Bills of Quantities) for both supply and installation shall in these cases are deemed to cover all components of any such  proposed alternative. The alternative  proposals are subject to the ADDC's/ENGINEER'sapproval.
 
The installation of fittings shall be measured extra over the appropriate item for installation of straight pipe fo 「 eachtype and size fully installed and readyfor operation.
 
22. Covers and Surface Boxes
 
The supply of D. I. or Aluminium covers and surface boxes shall be measuredpe「 unit of each type and size complete with frame.
 
The rate shall include for lettering on covers and surface boxes, coating, supply of lifting keys, etc all as pe「 specificationand as shown on the drawings.
 
The cost of installation of covers, frames and surface boxes shall be included in the cost of the construction of the「elevantconcrete s「t ucture.
 
 
23. Crossing of Oil/Gas Pipelines
 
The crossing of oil/gas pipelines shall be per crossing of oil/gas pipeline measured ex 「t a over the appropriate item fo「 the installation of straight wate「 pipelinefor each size
 
The rates for the crossing of existing oil/gas pipelines shall included but not limited to taking all precautions   and   safety  measu「es  and   compliance   with  the  owner   of   the  oil/gas  pipeline requirements and as per the specification.
 
24. Non Disruptive Road Crossing (NDRC)
 
NDRC shall be paid by meter run (MR) of pipeline to be constructed by NDRC fo 「 each diameter as described in the BOO. The length of the pipeline shall be measured along the centre line of the casing pipe.
 
A maximum time period of 35 working days will be allowed for NDRC pits (with specific fencing) to remain open. The ADDC reserve the right to deduct an amount pro rata and in accordance  with the Schedule of Prices for each NDRC pit that remain open beyond the maximum 35 working days specified. This 35 days period includes for everything necessary to complete the whole work at each NDRC pit including site restoration.
 
The unit rates for NDRC works shall include for all soil investigation necessary prior/during the NDRC work, field testing, laboratory testing, submission of design and method statement for the NDRC work, obtaining No Objection form the concerned Authorities, obtaining existing utility information, p 「 eparation and submission of detailed construction drawings, surface movement points, fencing of working area and pit locations, construction of thrusUreception pits, installation of
D. I. restrained water pipeline including restraining set (as supplied unde 「 BOONo. 1), provision of bentonite slurry, supply and installation of approved casing pipe, provision of grouting for casing pipe, grouting of annular space between the water pipeline and casing pipe,  excavation, dewatering, backfilling, pressure testing and disinfection of completed pipeline sections  and surface reinstatement  all as per the specification.
 
25. Concrete Chambers and Boxes
 
25.1 Chambers for Valves
 
The unit rates for construction of reinforced concrete watertight chambers shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved materials in compacted  laye「s,  removal  from  the  site  of  excess  materia,l  preparation  of  foundation,  all measures to protect the existing waterlines du 「 ing construction, supply of all materials complete with precast concrete cove「 slab,factory applied fully epoxy coated lifting hooks, supports for valve spindle  extension  (if  required), bituminous painting,  waterproof membrane,  asphalt  hardboard, sealing compound etc.; casting in of anchor flange and sealing flange (waterstops) as supplied in BOO No. 1, casting in of access covers, frames and surface box as supplied in BOO No. 1, bolting of aluminium ladder as supplied in BOQ No. 1, all as shown on Tender Drawing but excluding D.I pipes, fittings, sleeves, valves, water meters, and strainers.  Details  of lifting hooks, ladder, vent pipe, waterstops & valve chamber protection are shown on the Tender Drawings. All concrete works shall be according to specification
FOR TENDER ONLY
 
 
25.2 Marker Posts for Chambers
 
The unit rate for marker posts shall include but not be limited to the supply of all materials, 100mm (4") dia. hot dipped galvanised steel pipe (950mmlong, wall thickness minimum 6mm) complete with painting, concrete foundation, filling of pipe with concrete, excavation, backfilling  etc. all as shown on Tender Drawing.
 
26. Concrete Slabs For Pipeline Protection
 
The unit rates for construction and installation of precast reinforced concrete slabs for protection of waterlines shall also include but not be limited to the supply of all materials, excavation to the required level, excavation to determine  the location of the waterline, dewatering, transport to the site, placing of slabs, installation of warning tape, backfilling with approved  fill  material  in compacted layers to the required grade, all as per specification and shown on Tender Drawing.
 
27. Concrete Ducts for Waterlines
 
27.1 Circular Ducts
 
The unit rate for construction of reinforced concrete encased 450mm, 600mm, 800mm, 1000mm, 1200mm & 1500mm diameter G.R.P. ducts shall include but not be limited to submission of structural design calculations fo 「 ADDC/ENGINEER approval, p「 ovision of construction drawings, supply   of  all  materials   inclusive   bituminous   coating,  excava tion,  dewatering,   backfilling   in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
27.2 Box  Ducts and Box Culverts
 
The unit rate for construction of reinforced concrete box ducts and box culverts shall include but not be limited to submission of structural design calculations for ADDC/ENGINEER approval, provision of constructiondrawings, supply of all materials inclusive bituminous coating, waterproof membrane, asphalt hardboard, waterstops at expansion joints, sealing compound, construction of access shafts, installation of auxiliary items (covers & frames, ladders, etc.), excavation, dewatering, backfilling in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts/culverts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
28. Concrete Slab for Protection of Surface Box
 
The unit rate for construction of reinforced concrete valve spindle protection slab, shall include but not be limited to the supply of all materials, installation of surface bo x as supplied in BOQ No. 1, supply and installation of valve spindle protection tube with dust cap, excavation and backfilling all as shown  on Tender Drawing
 
 
29. Instrumentation Devices for Sector Measuring Point
 
Unit price for the instrumentation devices required at each bulk consumer and sector-measu 「 ing point  shall  be  ente「ed in  the  Schedule  of  Prices  (Bills  of Quantities)  under  separate  items  for supply and installation. The unit rate per set shall include but not be limited to the items as in BOQ No. 1 and mentioned in the specifications for bulk consumer measuring point and for sector measuring point.
 
30. Unit Rates for Manpower Equipment and Material
 
Unit rates in the Day Works Bill shall only be applied in connection with any work, as may be
requ「i ed by ADDC/ENGINEER outside the contractual agreed price.
 
Unit rates in the Day Works Bill for manpower and equipment shall be completed by the TENDERER(S) and submitted together with and as part of his TENDER. The TENDERER($) shall extend these rates and enter total amounts based on the estimated quantities.
 
Labour rates shall include all wages, bonuses, allowances, supervision, overhead cost, social premiums, profits, insurance, travel and accommodation etc. The labour rates shall also include for all hand tools and appliances.
 
Unit rates for equipment shall include the operator, fuels, lubricants, auxiliary equipmen,t service and repairs, insurance, transport, etc. The CONTRACTOR shall fill in the size and type of equipment which are not listed under this CONTRACT and which he might be 「 equ 「i ed to use in the execution of the works.
 
Reimbursement for labour and equipment usage under these rates shall only be made if the work involved is authorised or instructed by ADDC/ENGINEER against signed labour and equipment return s. It shall be the sole responsibility of the CONTRACTOR to ensure that all the necessary information is duly recorded and certified by ADDC/ ENGINEER during the progress  of  the relevant work.
 
Price s for materials supplied on unit rate basis shall include for all loading, transporting, unloading, storage, overhead and profits and all other associated costs. Prio「 approval of ADDC/ENGINEER shall be obtained for materials「equiredto be supplied for which no unit rates are ente「ed.
 
Under-utilizationor non-utilization of these unit rates shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the Contract Value.
 
31. Charges for  Disturbing And/Or Removal of Grass, Trees
 
The current regulations of the Agricultu「al Section of the Abu Dhabi Municipality dictate that before any pipe laying activities in green areas are allowed to start, charges at the current applicable rate for  disturbing,  removing  and  reinstallation  of  plantations shall  be paid  by  the CONTRACTOR
d「i ectly to the mentioned section.
 
Solely the representative of the Agricultural Section will determine the extent of affected green area.
 
The CONTRACTOR will be reimbursed the actual amounts paid, net, on presentation of proof of payment, subject to the ADDC's/ENGINEER's approval. All overheads, handling charges and all other costs involved shall be included in the other rates for local expenses. The Agricultural Section will perform removal, preservation if any, transportation and reinstallation of plantations as required.
 
The CONTRACTOR shall comply with the most recent regulations issued by concerned authorities regarding working in  the vicinityof planted areas
 
32. Reinstatement of Asphalt Road Surfaces
 
Unit 「 ate for reinstatement of asphalt road surfaces shall be measured per metre run with a maximum width of 2.0m and shall be paid as per CONTRACTOR'S quoted rate. The TENDERER's attention is drawn to Abu Dhabi Municipality Road Section regulations. The mentioned Section may order asphalt reinstatement to be carried out by specialised roadwork contractor approved by the Abu Dhabi Municipality. Contractor to price the item for reinstatement of existing asphalt road in accordance with the current practice being followed by the Abu Dhabi Municipality. The unit price  quoted  against  this item  shall  include for  mobilization/demobilization,  supply  of materials, reinstatement, protection works, detour, traffic control, warning systems, supervision by specialist consultant, main contractor's over head etc. The CONTRACTOR, while pricing this item, is deemed to be aware of the current practice and requirement of the Abu Dhabi Municipality for cut and reinstatement of existing asphalt road surfaces.
 
33. House Connection Arrangements
 
33.1 Concrete Water Meter Box
 
The unit rate for construction of reinforced concrete water mete「 boxes  shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess materia,l preparation of foundation, supply of all materials complete with 160mm diameter uPVC inlet and outlet pipes with temporaryend caps, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, transport to site, installation  of a watertight connection between 160mm diameter duct and water mete「 box, adjusting cover and frame (as supplied in BOO No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawings.
 
 
33.2 Wall Mounted GRP Water Meter Box
 
The unit rates for the supply of wall mounted GRP water meter box shall include but not limited to the supply of stainless steel fixing bolts, lettering on the box in Arabic and English, lockable main door, lockable water meter reading door, provision of key for the lockable door, etc all as per the specification and as shown on the Tender Drawings.
 
The unit rate for installation of the wall mounted GRP water meter box shall include but not be limited to the supply of all materials, installation of the GRP box (as supplied in BOO No. 1) into position, replacement of tiles, bricks or concrete that is damaged during the box installation and
「epainting of the wall as all as per specification and shown on the Tender Drawings.
 
The unit rate for installation of large radius VC bend shall include but not be limited to the supply of all materials , supply and installation of the uPVC bend into position, concrete work, bituminous painting, excavation, backfilling, end capping of the bend, supply and installation  of  protection tube, supply and installation of brass brackets, supply and installation of stainless steel fixing bolts, replacement of tiles, bricks or concrete that is damaged during the bend installation and repainting of the wall as required all as pe「 spec巾cation and shown on the Tender Drawing s
 
33.3 Concrete Stopvalve Box
 
The unit rate for construction of「einforced concrete stop valve box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, preparation of foundation, supply of all materials complete with 110mm or 160mm diameter uPVC inlet and outlet pipes with temporary end caps, bituminous painting, transport to site, installation of a watertight connection between 110mm o「 160mm diameter duct and stop valve box, adjusting cover and f 「 ame (as supplied in BOQ No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawing
 
33.4 Pulling Box
 
The unit rate fo 「 construction of reinforced concrete pulling box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess material, preparation of foundation, supply of all materials complete with 110mm o「 160mm diameteruPVC inlet and outlet pipes, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, installation of a watertight connection between 110mm o「 160mm diameter duct and pulling box, adjusting cover and frame (as supplied in BOQ No. 1) to sidewalk level etc., all as shown on the Tende「 Drawing.
 
33.5 uPVC Ducts (0 110mm & 0 160mm)
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, sealing of duct entrances with end caps, 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backf 曲 ng with approved material in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing
 
33.6 Reinforced Concrete Encased uPVC Ducts (0 110mm & 0160mm}
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, reinforced concrete encasemen,t bituminous painting, sealing of duct entrances with end caps, marking of duct ends with concrete blocks carrying the letter 'W", 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backfililng with approvedmaterial in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing.
 
33.7 7 Polyethylene House Connection Pipes with Auxiliary Items
 
Rates for installation of house connections from distribution mains up to the consumer facility shall be entered in the Schedule of Prices (Billsof Quantities) as a unit rate.
 
No differentiation is made between the installation costs for½", ¾", 1" and 1½" diamet 「e house connections.
 
The unit rate shall include but is not limited to:
 
1. All costs related to providing under pressure-tapping machines inclusive spare parts as described in the specification.
 
2. All costs related to the acceptance tests as described in the specification.
 
3. Excavation necessary to locate the existing wate「 mainfor makni g the tapping.
 
4. Excavation , dewatering, backfilling, and under pressure installation of tapping, with stopcock and coupling, including supply and installation of the wrapping of the ferrule and the saddle strap.
 
5. Excavation, installation and backfill in compacted layers for the polyethylene pipes under unpaved areas between tapping and duct and/or between duct entrances.
 
6. Installation of polyethylene pipes through ducts to water meters; or through ducts and pulling boxes to water meter boxes.
 
7. Closing duct ends after installation of polyethylene pipes.
 
8. Installation of stop valve, non-return valves, lockablevalve, water meter, fittings, couplings etc in the relevant water meter boxes, all as shown on Tender Drawings.
 
9. Supply and installation of water meter support and watertight closing of 110mm or 160mm diameter outlet holes in water meter box wall
 
10. Testing, disinfection, flushing, commissioningetc. of polyethylene pipes including supply and installation of cap (temporary) at the end of the line.
 
11. Installation of warning tape (as supplied under BOQ No. 1) above polyethylene house connection pipes in unpaved areas.
 
12. All costs related to disconnection of existing consumer connection and connection of newly installed house connection to consumer premises, including mobilisation and demobilisation costs of the house connection crew.
 
The details of the tapping machine(s), which will be used by the CONTRACTOR, shall be submitted fo「 approval to the ADDC /ENGINEER.
 
33.8 Rate for Excavation to Locate Existing House Connections
 
The rates for excavations to locate the existing polyethylene pipes and ferrules for house connections shall be per linear metre given in the relevant Schedule of Prices (Bills of Quantities). The rate shall also include the preparation of drawings and sketches showing the locations of the existing house connection lines including the position of ferrules on the distribution lines and existing consumer water meter, tanks and pumps.
 
34. Exhumation, Reconditioning and Dumping of Pipes and Acces sories
 
The unit rate for exhumation shall include excavation, dewatering, recovery of pipes and fittings, cleaning of pipes and fittings by means of brush for initial inspection and backfilling of 「t enches and plugging off any D.I. o「 A.C. lines left in the ground as directed by the ADDC/ENGINEER. Whenever these excavations are made in the existing and/or proposed roads the backfilling shall be made with thoroughly compacted material approved by the ADDC/ENGINEER to the grade level of the road.
 
The unit rate for recond 幾 ionin g shall include but not be limited to loading/unloading, packing and stacking at site stores, cleaning by means of brush, inspection of material, supply and application of coating/liningmaterial, sand blasting of material as directed by ADDC/ENGINEER
 
The unit rate for transportation of rejected pipeline materials to a Municipality approved dump site or other designated site shall include but not be limited to loading and unloading, costs related to obtaining permission of dumping on the dump site or any other designated site.
 
The unit rate for transportation of surplus o 「 exhumed pipeline materials to ADDC stores and/or ADDC approved site or othe 「 designated area shall include but not be limited to loading and unloading, prepa 「 ation for inspection, double handling, costs related to obtaining permission of dumping on the designated dump site or any other site.
 
The unit rates for collection and transportation to site ADDC free issued D.I. pipeline materials or other materials/accessoriesshall  include, but not be limited  to, loading  and unloading, multiple handling, packing and stacking, transportation to and from Contracto'rs workshop/store, cleaning by means of brush, inspection of material. The rates shall also include supply and application of coating/lining material for repairing/touch-up work upto max. 25% of the total working length/surface area of D.I. pipes and fittings and total area of other materials and accessories.
 
The quantities fo 「 the above mentioned unit rates shall be measured according to the working lengths (for example face to face dimensions for flanged valves).
 
35. Safeguarding of Materials
 
The TENDERER shall allow for all costs involved in safeguarding materials in the ground du 「 ing the period after construction and before the Provisiona l Acceptance Certification. All costs incurred in respect of insurance, secu 「 ity, fencing, lighting, watchman and such like shall be CONTRACTOR's responsib小ty, including for replacement of any materials damaged
 
36. Additional Works Due to Existing Pipework
 
The rates for the WORKS shall include for any costs incurred while liasing with the Operation and Maintenance and Field Services Sections of the ADDC in order to shut down existing live pipelines to carry out the WORKS.
 
37. Alternative Methods of Construction
 
The Schedule of Prices (Bills of Quantities) and drawings are based on an acceptable technical solution to the necessary works. The TENDERER shall price the WORKS in accordance with the specified details but he may also propose alternative details. For such alternatives a fully detailed and priced desc「iption of the work shall be incorporated with his Tende「
 
38. Provisional/Alternative Items
 
Certain items listed in the Bills of Quantities are identified as "開ovisional"or "Alternative" items. It is to be understood that these items may or may not be required to be carried out and shall require the written instruction of the ADDC/ENGINEER before being carried out. The non-utilisation of these items shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the CONTRACT value. The TENDERER shall enter prices o「 rates against these Provisional Items in accordance with other clauses of these preambles. All "Provisiona"l items shall be priced, extended and taken to the 間 evant summary for inclusion in the total price for the purpose of bid evaluations. For "Alternative" items, prices shall be mentioned in brackets, but it shall not be considered for inclusion in the totals; only the prices of the base item shall be considered for inclusion in the totals.
 
39. Rates Analysis
 
Upon request of the ADDC/ENGINEER, the TENDERER/CONTRACTOR shall produce a detailed analysis of any or all of his tendered and other rates within two working days  of  being  so requested. The rates inserted by the CONTRACTOR for the different items in the respective Schedule of Prices shall be used as basis for any additions/deletions of the respective items.
 
The CONTRACTOR shall, when directed by ADDC/ENGINEER, submit detailed supplementary schedules  breaking down  the rates for composite  units of wo「ks in the Schedules of Prices into their component elements in such detail as shall be required by ADDC/ENGINEER.
 
40. Cad   Drawings  & Word Processing  for  Specifications and Documents
 
Unless otherwise approved by ADDC/ENGINEERdrawings shall be prepared in AutoCAD drafting system conformable to ADDC GIS System in accordance with specifications. The cost items for as-built  drawings  shall  include  the  cost  of  required  prints,  transpa「encies  and  computer floppy diske ttes/CD for the same as detailed in the Schedule of Prices (Bills of Quantities).
 
The Operation and Maintenance Manual, Record Books, etc. shall be prepared as maximum as possible on MS Word or similar computer word processing
 
41. Pipeline Connection I Discinnection
 
The rate for connections / disconnections includes for additional excavations, dewatering, backfilling,  required  additional  working  hours, multiple  cuttings and  multiple  connections  in  any configuration on main and branch lines including removal of pipes, fittings, valves, flow meters, accessories etc., and transport to store, installation of pipes, fittings, valves, flow meters, accessories etc., and all associated works for each tie in point to the new pipeline
 
Pipeline connection / Disconnection shall include the items listed below:
 
The rates for these works shall include for any costs incurred in supporting/liaising with the Operations and Maintenance section of ADDC in order to temporarily shutdown or trial shutdown and carry out the Connection I Disconnection works to DI, HOPE, CS or AC pipelines.
 
In all cases the rates shall include for all costs associated with meeting the requirements of ADDC, Operation and Maintenance section of ADDC in respectof shutdown procedures and any restrictvi e timing for shutdown of pipelines.
 
The rate shall include the p「ov閣 on of lights, generator and any facility「equired for necessary works outside normal working hours.
 
The rates shall include for the provision of additional dewatering pumps and protected sump pits for the rapid removal of water during draining of the existing pipelines at the location of dewatering points.
 
The pipeline sizes mentioned in BOQ are for the main pipeline.
 
42. Construction, Installation and Commissioning of Above Ground Temporary Cs Pipeline
 
Construction of temporary above ground CS pipeline shall include for installation of all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces, blank flanges, .. 舍 etc), construction of all concrete supports,  fixing  clamps, pipe cutting, welding, fabrication, including detailed design, preparation of detailed construction drawings, method statements, protection of existing  services, provision of bank  guarantee (if required), safety measures,  additional working
 
hours,  connection/disconnection,   dewatering,   pressure  testing  and  disinfection  of constructed
tempo 「 ary pipeline to successfully commission the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
43. Construction, Installation and Commissioning of Underground Temporary CS Pipeline
 
Construction of temporary underground CS pipeline shall include fo 「 installationof all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces , blank flanges, ...etc), construction of road crossings, pipe protections excavation, backfilling, fixing clamps, pipe cutting, welding,  fabrication,  including  detailed  design,  preparation  of  detailed  construction  drawings, method statements, protection of existing services, provision of  bank  guarantee  (if  required}, safety measures, additional working hours, connection/disconnection, dewatering, pressure testing and disinfection of cons 「t ucted temporary pipeline to successfully  commission  the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
44. Removal/Dismantling and Transportation of Temporary Carbon Steel Pipeline
 
The rates and prices shall include for dismantling, removing and transportation of temporary above ground/undergroundpipes, fittings , valves and all accessories installed for the tempo「ary pipeline including any excavation, backfilling, reinstating of trenches, roads, parking and green areas, connections/disconnection,sdewatering, required additional working hours, multiple cutting, welding, handling, multi transportation, cleaning, repairing and painting where needed, and transportation of material to construction STAGE location within the project area, ADDC store and/or any other location within Abu Dhabi Island assigned by ADDC/ENGINEERas per the project plan and staging construction schedule approved by ADDC/ENGINEER to successfully complete the project scope indicated in the TENDER.
 
The payments for the CONTRACTOR will be equal  installments  for  each  STAGE  as per the project plan and staging construction schedule approved by ADDC/ENGINEER. Payments to the CONTRACTOR  for each stage shall be made only afte「 the successful commissioning of the new permanent waterline  of the intended STAGE.  The final/balance  payment  will be only made after the complete transportation of all materials used for the temporary WORKS to ADDC Store or any other location indicated by ADDC/ENGINEER within Abu Dhabi Island . All materials should be approved by ADDC/ENGINEERafte 「 inspection. The CONTRACTOR shall consider all necessary cleaning ,  repairing,  refurbishment  and  painting  of  the  materials  to  meet  ADDC/ENGINEER approval requirements.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
PROJECT: Planning and
Development of Master Plan Project No.:
Infrastructure (MPIC) for Training Summary 1 of 1
Village I Al Hafar Region
 
 
SUMMARY SHEET
 
BILL NO. DESCRIPTION AMOUNT (DH)
 
1 SITE WORK AND PRELIMINARIES
 
 
2 ROADWORKS
 
 
3 ELECTRICAL WORKS
 
 
4 TELECOM DUCTING WORKS
 
 
5 SECURITY DUCTING WORKS
 
 
6 WATERWORKS
 
 
7 STORM WATER WORKS
 
 
8 SEWERAGE WORKS
 
 
9 IRRIGATION WORKS
 
 
10 LANDSCAPING WORKS
 
 
GRAND TOTAL OHS.
 
 
GRAND TOTAL (IN WORDS):
 
 
N__O__T_E_·_
Preamble to Bill of Quantities/Scheduleof Prices is a part of this specification and should be considered with this document
 
PROJECT
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
DAY WORK SCHEDULE (DW)
 
1) Labou「
 
2) Material
 
3) Plant
 
 
PROJECT: Planning and Development of Master Plan & Infrastructure (MPIC) for T「 aining Village / Al Hafar Region
Project No.· PPC/ Day Works Plot No.
P2 PAGE NO.
 
1 of 2
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
1.01. IPART 1 · LABOURER
 
 
1.01. 1  !Labour, non-skilled
 
1.01. 2 ILabour, semi-skilled (Assisting tradesman)
 
Hour Hour
 
1.01. 3   ILabour,   semi-skilled  (Operating  light power  operated
mechanical plant vis . rammers, concrete
breakers.) I   Hou r
 
 
1.01.  4  ISurveyor
 
1.01. 5  !Chain man
 
1.01. 6  !Carpenter
 
1.01.  7   ICarpenter's Mate
 
1.01. 8 !Trade man (Working with tools)
 
1.01.  9   IConcrete finisher
 
1.01. 10 ISteel bar bender or fixer
 
1.01. 11 IWelder or burner (Where not included with Plant)
 
1.01.  12 IBlacksmith
 
1.01. 13 IBlacksmith's mate
 
1.01. 14 IElectrician
 
1.01. 15 IElectrician's mate
 
1.01. 16 IF仆ter (Not engaged on plant maintenance)
 
1.01. 17 IFitter's mate
 
Hour
 
Hou「Hour Hour Hour Hour Hour Hour Hour
Hou「Hour Hour Hour Hour
 
1.01. 18 IPlumbe 「
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engine 「e
 
DAYWORK  RATES
No work carried out on a day basis will be measured unless, before starting wo 歡 the Contractor  has obtained the written approval of the Engineer
 
2.02 IPART 2·MATERIAL
 
2.02  1  !Water, brackish Imp. Gals.
 
2.02 2   !Water , fresh Imp. Gals.
 
 
2.02  3   !Portland cement  ,  sulphate resisting portland  (with bags) 6 ton loads (metric tons)
 
2.02 4 !Reinforcing steel mild steel complying with Section V , Concrete Works (metric tons)
 
2.02 5 IPVC waterstop, complying with Section V, Concrete Works
 
2.02 6   IPreformed joint filler, 1.2cm thick, as specified I L.M
 
2.02 7   !Steel angles ,   tees,  channel sections   and plates not exceeding  6mm thickness,  (galvanised) complying with! Tons Section XII, Metal Works (metric tons
 
2.02 8   !Ditto, not exceeding 15mm thick I Tons
 
 
2.02 9   !Timber in planking and strutting ,  not exceeding 5cm thick (5cu. metre loads)
 
2.02 10 IDitto, exceeding 15cm thick (5cu. meter loads)
 
2.02 11 IExtra over timbe「 in planking and strutting left in place
 
2.02 12 !Timber in sawn formwork lining
 
2.02 13 !Lined formwork for surface texture specifiedtreatment as
 
2.02 14 IK-140 concrete delivered on site
 
2.02 15 IK-250 concrete delivered on site
 
2.02  16 IBorrow materia,l load bearing
 
2.02 17 IBorrow material non-load bearing
 
2.02 18 IRigid polyvinylchloride (PVC) conduit, 10cm d舊
 
2.02 19 IDitto, 15cm dia
 
DAYWORK RATES
No work carried out on a day basis will be measured unless , before starting wo 水 the Contractor has obtained the written approval of the Engineer
 
 
2.02 20 IDitto, 20cm dia
 
2.02 21 IPerforated Polyvinyl chloride (PVC) pipe wrapped with filter fabric, 10cm dia.
 
2.2 22 IKerb paint
 
Total CARRIED  FORWARD
 
Day Works
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 DA YWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor has obtained the written approval of the Engineer
 
 
 
3.03. 10 IConcrete mixer (5.0 m 叮
 
3.03. 11 IConcrete prams
 
3.03. 12 IConcrete hand trucks
 
3.03. 13 IConcrete finisher, mechanical
 
3.03. 14 IConcrete vibrator, petrol or electric, with stinger CRANES (PETROL OR DIESEL)
3.03.  15 IMobile road type (10 ton)
 
3.03. 16 I D八to (20-ton) - Dragline
 
Hour Hour Hour Hour Hour
 
Hour Hour
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 17 IDitto (50-ton)
 
3.03. 18 IDitto {150-ton)
 
3.03. 19 ICrane bucket (attachment) (under 1 m叮
 
3.03. 20 IDitto (5 m叮
 
3.03. 21 ICrane mounted on truck (20 ton)
 
 EXCAVATORS
 
Hour Hour Hour Hour Hour
 
 
3.03. 22 IMechanical, diesel, face shovels, skimmers, drag- lines or back - acters with single equipment
(Maker's rated capacity 0.5 m3) I  Hour
 
3.03. 23 IDitto {Maker's rated capacity 1.0 m3) I Hour
 
3.03. 24 IDitto (Maker's rated capacity 2.0 m3} I  Hour
 
GENERATING  SETS (Petrol or Diesel)
 
 
3.03.  25 IGenerating sets, complete (3 kVA)
 
3.03. 26 IDitto (10 kVA)
 
3.03. 27 IDitto (15 kVA)
 
GRADERS
 
3.03. 28 IBulldozer complete with bull or angling blade (Equivalent to Caterpillar D4)
 
3.03. 29 IBulldozer (Equivalent to Caterpilla「 06)
 
3.03. 30 IBulldozer complete with bull or angling blade (equivalent to Caterpillar 0 8)
 
3.03. 31 !Tractor type with heavy ripper (Equivalent to Caterpillar DSK/No8)
 
3.03. 32 ITrack-Type Loader , 1.15 m 3 bu c ket (Equivalent to Caterpillar 941 B)
 
3.03. 33 IWheel loader (Equivalentto Caterpillar 966)
 
DAYWORK RATES
No work earned out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 34 IDitto, 1.90 - 2.48 m3 bucket (Equivalent to Caterpillar 977 L)
 
3.03. 35 IWheel tractor-scraper, struck, capacity 16 m3 (Equivalent to Caterpillar 631 D)
 
3.03. 36 IDitto, 24.5 m3 (Equivalent to Caterpillar651 B)
 
3.03. 37 IMotor grader, flywheel h.p.-125 (Equivalent to Caterpillar 651 B)
 
3.03.  38 IDitto, h.p.-150 (Equivalent  to Caterpillar 140 G)
 
3.03. 39 IWheel loader, bucket range 1.15 -1.34 m3 (Equivalent to Caterpillar 920)
 
3.03. 40 IDitto, 3.45 - 4.20 m'(Equivalent to Caterpillar980B) RAMMERS  MECHANICAL
3.03.  41 IMechanical, power rammer
 
3.03.  42 ICompactor, (Equivalent to Caterpillar 816)
 
3.03. 43 ICompactor, vibratory type, (5000 cpm)
 
3.03. 44 IPump (submersible 2" to 6") RQLLERS (Petrol or Diesel Driven)
3.03. 45 IRubber tyre, (25-ton)
 
3.03. 46 ISteel roller, under 5 tons
 
3.03. 47 IDitto, over 5 tons
 
3.03. 48 IDouble drum sheep foot roller with tract rammer
3.03. 49 ICompactor, plate type TRUCKS  (Petrol  or Diesel)
 
 
Hour
 
 
Hour Hour
 
Hour Hour
 
Hour Hour
 
 
Hour Hour Hour Hour
 
 
Hour
Hour Hour
Hour _
Hour  
FOR ENDER 0, L V
PA .
 
3.03. 50 ILand rover or pick-up
 
3.03.  51 IPick-up (3 ton - long bed)
 
3.03. 52 IVan or similar utility vehicle (10-ton)
 
Hour Hour Hour
 
2 2 OCT 2012
.-. . ...一,
TE  OOiN M.E. td.
 
Total CARRIED FORWARD
 
Day Works
 
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 53 IDumper (1 m叮
 
3.03.  54 IDumper (4 m3)
 
3.03. 55 IDumper (8 m 叮
 
3.03. 56 IDumper (20 m 叮
 
3.03. 57 IDumper (30 m 叮
 
3.03. 58 ISelf-propelled water sprayer (1000 gal.) (including water)
 
3.03. 59 IWater tanker (3000 gal.)
 
3.03. 60 IWater tanker (5000 gal.)
 
3.03. 61 IUtility truck with 3-ton hoist
 
 MISCELLANEOUS
 
3.03. 62 IDumpy level, staff and ancillary equipment
 
3.03. 63 ITheodolite, staff and ancillary equipment
 
Hour Hour Hour Hour Hour
 
Hour Hour Hour Hour
 
 
Hour Hour
 
3.03.  64 IOxy-acetylene cutting and welding sets inclusive of oxygen and acetylene (excluding underwater
equipment) I   Hour
 
 
3.03. 65 IElectric welding set , 300 amp. including electrodes for single operator
 
3.03. 66 IDewatering equipment including pump, hoses, well points, earth drilling auger, etc. Dewaters up to 50 s.m.
 
 
Total CARRIED  FORWARD
 
Day Works
上海翻譯公司完成工程類英文翻譯

世聯(lián)翻譯-讓世界自由溝通!專業(yè)的全球語言翻譯供應(yīng)商,上海翻譯公司專業(yè)品牌。絲路沿線56種語言一站式翻譯與技術(shù)解決方案,專業(yè)英語翻譯、日語翻譯等文檔翻譯、同傳口譯、視頻翻譯、出國外派服務(wù),加速您的全球交付。 世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。
  • “貴司提交的稿件專業(yè)詞匯用詞準(zhǔn)確,語言表達(dá)流暢,排版規(guī)范, 且服務(wù)態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達(dá)質(zhì)量得到很大提升”

    華東建筑設(shè)計(jì)研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯(lián)翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),得到了國外合作伙伴的認(rèn)可!”

    世萬保制動(dòng)器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學(xué)研究軟件、儀器和集成系統(tǒng)的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強(qiáng),翻譯難度較大,貴司總能提供優(yōu)質(zhì)的服務(wù)�!�

    諾達(dá)思(北京)信息技術(shù)有限責(zé)任公司

  • “為我司在東南亞地區(qū)的業(yè)務(wù)開拓提供小語種翻譯服務(wù)中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時(shí)翻譯質(zhì)量和速度也得到我司的肯定和好評!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質(zhì)量實(shí)在不敢恭維,所以當(dāng)我認(rèn)識(shí)劉穎潔以后,對她的專業(yè)性和貴公司翻譯的質(zhì)量非常滿意,隨即簽署了長期合作合同�!�

    銀泰資源股份有限公司

  • “我行自2017年與世聯(lián)翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對我行提出的要求落實(shí)到位,體現(xiàn)了非常高的專業(yè)性�!�

    南洋商業(yè)銀行

  • “與我公司對接的世聯(lián)翻譯客服經(jīng)理,可以及時(shí)對我們的要求進(jìn)行反饋,也會(huì)盡量滿足我們臨時(shí)緊急的文件翻譯要求。熱情周到的服務(wù)給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復(fù)雜,試譯多家翻譯公司,后經(jīng)過比價(jià)、比服務(wù)、比質(zhì)量等流程下來,最終敲定了世聯(lián)翻譯。非常感謝你們提供的優(yōu)質(zhì)服務(wù)�!�

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強(qiáng),涉及面廣,翻譯難度大,貴司總能提供優(yōu)質(zhì)的服務(wù)。在一次業(yè)主單位對完工資料質(zhì)量的抽查中,我司因?yàn)槎砦姆g質(zhì)量過關(guān)而受到了好評�!�

    中辰匯通科技有限責(zé)任公司

  • “我司在2014年與貴公司建立合作關(guān)系,貴公司的翻譯服務(wù)質(zhì)量高、速度快、態(tài)度好,贏得了我司各部門的一致好評。貴司經(jīng)理工作認(rèn)真踏實(shí),特此致以誠摯的感謝!”

    新華聯(lián)國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強(qiáng)的專業(yè)性,貴公司的德文翻譯稿件和現(xiàn)場的同聲傳譯都得到了我公司和合作伙伴的充分肯定�!�

    西馬遠(yuǎn)東醫(yī)療投資管理有限公司

  • “在這5年中,世聯(lián)翻譯公司人員對工作的認(rèn)真、負(fù)責(zé)、熱情、周到深深的打動(dòng)了我。不僅譯件質(zhì)量好,交稿時(shí)間及時(shí),還能在我司資金周轉(zhuǎn)緊張時(shí)給予體諒�!�

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯(lián)翻譯一直保持著長期合作關(guān)系,這家公司報(bào)價(jià)合理,質(zhì)量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對方也很認(rèn)可。”

    北京世博達(dá)科技發(fā)展有限公司

  • “貴公司翻譯的譯文質(zhì)量很高,語言表達(dá)流暢、排版格式規(guī)范、專業(yè)術(shù)語翻譯到位、翻譯的速度非�?�、后期服務(wù)熱情。我司翻譯了大量的專業(yè)文件,經(jīng)過長久合作,名副其實(shí),值得信賴�!�

    北京塞特雷特科技有限公司

  • “針對我們農(nóng)業(yè)科研論文寫作要求,盡量尋找專業(yè)對口的專家為我提供翻譯服務(wù),最后又按照學(xué)術(shù)期刊的要求,提供潤色原稿和相關(guān)的證明文件。非常感謝世聯(lián)翻譯公司!”

    中國農(nóng)科院

  • “世聯(lián)的客服經(jīng)理態(tài)度熱情親切,對我們提出的要求都落實(shí)到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責(zé),獲得與其共事的公司總部同事們的一致高度認(rèn)可。”

    格萊姆公司

  • “我公司與馬來西亞政府有相關(guān)業(yè)務(wù)往來,急需翻譯項(xiàng)目報(bào)備材料。在經(jīng)過對各個(gè)翻譯公司的服務(wù)水平和質(zhì)量的權(quán)衡下,我們選擇了世聯(lián)翻譯公司。翻譯很成功,公司領(lǐng)導(dǎo)非常滿意�!�

    北京韜盛科技發(fā)展有限公司

  • “客服經(jīng)理能一貫熱情負(fù)責(zé)的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協(xié)助我方建立專業(yè)詞庫,并向譯員準(zhǔn)確傳達(dá)落實(shí),準(zhǔn)確及高效的完成統(tǒng)一風(fēng)格。”

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對翻譯項(xiàng)目進(jìn)行了幾次詳細(xì)的會(huì)談,期間公司負(fù)責(zé)人和廖小姐還親自來我社拜訪,對待工作熱情,專業(yè)度高,我們雙方達(dá)成了很好的共識(shí)。對貴公司的服務(wù)給予好評!”

    東華大學(xué)出版社

  • “非常感謝世聯(lián)翻譯!我們對此次緬甸語訪談翻譯項(xiàng)目非常滿意,世聯(lián)在充分了解我司項(xiàng)目的翻譯意圖情況下,即高效又保質(zhì)地完成了譯文�!�

    上海奧美廣告有限公司

  • “在合作過程中,世聯(lián)翻譯保質(zhì)、保量、及時(shí)的完成我們交給的翻譯工作�?蛻艚�(jīng)理工作積極,服務(wù)熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝。”

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項(xiàng)目與你們相識(shí)乃至建立友誼,你們報(bào)價(jià)合理、服務(wù)細(xì)致、翻譯質(zhì)量可靠。請?jiān)试S我們借此機(jī)會(huì)向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯(lián)的翻譯質(zhì)量,交稿準(zhǔn)時(shí),中英互譯都比較好,措辭和句式結(jié)構(gòu)都比較地道,譯文忠實(shí)于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應(yīng)也不錯(cuò)�!�

    TNC大自然保護(hù)協(xié)會(huì)

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務(wù),因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),給我們留下了非常深刻的印象�!�

    北京師范大學(xué)壹基金公益研究院

  • “在與世聯(lián)翻譯合作期間,世聯(lián)秉承著“上善若水、厚德載物”的文化理念,以上乘的品質(zhì)和質(zhì)量,信守對客戶的承諾,出色地完成了我公司交予的翻譯工作�!�

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項(xiàng)目要求時(shí)間相當(dāng)緊湊,所以世聯(lián)在保證質(zhì)量的前提下,盡力按照時(shí)間完成任務(wù)。使我們在世博會(huì)俄羅斯館日活動(dòng)中準(zhǔn)備充足,并受到一致好評�!�

    北京華國之窗咨詢有限公司

  • “貴公司針對客戶需要,挑選優(yōu)秀的譯員承接項(xiàng)目,翻譯過程客戶隨時(shí)查看中途稿,并且與客戶溝通術(shù)語方面的知識(shí),能夠更準(zhǔn)確的了解到客戶的需求,確保稿件高質(zhì)量�!�

    日工建機(jī)(北京)國際進(jìn)出口有限公司

午夜福利啪爽国产片精品| 欧美三级直播美女视频在线观看| 日韩精品中文字字幕有码专区| 成人性毛片免费观看黄| 粉色视频免费观看下载| 亚洲综合五月天激动情网| (愛妃)久久AV无码精品人妻出轨| 国产露脸无码a区久久蘑菇| 调教.求饶乖腿打开h| 亚洲另类无码一区二区三区冫| 在线免费观看a级片| 国产亚洲精品精品在线精品| 亚洲视频在线观看免费一区| 亚洲视频在线观看污污的黄 | 日韩欧群交p片内射中文| 久久精品日产第一区高清版| 日韩精品毛片无码一区| 国产精品色哟哟免费看麻豆| 最近免费MV在线观看| 99久久久国产免费观看精品| 欧美韩国亚洲精品综合a| 欧美.久久久.精品| 老赵揉着粉嫩的双乳太舒服了秀婷| 亚洲精品美女网站久久m| 亚洲最新无码2021| 亚洲精品一级在线播放| 日韩免费不卡视频1| 亚洲国产日韩欧美综合在线一区二区三区| 精品自拍一區| 欧美日韩精品一级高清| 日韩一二区无码精品一区| 国产欧美va欧美va在线动漫| 日韩偷拍一区二区三区| 先锋影音制服丝袜| 国产精品无码久久AV嫩| 国产成人福利在线观看视频| 黄色一级毛片在线| 福利姬白浆AV导航| 日韩av手机在线观看不卡| 九一视频免费版污| 性国产日韩欧美一区二区在线| 高潮时奶水喷出来了| 美女扒开尿眼无遮挡免费视频| 成在人线Aⅴ免费观看| 国产精品美女白丝自慰| 国产这里有精品视频互動交流| 一级黄色毛片在观看| 久久亚洲av成人网| 国内真实刺激对白自拍视频| 张警官撞玻璃9分10秒| 国产小视频一区二区三区中文字幕在线播放| 色婷婷综合在线视频| 久久亚洲免费伦理| 免费无码AV片在线观看sm| 亚洲人成网址在线观看| 免费一级毛片在线播放放| 久久免费福利资源站| 精子射入几天可以着床| 午夜福利导航APP| 全免费a级毛片免费| 国产成人AV一区二区三区| 444kk免费看片在线观看| 女人被男人桶| 99久久99久久久精品| 在线免费观看a级片| 国产av最新网址| 最新欧洲日韩在线播放| 日韩一二区无码精品一区| 自慰在线观看18p| 亚洲中文无码日韩A∨精品亚洲免费观看网| 冯仰妍破处门| 免费嗨片直播网中文字幕| 女性高爱潮免费有声视频网站| 制服丝袜自拍偷拍av一区| 精品久久久久久久久久香蕉| 亚洲视频在线观看免费一区| 亚洲人成色7777在线观看不卡| 一级特黄不卡视频免费观看| 有没有免费无码h网站的| 欧美日韩精品一级高清| 老司机在线观看亚洲二区一区| 亚洲日产精品一二三四区| 午夜精品一区二区三区在线成人 | 亞洲Aⅴ无码乱码在线观看| 香港三级日本三级妇三级| 亚洲精品成人?v在线| 欧美极品jizzhd欧美仙踪林| 久久无码私人网站| 欧美性爱综合网站99国品区区视频 | 亚洲中文无码成人网| av日韩在线观看一区二区三区| 天天噜夜夜噜狠狠噜| 欧美三级欧美成人高清www| 黄色美女免费| 亚洲国产一级精品毛一级精品看免费视频 | 狠狠躁天天躁无码中文幕| 一级不卡无码免费黄片| 电影a区三区四区男人| 中文字幕无?v免费久久| 女性喷液过程高清免费视频| 国产国产成人久久精品杨幂 | 久久久久久av无码专区| AV网站国产大全| 无码专区 免费在线| 无套挺进少妇私下处内射| 艳妇荡乳欲伦2中文字幕| 伊人久久综在合线亚洲2019}| 善良的嫂子高清播放完整版| jizz狼友国产高清交流a| 超碰97久久尤物| 婷婷成人久久精品国产| 国产精品剧情在线蜜臀| 免费国产成人无码学生妹| 少妇白浆一区二区| 添添躁狠狠躁| 99久久精品一区二区毛片下载| 99天天操天天做天天| 国产特黄色一级| 激战雪姨后厨2最新版本更新内容| 美女黄又色高清视频免费| 女人用炮机高潮合集视频播放 | 免费精品一区二区中文字幕| 黄色av网页地址一| 欧美男人与动牲交zooz| 亚洲欧美一区二区三区69| 韩国三级电影久久久| 久久精品99国产国产精人s| 網友分享国产一区精品在线心得| 亚洲制服精品一区二区三区| 福利社区在线观看| 精品区一区二在线观看| 国产白丝喷水娇喘视频| 久久精品人妻中文系列葵司| 全免费a级毛片免费| 色影音先锋色资源网站| 国产免费经典三级| 黑人巨大精品无码专区| 黄色a级视频免费播放| 亚洲青青草原男人的天堂| 久久精品99毛片免费| 亚洲日本欧洲综合| 27报视频十八禁| 国产精品国产亚精品不卡| 最新av网站网址免费观看| 日韩国产欧美成人综合另类| 日韩美女粉嫩小泬在线精品| 影视久久夜色国产精品噜噜噜 | 嘿嘿连载下载app| 在线免费观看国产视频| 人妻出差精油按摩被中出| 日韩精品亚洲色大成网站| 国产一级婬片免费播放电影 | 谁有操逼毛片网站| 无码专区 免费在线| 狠狠色狠狠色綜合久久第一次| 日本中文字幕视频一区欧美激情| 亚洲欧美精品免费观看| 久久精品2021国产| 国产成人AV一区二区三区| 国国产精品V欧美精品∨日韩| 色欲久久国产色av免费看老司| 亞洲A∨精品一區二區三區下載| 黄片软件免费下| 2021最新在线无码视频| 国产超级无码一极毛片| 国产亚洲乱码无码www| 激情精品视频在线观看| 麻豆精品国产一级| 久久久久av綜合網成人| 亚洲素人无码三级| 日韩免费不卡视频1| 中文字幕一区日韩无码| 欧美亚洲日韩国产中文在线| 综合亚洲高清国产| 国产亚洲欧美ai在线看片| 啦啦啦www在线观看免费视频动漫| 亚洲精品美女网站久久m| 亚洲私人无码综合久久网| 午夜成人精品福利网站在线| 亚洲国产的精品太乱码一区二区| 国产日本精品一区二区三区| 網友分享免费福利资源站在线视频心得| 亚洲国产视频二区| 国产精品热门jizz| 亚洲欧美日韩另类色图| 秋霞鲁丝片AV无码| 成人自拍视频在线观看| 欧美一区二区三区福利网| 一级做a爱片高潮毛片| 久久免费福利资源站| a级高清毛片视频免费观看| 自偷自偷自亚洲首页精品| yy111111少妇影院无码光屁股| 2019天天拍拍天天爽视频全集 | 亚洲最新无码2021| 黄色成人香蕉视频网站| 欧美一级视频高清片| 国产aⅤ一二三区无码视频| 最近2019中文免费字幕在线观看| 大屁股人妻女教师撅着屁股| 国产αV无码日韩αV无码网站| 国产成人av一区二区三区中文精品| 在线美女一区二区三区四区| 国产成人合集在线播放| 久久无码精品国产亚洲AV未满十八| 国产精品美女白丝自慰| 亚洲熟妇无码AV| 欧美丁香五月激情网| 成人国产精品视频| 黑人和少妇冒白浆了| 福利社区在线观看| 欧美性生活视屏精品| 午夜手机影视工场全集观看免费| 在线免费观看国产视频| 丁香五月婷婷综合网| 日韩欧美国产三级一区| 99久久国产热无码精品免费久久精品A亚洲国产V高清不卡 | 久久亚洲免费伦理| 国产一边做一边爱视频| 美人+妻+影音先锋| 无码高清在线不卡一区二区| 男人你懂的在线观看视频| 亚洲色图在线视频| 国产欧美日本韩国高清视频一区二区三区免费在线 | 老司机影音先锋日本网站在线| 色综合久久综合中文综合网| 老妇亚洲精品国产免费无码| 免費在線一級片| 久久久久久久久av毛片| 91视频污APP色版下载| 五月丁香色婷婷蜜桃| 尹人在线视频| 亚洲欧美制服专区| 国产羞羞视屏在线观看| 一区二区三区不卡中文字幕| 日韩精品毛片无码一区| 国产韩国一区二区三区| 少妇极品美軳人体337p| 一区二区三区在线观看欧美 | 中文又粗又大又硬毛 | 肛交的免费视频91视频| 久久综合综合久久?V在钱| 无码一级午夜福利区久久浪潮av| 成人丝袜18秘 视频在线观看| 国产又黄又骚又猛欧美| 日本一本高清在线观看视频亚洲一区二区三区 | 玩弄粉嫩少妇高潮出白浆AⅤ| 国产av无码变态另类专区| 五月综合婷婷欧美| 久久99国产精品二区不卡| 一区二区三区四区在线免费观看 | 一区二区三区人妻免费视频| 蜜臀久久精品国产亚洲av| 日韩中文字幕欧美亚洲第一区| 国产精品视频毛片| 双性调教结婚每日淫训| 日韩高清一区二区第50页| 亚洲一区二区三区日韩国产| 午夜免费福利av| 免费AV一区二区三区3ATV| 伊人久久综在合线亚洲2019}| 欧美性爱福利视频| 久久网无码一级毛片| 成人欧美一区二区三区在线观看| 男女高潮吃奶添下面动态图| 野花社区最新免费视频| 国产天堂网www在线资源av网| 国产成人综合在线女婷五月99播放| 最新欧美一区二区不卡视频 | 国产不卡免费在线视频| 国产成人精品毛片AV在线| 在线免费观看国产视频| 亚洲精品成人一二三区| 牛牛色婷婷在线视频播放| 久久夜靖品2区含羞草| 精品国产青草久久久久福利| 国产成人综合亚洲网址| 最新欧洲日韩在线播放| good电影在线观看三级中文| 一级免费十八岁无毛毛片视频| 日韩午夜在线高清成人| 无码观看在线一区| 日韩精品一区二区在线观看视频| 午夜精品九九九九99蜜桃| 一区二区三区在线观看欧美| 中文字幕免费日韩中文中文| 一色一情一伦一区二区| 96久久自偷自偷国产精品| 欧美日韩国产性爱| 日韩av手机在线观看| 特级一级毛片视频免费观看| 91情侣在线精品国产| 宝可梦沙奈朵口吐白色液体| 美女内射口爆av在线| 日韩午夜不卡在线看| 人妻中文字幕无碼在线| 亚洲精品国产导航一区二区| 91情侣在线精品国产| 亚洲日韩国产精品久久久综合网| 日韩欧美国产三级一区| 善良的嫂子高清播放完整版| 亚洲麻豆精品久久久| 国产热の有码热の无码视频| heyzo无码综合亚洲精品| 99re66热这里只有精品66| 欧美中文字幕在线视频| 国产αV无码日韩αV无码网站| 最近更新中文字幕大全| 益日韩欧群交P片内射中文| 少妇无码AV无码专区在线| 黄色大片一级毛片视频| 十八禁爽爽爽无遮挡在线观看网站| 亚洲色综合亚洲?V伊人蜜桃偷偷| 韩国三级片在线播放| 丁香亚洲综合五月天婷婷| 久久频这里精品香蕉久久| av一av无码免费观看| 亚洲精品综合在线导航网址| 国产免费人成视频不卡顿在线播放播| 麻豆视频传媒APP| 亚洲 自拍 露出 极品| 亚洲AV无码乱码忘忧草亚洲| 亚洲欧美日韩精品久久久一区二区| 在线观看精品一区二区三区| 手机看片精品国产福利| 欧美性生活视屏精品| 亚洲午夜福利精品一区| 久久伊人毛片视频| 人妻蜜臀av一区二区| 秋霞影院韩国伦片在线播放| av天堂av亚洲啪啪久久无码| 在线视频日本亚洲| 114人体棚拍人体私密大尺度| 亚洲无码模一级黄片| 亚洲女人自熨在线视频| 亚洲色图在线视频| 日本久久高清一区二区三区| 惠民福利黄色成人网站免费无码av| 欧美另类性视频| 国产高清色高清在线观看九在线视频| 欧美亚洲国产手机在线dvd | 免费播放黄色叫床露脸对白影片| 亚洲欧美日韩精品久久久一区二区| 亚洲最新av无码中文字幕一区| 成人高清毛片视频| 人妖系列在线精品| zayou亚洲福利一区| 四虎永久在线免费视频一二区| 父子1v2她还是你的小心肝| 一级做性色α爱片久久毛片色 | 贵州少妇一级毛片| 久久精品視頻只有這里| 嫩草国产等最新內容| 日产精品一二三四区国产亚洲| 国产中文亚洲熟女曰韩| 丁香亚洲综合五月天婷婷| 亚洲女人视在线| 狼人一区二区精品久久| 亚洲一区二区三区日本九九日韩| 亚洲一区二区三区日韩国产| 久久久久国色aV免费软件| 国产高清在线观看AV片| 亚洲中出中文字幕日本| tobu8 天堂网www中文在线| 国产超级va在线观看视频| 看片免费亚洲国产视频大片| 亚洲国产精品香蕉视频| 中文字幕电影一区在线观看| 老子影院午夜伦手机不卡无码| 久久精品国产亚洲A∨未满十八| 无限看片的视频大全免费下载| 久久久久免費精品視頻| 中文字幕無碼亂碼人妻系列蜜桃 | 国精产品一区一区三区m| 奖励网站正能量www正能量| 欧美午夜在线观看免费完整版| 亚洲一区二区一区| 久久久精品2019中文字幕超碰| 国产色精品vr一区区三区| 精品国产AⅤ一区二区三区4区| 国产农民工简易窝棚嫖妓精彩对白| 国产一级无码| 网友分享国产亚洲精品福利片心得| 网友分享国产亚洲精品福利片心得| 国产精品免费播放器大全| 777午夜精品被窝影院| 亚洲国产制服在线观看| 精品手机在线| 大学生一级毛片全黄真无码 | 天堂网www天堂在线资源| 国产视频精选全网| 在线播放国产视频99| 激情男女高潮射精?V免费| app搞鸡视频在线观看黄色| 成在人线Aⅴ免费观看| 国产黄色三级三级三级| 国产亚洲h网综合h网久久| 车里要了好多次天天影院网| 欧洲免费在线视频| 中文字幕无码亚洲视频| 男女十八禁啪啪无遮挡床震窝窝地 | 亚洲 综合 视频 一区| 日韩av中文无码人妻无码| 一级曰本牲交视频| 国产精品成人免费久久久久三级无码a | 高清国产在线日韩欧美| mmuu55首页 日本系列| 亚洲无码日韩精选中文字幕| 车子越颠进入的更深h| 亚洲 欧洲 日韩 综合AV| 久久久久久久久久久国产| 电影《色戒》未删减版| 精品99视频国产免费尤物| 久久免费福利资源站 | 欧美中文字幕网站免费| 国产日潮亚洲精彩视频| 亚洲永久免费无码打屁股 | 桃子视频APP在线下载污| 中文字幕无码色综合| 亚洲一区日本在线| 日韩精品中文字字幕有码专区| xxxx黄色网站在线观看| 久久国产这里只精品免费| 97人人超人人超碰超国产| 欧美午夜久久精品另类| 精品国产?Ⅴ一区二区三区| 日本加勒比麻豆亚洲精品| 美女制服で視頻網站| 欧美性色aⅴ视频一区日韩精品| 欧美性爱综合网站99国品区区视频 | 日韩精品熟女AA久久毛片| 精品黄色国产在线观看| 日韩在线欧美在线一区二区三区 | 免费av中文字幕| 久久精品国产亚洲最新国产| 超碰成人在线91| 97久久国语露脸精品对白| 亚洲国产av无码综合原创国产| 伊人丁香五月在线视频| 啊灬啊别停灬用力啊黑人| 2020日韩中文字幕| 绿巨人聚合app入口| 女人十八毛片免费观| 日日噜噜噜夜夜爽狠狠视频| 18禁美女裸体无遮挡的网站| 婷婷伊人久久大香线蕉AV | 国产成人a在线看片色欲av| 鲁丝片一区二区在线观看| 91免费入口在线观看| 亞洲一區二區三區免費觀看| 欧美激情在线播放一区二区 | 久久人人97超碰人人爱百度 | 久久人人97超碰人人爱百度| 玖玖玖在线视频免费观看| 婷婷六月天无码| 免费黄色小说视频| 在线观看日韩www视频免费| 91成人精品亚洲高清在线观看 | 黑人巨茎大战俄罗斯白人美女| 野外一级爱做片免费观看| 国产偷人视频免费观看| 天天爽爽夜夜爽爽视频小视频| 国产品国语在线不卡| √天堂中文官网8在线| 中文字幕一区二区人妻本田岬| 亚洲视频一区二区三区久久| 在线观看xxxx国产| 国产污污污软件免费下载观看| 亚洲日韩欧美aⅤ精品| 九九九国产在现视频| 91久久精品日本一区| 国产av无码变态另类专区| 久久精品99无色码中文字幕| 国产毛多水多女人A片色情| AV乱码一区二区三区| 99热手机在线最新地址| 91精品国产高清一区二区三密臀| 超碰成人在线91| 超97视频在线免费观看| 久久婷婷国产免费天天| 车子越颠进入的更深h| 中文字幕一本久久综合| 亚州中文字幕| 久热国产精品视频一区二区| 18禁黄网站禁片无遮挡观看APP免费 | 永久免费观看的片毛视频| 久久成人国产精品青青| 欧美成人自拍| 精品妇人妻视在线视频| 麻豆国产AV超爽| 亚洲成AV人手机在线观看网站 | 色欲悠久久久久综合区欧美亚洲日韩| 国产乱子伦午夜精品视频| 免费在线观看一区二区| 日韓三級免費看| 污软件在线观看软件| 日本一本色道高清| 国产露脸无码a区久久蘑菇| 欧美一区二区三区18禁| 欧美jizz18性欧美色天堂综合在线 | 黄色av网页地址一| 高清欧美久久综合| 国产精品AV毛片免费看观看| 91桃色污污污污污污污污污| 中文字幕一区日韩无码| 日本丰满护士bbw| 中文字幕久久精品有码综合网| 色戒未删减2小时38分在线| 女人毛片免费看一分钟| 999免费观看四虎精品国产| ?V无码小缝喷白浆在线观看| 久久黄色美女小视频网站| 欧美特黄三级又爽又粗| k频道国产网红欧美在线视频| 午夜视频成在线人成在线人| 亚洲人妻久久无码| 永久免费毛片久久99| 日韩国产精品一级毛片在线| 中文字幕AV二区| 成人黄片视频免费在线观看| 欧美成人午夜影院| 欧美日韩成人精品第一区| 亚洲日韩av一区久久精品| 轻轻色国产在线视频| 日本国产在线播放一区二区不卡| XVIDEOS免费人成视频网址| 欧美国产在线一区精品自拍| 日韩三级手机在线观看不卡| 欧美第27页网站在线观看| 亚洲AV乱码一区二区三区| 成·人免费午夜无码不卡| 精品国产青草久久久久福利| 在线观看午夜国产精品| 久久精品一区二区三区卡| 97精品一区二区视频观看| 久久久亚洲成人aⅴ| 麻豆国产91视频| 亚洲色图在线视频| 亚洲 自拍 色综欧美合图区| 欧美污污污久久久久久| 四虎sihu新版影院亞洲精品| 亚洲狼人制服中文字幕| 国产片精品mv在线观看| 图片区小说区另类春色蜜芽| 国产成人精品一区二三区韩国| 午夜精品福利91| 无码在线视频免费| 双乳被快递员揉搓玩弄在线播放| 毛片三级片在线免费观看| 永久免费观看啪啪网站欧美| 中文字幕无码亚洲视频| 亚洲熟妇av一区二区三区痴汉 | 高清免费人成在线视频观看| 冯仰妍破处门| 中文日无码在线观看| 亞洲Aⅴ无码乱码在线观看| 欧美经典复古伦理在线| 午夜视频成在线人成在线人| 一级a爱片国产亚洲精品| 天天操天天曰| 久久久久久久女国产乱让韩| 亚洲欧美日韩精品专区52| 国产福利 在线播放| www亚洲欲色成人久久精品| 三级日韩在线不卡| 久久亚洲精品无码观看不卡| 国产无遮挡又黄又爽在线观看| 亚洲国产福利播放| 1024手机在线国产你懂的| 午夜精品一区二区三区国产色欲| 日本特黄特色大片免费在线观看| 欧美在线三级艳情网站亚洲成人99 | 成人高清毛片视频| 欧美成人aa久久狼窝五月| 无码一级午夜福利区久久浪潮av| 日韩AV无码一区二区三区不卡开心久久婷婷综合中文字幕 | 久久天天躁狠狠躁夜夜2020!观看视频 | 欧美激情四射一区二区在线| 免费乱伦亚洲无码| 女人用炮机高潮合集视频播放 | 小编在这里为大家带来看日韩黄色毛片 | 把腿张开乖我添你3p| 亚洲麻豆精品久久久| 亚洲av中文aⅤ无码av电影| 国产乱子伦午夜精品视频| 国产大尺度无遮挡在线观看| 色小说色网视频| 亚洲av中文aⅤ无码av电影| 国产一级婬片免费播放电影| 宝可梦沙奈朵口吐白色液体| 欧美jizz18性欧美色天堂综合在线| 国产午夜福利在线播放87| 日韩婬乱a一级毛片视频| 日韓福利一區| 国产一级A一级裸体片| 前后夹击征服骚女完美爆| 女教师一级特黄毛片| 日韩美女高清视频在线观看| 国产天堂在线一区二区三区 | 亚洲免费成人在线| 香蕉在视频线精品视频| 青青草无码精品伊人久久网站| 亚洲Av秘无码一区二区| 丁香五月婷婷综合网| 日本无码一区AⅤ二三区超碰| 欧美狂野视频在线精品| 一级不卡无码免费黄片| 国产精品欧美久久久无广告| 草草影院欧美三级日本| 天堂在线中文最新版地址| 最新国产成人精品区在线观看| 亚洲MV国产MV在线MV综合试| 一级黄色毛片在观看| 成人午夜精品網站在線觀看| 色影音先锋色资源网站| 天美传媒mv免费观看| 精品国产?Ⅴ一区二区三区| 日本一区二区三区三州| 亚洲日本精品va中文字幕| 人妻撑开合不拢流出白浆视频| 辣妹子影院电视剧免费播放视频大全在线观看 | 免费在线观看一区二区| 伊人丁香五月在线视频| 无码不卡毛片视频免费播放| 日韩三级久久| 在线观看AV无毒网站| 国产免费午夜福利在线播放92| 黄色亚洲黄色日韩| 秋霞午夜国产一区二区三区| 国产无遮挡无码免费视频在线抪 | 亚洲人成网址在线观看| 中文字幕一区日韩无码| 免费+午夜+亚洲| 又大又黄又爽的成人免费视频| 歐美日韓一區二區視頻免費看| 亚洲av无码不卡无码| 中文字幕理论片在线高清| 91麻豆极品99精品国产综合久久久| 欧美在线天堂视频不卡| 白丝被弄羞涩娇喘动态图| 男女视频诱惑国产在线观看| 日本国产在线播放一区二区不卡 | 成人亚洲色欲色一欲| 日韩欧群交p片内射中文| 在线观看AV无毒网站| 精品动漫中文字幕一区| 国产成人精品在线不卡| 丝袜ol美脚秘书在线播放| 成在线人免费视频一区二区| 丁香五月婷婷综合网| 中文字幕黄色在线观看| 亚洲人成色7777在线观看不卡| 天堂成人一区二区三区av片| 中文字幕AV二区| 亚洲欧美一区电影| 精品综合在线99亚洲青草91| 国内9l视频自拍老熟女九色| 亚洲欧美中文李幕高清在线| 国产日韩综合一区二区性色?Ⅴ| 麻豆视频传媒APP| 国产精品二区在线| 亚洲码专区欧美色图久久| 成人欧美视频免费看黄黄| v影院一区二区三区自产不卡视频| 欧洲成熟女人色惰片| 久久九九青青国产精品| 免费黄色小说视频| 白丝紧致爆乳自慰喷水玩具动态图| 在线不卡一区二区三区免费| 国产AV三级精品成人网站| 亚洲一区二区三区aⅴ无码| 久久天天躁狠狠躁夜夜2020!观看视频| 一级免费十八岁无毛毛片视频| 国产一线在线观看| 亚洲欧美自拍唯美另类| 中文字幕乱码亚洲影视亚洲日本va午夜| 国产精品成人免费久久久久三级无码a| 久久精品国产亚洲aⅤ麻豆图片 | 91麻豆一区二区在线观看| 中文字幕一二区二三| 久久天天躁狠狠躁夜夜躁综合| h工口福利里番库全彩| 日韩欧美精品一区在线观看| 欧美影视一区| 性白俄罗斯高清xxxxx| 99re8免费视频精品全部| 黄色人成影院一级| 乡村女教师艳妇欲爱| 亚洲三级毛片在那看| 色吧超碰97人妻| 午夜激情无码| 相泽南作品在线观看| 怡红院免费的全部视频国产a| 美女制服で視頻網站| 久久精品99毛片免费| 国产精品玖玖玖玖影院| 亚洲熟妇av一区二区三区痴汉 | 亚洲色拍国产另类| 国产精品99国产精品久久gif| 成人国产一区| 日韩精品亚洲专区在线影院| 色99热久久99热国产精品| 91香蕉视频下载安装| 欧美日韩二区视频| 色99热久久99热国产精品 | 午夜免费一级av福利毛片| 精品二区三区在线观看| 三级片网站国产欧美日韩| heyzo无码综合亚洲精品| 国产高清不卡免费在线观看| 亚洲人看A∨免费片| av无码三级片在线播放| 激情依依av男人的天堂| 国产成人av国语在线| 一二三四高清在线观看视频中文| 日本高清在线视频无码| 国产一级无码| 国产三级片在线观看网站| 亚洲日韩制服另类| 最近在线中文字幕更新| 色婷婷亚洲综合五月| 欧美日韩精选在线观看| 亚洲精品日韩专区在线观春| 国产精品熟女第7页| 欧美一级aa大片免费看视频 | 最近2019中文免费字幕在线观看| 亚洲影库日韩久久久| 日本人妻最新在线中| 熟女一区二区天天操夜夜操| 国产日韩综合一区二区性色?Ⅴ| 中国激情一区二区三区成人| 久久精品国产国产精品久久| 久久精品亚瑟全部免费观看| 二区三区中文字幕在线观看| 日本丰满护士bbw| 中文字幕久久第13页| 男女高潮吃奶添下面动态图| 亚洲最新无码av网址| 国产黄A片免费网站免费| 精品一区二区三区免费在线视频| 天堂成人在线视频| 亚洲午夜一级精品| 亚洲欧洲在线观看无码| 一级黄色片免费观看| 免费成人三级电影在线观看| 国产精品国产亚精品不卡| 区二区三区在线观看视频| 国产一级a毛一级a做免费高清视频| 久久九九精品视频| 亚洲特级毛片无码免费观看| 欧美国产第一区| 成人av免费网址在线观看| xxxx黄色网站在线观看| 少妇大胆瓣开下部自慰| 国产私人尤物无码不卡| 又大又黄又爽的成人免费视频| 一级?性色生活片毛片| 国产又黄又爽的免费视频| 国产毛多水多女人A片色情| 久久婷婷国产免费天天| 国产精品热门jizz| 亚洲国产日韩欧美综合在线一区二区三区 | 亚洲欧美中文日韩v在线在线观看 91精品国产高清一区二区三密臀 欧美日韩国产三级久久 | 中文字幕理论片在线高清| 四虎www成人影院观看| 香港av无码播放一级毛片免费| 久久精品αⅴ无码中文字字幕不卡| 日本一本色道高清| 色综合久久久久综合体桃| 黄色片久久美女啊啊啊内色| 91精品网站天堂系列在线播放| h工口福利里番库全彩| 国产无遮挡又黄又爽在线观看| 1精品啪国产在线观看免费牛牛| 拔萝卜又疼又叫视频下载安装 | 亚洲国产激情一区在线| 鲁大师在线手机日韩| 1024手机在线国产你懂的| 音影先锋男人在线资源网| 亚洲国产精品香蕉视频| 一级在线中文观看日韩| 欧美亚洲国产另类在线| 午夜最新电影| 自拍欧美亚洲国产成人综合| 女人的天堂毛片AV在线| 97人人视频波多野结衣蜜月| 后入式肏大屁股眼免费视频| 亚洲欧美中文李幕高清在线| 欧美jizz18性欧美色天堂综合在线| 亚洲日本精品va中文字幕| 久久久久av綜合網成人| 97人人超人人超碰超国产| 有没有免费无码h网站的| 日本国产我97在线| 国产精品一区二区三区免费久久| 欧美日韩一区二区三区一| 久久亚洲欧美精品一| 欧美成人精品一区二区男人看| 大香蕉国产综合在线视频| 国产精品美女白丝自慰| 精品免费一区二区爱| 欧美另类癖好手机在线网| 人妻回春按摩肏到中出| 日韩免费无码人妻波多野| 一区二区成人免费网站大全| 女性喷液过免费视频| 欧美在线天堂视频不卡| 国产精品二区在线| 国产刺激精品专区av| 国产又粗又长又爽黄又硬视频| 久精品视频在线播放网站| 少妇中文字幕久久精品无码| 色综合久久综合中文综合网| 无码高清在线不卡一区二区| 美女视频一区二区三区在线| 久久国产精品15色老板| 免费A级特黄片日韩精品| 欧美日本在线不卡二区| 久久久亚洲成人aⅴ| 91精品國產免費久久國語蜜臀| 国产一级a毛一级a做免费高清视频| 精品久久无码中文字幕蜜桃| 青娱乐精品视频在线免费观看| 亚洲精品成人一二三区| 免费精品美女久久久久久久久久| 大黑人交xxxx大黑人交野外| 精品国产v无码大片在| 久久久久久久国产精品视频| 欧美在线Vs免费一级片| 亚洲欧美日韩制服综合| 亚洲全部无码中文字幕| 亚洲无码aⅴ色图| 午夜亚洲亚洲精品福利| 午夜免费福利av| 无码国产福利av私拍导航| 最近2019中文免费字幕在线观看| 免费久久黄色毛片| 免费黄色资源| 国产黄色精品www| 99天天操天天做天天| 成人女人在线观看| 久久sese三级亚洲精彩| 国产成人综合亚洲网址| 欧美日韩主播国产视频| 性色aV一区二区三区红粉影视| 亚洲国产精品第一二三区| 内裤堵嘴app高清| xxxx欧美丰满大屁股| 大学生一级毛片全黄真无码 | 日韩床上特黄一级片| 国产高清乱码无卡女大生| 亚洲国产午夜精品一区二区| 免费最婬荡荡谢毛片午夜剧场 | 99热国产这里只有精品99| 亚洲日韩AV无码中文| 国内9l视频自拍老熟女九色| 欧美大乳中文字幕在线| 亚洲tv日韩tv国产tv无码综合| 久久99国产精品二区不卡| 99热在线观看免费精品| 国产聚色窝在线首页| 中文字幕无码乱人妻| 草久在线视频在线观| a狠狠久久蜜臀婷色中文网 | 少妇系列中文字幕一区| 国产精品二区在线| 丁香五月婷婷综合网| 国产中文亚洲熟女曰韩| 十大禁止安装app软件入口免费| 欧美色图一区二区| 欧美日本成人免费| 日韩美女自慰又黄又粗| 欧美激情一区精品| 女人毛片免费看一分钟| 二区三区中文字幕在线观看| 亚洲中文字幕乱码影院在线| 日韩免费无码| 亚洲精品成人?v在线| 国产精品久久久久桃色tv| 亚洲日韩国产精品久久久综合网| 色综合精品视频在线| 91精品国产91久久久久久无码天美| 丰满少妇强烈进入高清视频| 亚洲男人的天堂在线n| 在线喷白浆在线视频| 中文字幕二区亚洲综合| 日日夜夜摸多人换着玩| 国产精品美女久久久久久大全| 成人综合在线视频免费观看完整版 | 精品自拍自产一区二区三区免费| 国产成年男人裸j网站| 亚洲av永久无码偷拍另类| 少妇熟女高潮流白浆| 人妻五月天精品婷婷| 日韩国产精品等最新内容!| 色偷偷AV永久无码精品无码| 女佣的味道hd中字在线观看| 国产精品精品综合在线网址| 久久久精品产一区二区三区日韩| 亚洲无码模一级黄片| 欧美成人aa久久狼窝五月| 午夜色a大片在线观看免费| 国产又黄又骚又猛欧美| 亚洲国内精品久久久久电影院| 瑜伽裤透明全毛露丁字裤| 欧美精品青青久久久久久久久久久 | 日韩一线二线伦理片免费观看网页| 一级特黄视频免费播放| 欧美日韩三级在线观看| 国产男女嘿咻视频在线| 中日韩产精品1卡二卡三卡| 国产大尺度无遮挡在线观看| 日韩av手机在线观看| 韩国美女精品久久久久久| 日韩免费福利一区八区| 91老师秘片黄在线观看| 国产精品老师好紧好爽最新毛片| 五月开心中文版在线观看| 国产美女白浆视频一区二区| 亚洲人成网站18岁禁止 | 亚洲AV综合A国产AV中文| 国产一级婬片免费播放电影 | 日韩欧美高清在线播放| 亚洲欧洲在线观看无码| 在线免费观看a级片| 2020日韩中文字幕| 毛片女人片毛片免费二区| 久久毛片免费一区二区三区电影 | 国产精品久久久久浪潮av| 亚洲色大全在线视频观看 | 亚洲日韩国产精品久久久综合网| 亚洲 欧洲 日韩 综合AV| 韩国激情三级做爰观看极限| 国产日韩欧美中文一区| 性欧美VIDEOFREE高清大喷水| 国产高清av大屁股免费看| 999福利精品久久久| 日本www成人网站在线观看| 亚洲一区二区一区| 欧美日产国产成人免费点| 伊人久久大香线蕉?v男同| 黄色一级视频网站| 国产精品视频毛片| 有没有免费无码h网站的| 久久久久亚洲精品免费| 国内精品久久99人妻无码特黄| 性高湖久久久久久久久| 十八禁在线免费观看| 人妻系列专区无码在线| JK白丝高中小仙女自慰| 欧美在线三级艳情网站亚洲成人99| 蜜桃色欲AV久久无码精品软件| 日韩国产精品99久久久久| 水蜜桃视频污在线观看| 久久久久中文字幕1区| 精品国产?Ⅴ一区二区三区 | 138亚洲福利视频一区二区| 亚洲黄色AV电影在线不卡| 亚洲日韩精品综合在线一区二区| 人妻一区在线播放| 一区二区毛片视频免费看 | 69国产成人精品午夜在线| a狠狠久久蜜臀婷色中文网| 成年人在线观看网站| 麻豆国产91视频| 高清国产在线日韩欧美| 亚洲国产福利精品一区二区| 宝可梦沙奈朵口吐白色液体| 亚洲午夜久久久久无码| 在线喷白浆在线视频| 嘿嘿连载下载app| 精品国产成a人片在线观看 | 在线亚洲理论午夜AV大片| 国产亚洲综合秋霞影院国产 | 杨幂喷水高潮在线观看视频| 国产一级婬片免费播放电影| 国产精品香港三级国产| 丁香婷婷深情五月丁香中文字幕| 国产中文自拍无码| 自拍欧美在线观看三级| 精品免费一区二区爱| 日本无遮挡h肉动漫在线观看| 在线亚洲理论午夜AV大片| 欧美国产第一区| AV乱码一区二区三区| 亚洲国产在人线播放午夜免费| 国产精品一二三级视频| 国产午夜福利精品理论片久久| 真实国产乱子伦对白在线播放| 少妇系列中文字幕一区| 国产精品美乳| 免费无码AV片在线观看sm| AV乱码一区二区三区| 午夜福利精品无码福利| 欧洲美女一级牲交视频| 在线免费观看国产视频| 亚洲永久免费无码打屁股| 亚洲AAA一级无费看| 久久精品亚瑟全部免费观看 | 殴州人成在线视频| 国产成人AV一区二区三区| 国产亚洲精品美女2020久久| 欧美综合在线观看日本| 国产中文在线精品一区| 國產精品99久久| 中国捆绑女裸绳艺视频| 亚洲日本欧洲综合| 日韩av在线在线观看| 亚洲人成aⅴ在线播放橙子| 一级不卡无码免费黄片| 欧美日韩国产人成在线| 亚洲a精品无码毛片色欲av| 樱花视频网站| 国产黄色在线观看.| 惠民福利黄色成人网站免费无码av| 波多野结衣电影一区二区| 午夜性爽视频男人的天堂在线| a免费在线观看| 狠狠综合久久一区二区三区| 超碰97人人天天夜夜| tobu8 天堂网www中文在线| 午夜视频成在线人成在线人 | 100款禁用黄台网站小黄鸭| 无码av高潮抽搐流白浆在线| 亚洲激情午夜视频| a毛片免费全部播放吃| 亚洲全部无码中文字幕| 国产日韩欧美精品区性色| 亚洲日韩精品人妻| 高清 无码 自拍 日韩| 99RE8国产这里只有精品| 在线亚洲欧美日韩国产| 欧美日韩精人妻品一区| 无遮挡18禁啪啪免费观看| 美女视频黄a视频全免费观看蜜臀 国产精品免费播放器大全 | 日本一区二区三区三州| 国产性欧美疯狂猛交69hd| 亚洲国产精品第一二三区| 午夜久久无码成人免费AV| 亚洲高清美女在线| 老司机午夜精品99久久免费| 久久久精品产一区二区三区日韩 | 久久毛片免费一区二区三区电影| 在线观看午夜国产精品| 日韩免费高清一级毛片久久| 18禁裸乳無遮擋啪啪無碼免費| 日韩欧美偷拍人妻丝袜第一页| 69国产成人精品午夜在线| 亚洲成人特级毛片| 免费国产自产一区二区三区四区| 久久久久av綜合網成人| 亚洲日韩国产精品久久久综合网| 手机看片精品国产福利| 国产偷窥熟女精品| 男人天堂日韩精品| 人妻日韩AV无码一区二区| 96久久自偷自偷国产精品| 亚洲a精品无码毛片色欲av| 中文字幕久久久久一区| 免费观看又色又刺激的视频| 婷婷综合六月| 国产一区二区精品久久小说| 国产午夜福利精品理论片久久 | 亚洲中文字幕乱码影院在线| 春色 都市 亚洲 小说区 | 日韩视频在线观看免费6080| 成年人在线观看网站| 亚洲国产99在线精品五区| 国产成人综合在线女婷五月99播放| 中文字幕有码不卡| 丰满熟女亚洲图片综合图区| 日韩国产精品等最新内容!| 91极品丝袜美女在线观看| 野花社区最新免费视频| 亚洲欲色欲色XXXXX在线小说| 成人a一级毛片免费看视频| k频道一区国产在线观看| 国产亚洲精品A片1000| 女人19水真多免费毛片| 日韓中文字幕無碼高清毛片| 污污视频免费网站| 男女无遮挡动态图| 成人黄片视频免费在线观看| 欧美三级直播美女视频在线观看 | 国产天堂在线一区二区三区 | 國產精品99久久| 污视频在线免费观看| 少妇太爽了在线观看视频| 精品国产成a人片在线观看| 久久精品国产AⅤ无码| 秋霞影院韩国伦片在线播放| 日韩特黄精品一在线看| 天天被干免费观看视频| 亚洲色欧美日韩在线影院| 日本美国一级大片| 96久久自偷自偷国产精品| 一级黄色片免费观看| 欧美成人午夜影院| 国产精品国产亚精品不卡| 国产特级全黄一级97毛片电影| 免费国产自产一区二区三区四区| 国产小视频一区二区三区中文字幕在线播放 | 青草影院内射中出高潮 | 最近最新中文字幕2018| 又大又粗又爽国产色欲AV| 亚洲中文字幕一区二区不卡国产 | 日本加勒比麻豆亚洲精品| 丝袜美足国产一区在线| 99精品亚洲国产精品| 在线观看无码高清aaa| 1区3区4区产品乱入视频| 亚洲日韩AV无码中文| 日韩精品一区二区亚洲A ∨| 亚洲黄片账号免费| 亚洲中出中文字幕日本| 一区二区三区av免费| 欧美在线免费亚洲| 中文字幕AV二区| 亚洲日韩AV无码中文| 国产精品亚洲日韩高清资源| 国产中文亚洲熟女曰韩| 国产av自拍播放| 国产无遮挡裸体免费视频| 999福利精品久久久| 99精品欧美一区二区蜜桃美图| 久久综合九色综合欧美婷婷| a免费在线观看| 久久免费视频777| 精品久久久久免费免费自慰| 婷婷精品国产?v麻豆不片| 在ktv上班被客人吃奶头| 日本中文精品在线观看| 亚洲欧洲国产精品香蕉网| 老司机带带我精品视频| 看片免费亚洲国产视频大片| a级高清毛片视频免费观看| 国产乱妇乱子视频在线观看免费| 麻豆国产精品VA白浆| 亚洲成AV人手机在线观看网站 | 肛交的免费视频91视频| 91免费入口在线观看| 女人用炮机高潮合集视频播放| 欧美日韩电影码国产| 一本久久a久久精品∨r综合| 成人女人在线观看| 亚洲在AV极品无码天堂| 亚洲综合男人的天堂色婷婷| 性白俄罗斯高清xxxxx| 好紧好湿好爽免费视频美女做| 精品国产伦一区二区三区在唱戏| 2021国产高清自在线拍| 精品手机在线| 日韩A∨无码综合久久五月| 国产午夜一区二区在线观看m| 在线免费观看国产视频| 国产人妻高清国产拍精品| 中国熟妇乱子hdsex粗| 日韩床上特黄一级片| 1024手机在线看片| 久蕉在线视频免费精品| 亚洲欧美日韩中文高清| 日韩国产欧美日韩一区二区久久| 亚洲欧美一区二区三区69| 惠民福利黄色成人网站免费无码av| 丰满熟女亚洲图片综合图区| 夜色www中国精品视频网站| 国产精品无码久久AV嫩| 国产亚洲欧美ai在线看片| 韩国三级电影久久久| 丰满多毛xXXⅩ精品视频| 欧美日韩精品区久久久| 污污视频免费网站| mmuu55首页 日本系列| 在线观看国产一区二区三区| 日韩色欲人妻无码精品av| av在线免费观看高清| 国产真实深喉口爆吞精视频| a级毛片高清免费视频在线| 色综合精品视频在线| 99精品無碼人妻一區二區三區| 超碰在线99免费在线不卡| 超碰成人免费观看在线| 无码日韩做暖暖大全免费| 日韩精品手机在线| 日韩特黄精品一在线看| 99爱免费视频在线观看禁| 亚洲 欧洲 日产 专区| 久久草福利视频国产| 97人妻人人揉人人躁人人爽动漫| 国产欧美日韩视频一区在线观看| 日本一区二区三区三州| 亚洲精品视频一区二区| 污污视频免费网站| 91精品无码专区免费| 国产日韩欧美一区二区四区| 国内一区二区三免费视频| 中文人妻久久| 国产福利 在线播放| av无码三级片在线播放| 永久免费观看啪啪网站欧美| 亚州中文字幕| 日本免码va在线看| 伊人久久大香線蕉AV五月天| 超碰成人免费观看在线| 91香蕉视频国产免费下载| 日韩欧美在线观看一区二区三区| 六十老妇性大啊使劲| 97人妻人人揉人人躁人人爽动漫| 一本久久a久久精品免费不| 欧美三级日韩国产在线观看| 亚洲av美女在线播放啊| 无码粉嫩小泬久久久| 制服丝袜美腿 AV影院| 亚洲精品高清你懂的| 大家都能看的免费毛片视频| 国产成a人亚洲精v| 日本三级久久| 色小说色网视频| 思思热这里只有精品5| 99精品一区二区无码吞精视频| 欧美性爱激情| 大乳爆乳无码一区二区三区| 日本黄线在线视频免费看| 国产精品羞羞答答| 亚洲av福利天堂在线观看| 欧美成人专区| 又黄又爽又硬网站| 日本3p视频在线看高清| 久久影院午夜未满十八勿入 | 91在线无码精品秘比基尼| 国产美女性爱亚洲性爱在线观看| 欧美日韩国产人成在线| 亚洲另类无码一区二区三区冫| 澳门l永久无码视频| 亚洲在AV极品无码天堂| 成人黄片视频免费在线观看| 黄片软件免费下| 精品无码久久久久国产| 二级黄色录像片免费播放| 一区二区三区四区在线免费观看| ass日本丰满熟妇pics| 日产一级毛片免费| 日本加勒比麻豆亚洲精品| 人妻久久系列精品| 欧洲另类综合| 日韩欧群交p片内射中文| 高清 无码 自拍 日韩| 绯色AV视频精品一区二区 | 99久久免费只有精品国产在| 谁有操逼毛片网站| 亞洲歐美日韓中文字幕首頁| 午夜精品一区二区三区成人| 国产第一自拍| 久久高清综合免费| 中国女人内谢25xxxxx| 国产一线在线观看| 色欲久久国产色av免费看老司 | 亚洲精品私拍国产福利88| 亚洲色图国产无码| 91精品国产高潮久久久久| 国产精品小姐久久久久久| 国产亚洲桃色| 快描人成app免费| 最近在线中文字幕更新| 国产真实迷奷系列在线看| 亚洲成人激情在线观看| 亚洲?v无码国产精品色午夜| 18款禁用安装的漫画软件| 久久久人妻无码一区二区三区| 国产免费女明星色视频| 日本高清免费中文字幕区dd| 男女做爰大粗舒服小说| 亚洲欧洲AVAV天堂系列| 亚洲av成人片无码网站动画| 日产精品一二三区| 欧美日韩在线精品激情福利综合 | 91老师秘片黄在线观看| 日韩一线二线伦理片免费观看网页| 亞洲國產歐美在線觀看| 免费观看丰满少妇一级毛片| 日韩偷拍一区二区三区| av日韩在线观看一区二区三区| 日本午夜在线视频| 国自产拍在线亚洲网站| 日韩在线精品一二三区| 国产av网站高跟丝袜| 大黑人交xxxx大黑人交野外| 国产曰韩ai一区二区三区| 熟妇av日韩不卡| 欧美日韩在线二区下载| 羞羞视频APP下载网站| 亚洲午夜AV无码成人福利| 九九在线观看高清免费| 国产成人69天堂| 欧美日韩成人精品第一区| 五月天婷五月天综合网 欧美片区| 有没有试过一前一后两个人| 精品人妻挤奶一二三四区| 大香蕉久久综合在| 国产成人av大片大片在线播放| 中文字幕日本a√在线| 亚洲欧美日韩国产一区在线| 国产超级无码一极毛片| 日韩av在线在线观看| 国产免费福利片在线视频| 国产一级婬A片AAA毛片| 鲁丝片一区二区在线观看| dddd亚洲日韩欧美精油| 精品国产91无码大片在线观看| k频道一区国产在线观看| 亚洲av成人在线观看| 天美传媒国产精品果冻| 精品吹潮在线播放日韩| 一区二区放荡亚洲人妇| 人成在线免费观看亚洲| 日产一区二区三区精品视频| 国内真实刺激对白自拍视频| 日韩精品一区国产偷窥在线| 最新av网站网址免费观看| 在线亚洲无码| 国产精品66婷婷伊人五月| 亚洲av中文aⅤ无码av电影| 人妻中文字幕一区二区不卡 | 亚洲精品国产导航一区二区| 欧美色图一区二区| 国产亚洲欧洲无码激情在线观看| 久久精品99无色码中文字幕| 日韩欧美在线观看一区二区三区| old老太videos老妇中国| 国语对白刺激真实精品| jizz狼友国产高清交流a| av资源久久免费下载| 欧美中文字幕在线视频| 久热这里只有国产中文精品| 精品无码作爱无码视频| 柳州少妇无码一区| 天堂成人一区二区三区av片| 日韩殴无码中文字幕| 欧美亚洲国产中文另类在线观看| 日本人69视频jizz免费看| 综合亚洲国产日韩欧美在线| 欧美日本在线不卡二区| 99尹人香蕉国产免费天天拍 | 亚洲?v无码国产精品色午夜| 亚洲成人一线二三线在线观看| 野花社区观看免费观看视频6大全| 亚洲欧美日韩a∨在线观看| 欧美成人国产精品一区二区| 国产亚洲欧洲无码激情在线观看| 日本美国一级大片| 韩国美女一级毛片| 女人18毛片18A级水真多| av日韩在线观看一区二区三区| 亚洲日本精品va中文字幕 | 国产一级黄aa爽| 精品国产AⅤ一区二区三区4区| 高潮喷水女仆流白浆| 欧美午夜久久精品另类| 国产高潮女人在线播放| 午夜在线不卡精品国产| 国产羞羞视屏在线观看| 中文字幕人妻久久精品一区二区| 亞洲A∨精品一區二區三區下載 | 日本加勒比麻豆亚洲精品| 国产福利甜味弥漫精品tv一区| 鲁大师在线手机日韩| 性国产日韩欧美一区二区在线| 成人免费毛片日韩毛片| 国产99热在线露出| 美国日本韩国精品在线| 成码无人av片在线电影软件| 波多野结衣电影一区二区| 天堂在线中文最新版地址| 国产在线看av不卡无码网站免费| 爱情岛免费视频论坛一路线| 亚洲MV国产MV在线MV综合试| 亚洲最新无码2021| 精品综合久久久久久8888| 亚洲欧美日产国产视频| 国产激情福利| 男生和女生在一起打牌的很痛的app | 国产精品丝袜亚洲熟女蜜月| 亚洲欧洲在线观看无码| 最近在线中文字幕更新| 国产性爱一级生活视频片| a免费在线观看| k频道国产网红欧美在线视频 | 欧美日韩在线二区下载| 柳州少妇无码一区| 十八禁爽爽爽无遮挡在线观看网站| 亚洲女人视在线| 国产精品看片在线| 亚洲中文字幕日韩少妇| 免费精品一区二区中文字幕 | 2019天天拍拍天天爽视频全集 | 亚洲va欧美a国产va综合| 国产精品国产三级国产午| 亚洲一区国产区羞羞视频| 先锋影音制服丝袜| 国产区成人在线观看| 久久人人爽人人爽av片| 欧美亚洲自偷自偷图片| 快描人成app免费| 无人视频免费观看免费视频| 91精品国产高清自| 国产又黄又骚又猛欧美| 巨粗进入警花哭喊求饶| 亚洲精品无码不卡在线播放HE | 一本色道無碼道dvd在線觀看| 国产福利一区99| 正在播放极品白嫩真实面试| 一本久草综合| 字幕大全网址撩人精品磁力视频二区| 日韩欧美国产不卡一区二区| 国产成人福利在线观看视频| 亚洲影库日韩久久久| 色婷婷亚洲综合五月| 亚洲欧美日韩精品专区52| 澳门精品久久国产电影| 亚洲欧洲AVAV天堂系列| 激情在线日韩欧美日韩| 在线国产视频一区二区三区| 香蕉在视频线精品视频| 今日亚洲2021在线观看| 拔萝卜视频直播下载| 精品国产你懂的在线看| 欧洲熟妇精品视频在线成视频| 草草影院欧美三级日本| 亚洲AV乱码一区二区三区| 高清人妻无码中文字幕谷本多| 国产精品九九久久九九国产| 亚洲高清美女在线| 二区三区精品| 欧美人妻精品一二三区| 18禁动漫一区二区三区| 农村少妇野外a片www| 日韩AAAA级无码专区免费| 永久免费看黄| 草草影院欧美三级日本 | 好色先生日逼的视频| 欧美大乳中文字幕在线| 色噜噜狠狠狠狠狠色综合| 国产品国语在线不卡| 加勒比在线视频频図鑑| 亚洲日本乱码在线观看| 蜜桃色欲AV久久无码精品软件| 成人高清毛片视频| 免费A级特黄片日韩精品| 车里要了好多次天天影院网| 亚洲尤物永久无码AV毛片| 日韩国产精品99久久久久| 成人丝袜18秘 视频在线观看| 色吧超碰97人妻| 少妇大胆瓣开下部自慰| 中文字幕不卡乱偷在线| 成人网免费视频色呦呦| 国产91高潮操逼视频流白浆 | 羞羞视频APP下载网站| av一av无码免费观看| 日韩欧群交p片内射中文| 亚洲电影激情五月激情| 黄到让你下面湿的视频| 日韩精品亚洲专区在线影院| 夜夜操天天爽| 俄罗斯aaaaa特级毛片| 欧美狂野视频在线精品| 91精品国产福利资源在线观看麻豆| 91在线无码精品秘比基尼| 亚洲综合精品二三区| 亚洲人妻久久无码| 伊人影院在线播放| 亚洲狼人制服中文字幕| 黄色一级视频网站| 911永久在线网站| 菠萝菠萝蜜免费影视在线观看| 亚洲一卡2卡三卡4卡127.0.0.1| 伊人丁香五月在线视频| 澳门l永久无码视频| 国产一级毛片一区二区无码| 日韩欧美精品亚洲一区二区| 亚洲中久无码永久在线观看同| 宝可梦沙奈朵口吐白色液体| 餐桌下狂c亲女高辣h文| 亚洲视频一区二区三区久久| 欧美精品久久96人妻无码| 精品久久久久免费免费自慰| 欧美亚洲少妇高清| 6080YYY午夜理论片免费| 日本中文字幕www| 老师解开乳罩喂奶我脱她内 | 草草影院欧美04一区二区三区| 97理论三级九七午夜在线观看| 品人妻VA出轨中文字幕| 国产成人剧情?v麻豆映画| 日产精品一二三四区国产亚洲| 亚洲亚洲国产精品| 久久综合综合久久?V在钱| 欧美综合高清日本| 久久久精品一区二区藌桃| 国产美女裸乳无遮挡网站| XVIDEOS免费人成视频网址 | 国产一级a毛一级a做免费高清视频| 一区二区三区无码在线| 在线亚洲欧美日韩国产| 日韩一线二线伦理片免费观看网页 | 水蜜桃视频污在线观看| 八戒影视大草原久久揄拍片 | 99久久久国产免费观看精品| 国产美女性爱亚洲性爱在线观看| 欧美日韩成人精品第一区| 美女任你摸免费视频| 最新欧洲日韩在线播放| 国产在线一区二区三区乱码| 国产盗摄精品一区二区酒店等| 国产精品中文一区二区三区| 国产十五十八娇小摘花| 91成人午夜福利在线观看国产| 国产一级a毛一级a看免费视频国产suv精品一区二区6 | 国产国产成人久久精品杨幂| 男女做爰猛烈吃奶吃出乳液| 在线看片免费视频国产五月天| 在线观看无码高清aaa| 欧美老熟妇夜夜爽| 国产精品自产拍在线18禁| 妓女精品一区二区| 国产亚洲加勒比久久精品| 97一区二区在线播放| 網友分享国产一区精品在线心得| 日韩色欲人妻无码精品av| 一区二区三区人妻免费视频| 国产黄片大全| 丰满熟女亚洲图片综合图区| 国产成人综合影视| 日韩色欲人妻无码精品av| 99精品欧美一区二区蜜桃美图| 看片免费亚洲国产视频大片| 精子射入几天可以着床| 成人午夜福利小视频| 国产成人av国语在线| 午夜精品人成在线观看| 成人久久久一区二区| 成人网免费视频色呦呦| 日韩一线二线伦理片免费观看网页| 欧美性受XXXX黑人猛交视频| 亚洲另类无码一区二区三区冫| 日本一区二区三区作爱视频| 自偷自偷自亚洲首页精品| 久久综合第一页无码97| 精品国产v无码大片在| 一级理论片免费观看在线| 99精品無碼人妻一區二區三區| 国产精品无码久久AV嫩| 91亚洲色欲国色天香| 夫の目の前侵犯新婚人妻| 好大好硬好深好爽视频h| 秋霞在线手机国产在线| 国产免费一级视频播放| 色婷婷国产精品欧美毛片 | 97人人超人人超碰超国产| 国产成人欧美综合在线观看| 欧美中文日韩综合在线视频| 97久久久精品综合88久久| 午夜在线不卡精品国产| 激情丝袜美女视频1区| 人妻少妇蜜桃一区二区| 国产91对白在线播放边| 午夜亚洲国产理论片2020| 歐美成人久久久| 午夜免费福利av| 看中国免费毛片视频| 国产精品色片免费| 亚洲欧美精品免费观看| 伊人查蕉在线综合| 日本人妻最新在线中| 97视频人人做人人爱免费体验 | 国产男女嘿咻视频在线| 99精品视频免费在线观看| 亚洲日本乱码在线观看| 网红久久精品一区二区| 国产盗摄精品一区二区酒店等| 精品免费在线欧美| 亚洲精品成人一二三区| 亚洲精品无码av国模| 青青草国产成人久久网| 91久久精品日本一区| 亚洲国产小u女在线| 成人毛片免费aa级| 国产成 人 亚洲 综合| 三级在线观看mmm| 国产一区二区三区精品高清| av高清理伦片在线观看| 免费在线播放无码黄色片| 91无码偷拍精品一区二区三区| 狠狠色狠狠色綜合久久第一次| 茄子成年app在线观看| 狠狠躁狠狠躁东京热无码| 国产精品久久成年人免费视频| 手机看片精品国产福利| 一级黄片免费1999| 国产精品欧洲激情无码AV在线| hezyo加勒比在线综合| 日韩精品一区二区亚洲A ∨| 免费真人一对一视频| 韩国无码在线| 日本少妇一级婬片HD69网站| 午夜精品九九九九99蜜桃| 字幕大全网址撩人精品磁力视频二区| 欧美一区二区三区免费观看视频互動交流| 黄色av网页地址一| 国产三级片在线观看网站| 亚洲精品视频一区二区| 日本www成人网站在线观看| 91丨九色丨蝌蚪3p| 一本久久a久久精品∨r综合| 久久久久国色aV免费软件| 父子1v2她还是你的小心肝| 在线一级国产大片| 91在线无码精品秘比基尼| 久久精品无码亚日韩免费影视观看中文 | 中文字幕有码不卡| 免费综合日本中文| 国产福利影视一二三区导航| 又色又爽又硬又刺激的视频| 999福利精品久久久| 亚洲视频一区二区三区久久| 亚洲成熟妞人婬i片在线观看| 亚洲 自拍 露出 极品| 人妻出差精油按摩被中出| 一本色道久久88加勒比—综| 91成人豆奶视频在线| 中文精品影视日本| 免费成人三级电影在线观看| 一级在线中文观看日韩| 又色又爽又硬又刺激的视频| 成码无人av片在线电影软件| 抖音成人版短视频| 一区二区三区无码在线| 日本无码一区AⅤ二三区超碰 | 精品国产午夜肉伦伦影院| 亚洲欧美日产国产视频| 99久国产久精品视频| 亚洲人成人一区在线观看| 国产香蕉成人综合精品视频| 精品综合久久久久久8888| 成人AV无码国产在线观看动漫| 狠狠躁狠狠躁东京热无码| 菠萝菠萝蜜免费影视在线观看| 亚洲精品手机在线视频| 国产露脸无码a区久久蘑菇| 欧洲亚洲激情TV中文字幕| 亚洲高清国产拍精品青青草原| 91久久久韩系亚洲| 久久五月一区二区精品| 国产精品小姐久久久久久| √天堂中文官网8在线| 狼友久久国产精品| 日韩一区二区三区在线看| 日韩午夜不卡在线看| a级毛片无码真人版| 成人AV无码国产在线观看动漫| 夜夜爽天天躁夜夜躁狠狠| 欧美日韩中字在线 | 在线观看精品一区二区三区 | 扒开老女人p大荫蒂warmth| 国产精品中文一区二区三区| 国产一区二区丝袜女高跟鞋| 精品国产亚洲人成在线传媒 | 国产亚洲h网综合h网久久| 人妻出差精油按摩被中出| 久久精品欧美| 国产成人真人片亚洲精品不卡| 天堂网www天堂在线资源| 免费A级特黄片日韩精品| 欧美精品日韩精品在线| 在车里被弄了4次高潮| 91亚洲黄色在线看| 十八禁爽爽爽无遮挡在线观看网站 | 瑜伽裤透明全毛露丁字裤| 车子越颠进入的更深h| 淫荡人妻在线视频| 成人高清影院| 蜜臀98精品國產免費觀看| 国产一级二级三级免费| 日本强伦姧人妻完视频正版| 黑人巨茎大战俄罗斯白人美女| 榴莲APP下载汅网站进入官网| 视频福利一区二区三区| 国产精品羞羞答答| 日韩国产欧美一区免费观看| 少妇太爽了在线观看视频| 国产精品厕所偷窥盗摄av| 桃子视频APP在线下载污| 日本高潮少妇一区二区三区| 国产三级片大全网| 国产精品电影不卡无码| jizz成熟丰满老女人| 射射射天天射| 羞羞漫画免费在线看| 国产农民工简易窝棚嫖妓精彩对白| 欧美成人在线视频在线| a毛片免费全部播放吃| 午夜性爽视频男人的天堂在线| 久久综合网欧美色妞网| 三级在线看中文字幕完整版| 国产成人精品影院网站不卡| 精品亚洲精品在线观看| 99天天操天天做天天| 影音先锋+高潮+痉挛| 99爱免费视频在线观看禁| 日韩高清一区二区第50页 | 色午夜天香婷婷丁香| 又色又爽又硬又刺激的视频 | 小编在这里为大家带来看日韩黄色毛片| 亚洲中文字幕不卡无码| 中文字幕理论片在线高清| 精品唯美系列最新在线视频| 91精品无码专区免费| 国产福利精品在线| 91短视频在线观看污污污| 1024在线看片你懂的| 91成人精品亚洲高清在线观看| 国内高清A自拍视频| 2014AV天堂无码一区| 国产麻豆精品成人毛片| 在厨房拨开内裤进入在线视频| 亚洲欧美日韩中文高清| 男女做爱视频在线观看| 欧美大尺度禁片露器官电影观看| 人妻久久系列精品| 又黄无遮挡无码的免费视频| 亚洲天堂久久精品9966| 丰满少妇强烈进入高清视频| 中文字幕乱码亚洲v日本| 三级在线免费a免费看| 视频福利一区二区三区| 日韩无码一区二区高清视频| 免费精品一区二区中文字幕| 久久精品人妻一区二区三区一| 亚洲国产午夜精品一区二区| 鲁丝片一区二区在线观看| 越南女子杂交内射BBWBBW| 国产成人午夜一级电影在线| 最新全集网电影免费在线看| 六十老妇性大啊使劲| 在线观看无码三级少妇| 亚洲国产小u女在线| 国产午夜精品草莓一区二区三区 | 特级无码毛片在线观看| 18禁裸乳無遮擋啪啪無碼免費| av资源久久免费下载| 69式真人无码视频免费| 黑人粗大区一区二视频| 99久久久国产免费观看精品| 成人无码视频在线一区| 日本午夜色噜噜| 后入式肏大屁股眼免费视频| 97久久一精品人妻人人玩| 国产乱婬AV麻豆剧传媒牛牛影视| yw尤物久久国产综合| ass日本丰满熟妇pics| 日本午夜色噜噜| 天美麻花果冻女演员表| 一级免费十八岁无毛毛片视频| 18进黄址app最新版| 少妇白浆一区二区| 下载强漫画人物软件| 国产50部艳色禁片无码国产麻豆精品一区二区三区 | 亚洲午夜福利精品一区| 日本不卡免费新一二三区3| 国产乱人伦偷精品视频???| 久久精品2021国产| 中国毛片在线观看| 精品视频卡1卡2卡3| 亚洲色欲或高潮影院伊人| 在线观看麻豆| 亚洲无码三级片影院免费观看| 日本美国一级大片| 国产精品看片在线| 中国熟妇色欧美老妇多毛| 图片区电影区激情区小说区 | 久久精品日产第一区高清版| 亚洲图片视频欧美日韩| 久久久人妻无码一区二区三区| 亚成人欧美在线观| 久久久久中文字幕1区| 四虎国产精品永久在线无码首页| 欧美日韩字幕一区| yw尤物久久国产综合| 国产高清永久免费| 韩国无码在线| 成码无人av片在线电影软件| 精品妇人妻视在线视频| 焯逼国产精品| 尤物波多野结依无码大黄片| 91好色先生下载污| 日韓歐美一區二區三區不卡| 亚洲日本一区亚洲影院| 色欲?ⅴ精品一区二区三区四区| 亚i洲成色在线综合网站| 亚洲一级午夜福利| 黄色a级视频免费播放| 日韩国产欧美日韩一区二区久久| 91成人午夜福利在线观看国产| 欧美在线三级艳情网站亚洲成人99| 最新久久高清精品| 亚洲欧美一区二区三区69| 国产一线在线观看| 欧美日韩主播国产视频| 欧美激情在线播放一区二区 | 欧美人成一本免费观看视频| 亚洲日韩制服另类| 国产丰满老女人A片免费观看| 黑人和少妇冒白浆了| 91好色先生下载污| 美女乳头阴道搞鸡巴视频| 电影天堂免费在线观看| 亚洲成a∨人片在线观看无码好看 蜜臀久久精品国产亚洲av | 久久精品国产亚洲av天美18| 偷拍亚洲综合二区| 欧美一级高清费一级a| 亚洲欧美自拍唯美另类| 无码一级午夜福利区久久浪潮av| 天天噜夜夜噜狠狠噜| 午夜亚洲亚洲精品福利| 亚洲中文字幕一区二区不卡国产| 中文字幕有码无码人妻?V蜜桃| 入禽太深在线色网视频5| 欧美猛少妇色xxxx久久久久| 亚洲婷婷影院女优视频网站| 国产日韩欧美精品区性色| 日本免费一区二区三区看片 | 亚洲天堂久久精品9966| 日韩精品一级一区| 国产精品电影不卡无码| 久久综合成人精品亚洲另类欧美| 私人影院午夜在线观看| 国产小视频一区二区三区中文字幕在线播放 | 日产精品一二三四区国产亚洲| 国产精品中文一区二区三区| 亚洲一区二区麻豆AV| 99RE6国产精品99RE在线| 辣妹子影院电视剧免费播放视频大全在线观看 | 亚洲国产99在线精品五区| 在ktv上班被客人吃奶头 | 欧美日韩高清不卡一区| 91成人精品亚洲高清在线观看| 国产一二一成人观看| 日韩欧美高清在线播放| 国产情侣实拍在线播放| 女性喷液过免费视频| 激情依依av男人的天堂| 高潮喷水女仆流白浆| 日韓三級免費看| 变态骚女玩男人在线免费观看| 另类亚洲欧美精品综合| 日本黄线在线视频免费看| 日本成a人片在线观看网站| 2020日韩中文字幕| 亚洲色图一区二区的| 在线三级网址| 午夜国产一级大片免费观看| 午夜最新电影| 亞洲一區二區三區免費觀看| 精品国产91无码大片在线观看| 中文字幕無碼亂碼人妻系列蜜桃 | 秋霞电影伦理手机版| 国产又黄又骚又猛欧美| 韩国电影密爱在线观看| 双性调教结婚每日淫训| 欧美日产国产成人免费点| 视频福利一区二区三区| 国产又黄又骚又猛欧美| 国产精品一区二区久久国产抖音| 久久艹这里只有精品| 日本丰满护士bbw| 他一边曰一边吃我奶头| (愛妃)久久AV无码精品人妻出轨| 色欲?ⅴ精品一区二区三区四区| 497799欧洲版的国产suv| 另类小说图片区日本久久大视频| 高清av中文字幕无码| 在线免费观看a级片| 日韩AAA久久蜜桃AV| 精品一区二区三区国产日韩 | 亚洲一区二区三区av黄片| 欧美在线激情性受内射不卡在线观看| 亚洲精品夜夜夜夜夜夜| 亚洲国内精品久久久久电影院| 综合色久七七综合七七网站| 久久久888精品视频| 97久久精品免费公开| 国产精品青青草原免费无码中国| 日韩殴无码中文字幕| 国产羞羞视屏在线观看| 日韩视频在线观看免费6080| 日韩特黄精品一在线看| 国产成人剧情?v麻豆映画| 午夜视频成在线人成在线人| 精品亚洲精品在线观看| 网页在线观看无码高清| 一级黄片免费1999| 在厨房拨开内裤进入在线视频| 欧美日本韩国在线视频| 一级?性色生活片毛片| 91香蕉视频在线观看分享的内容是很丰富的 | 永久无码日韩a片免费看蜜臀| 色婷婷综合激情蜜桃tv| 亚洲精品一区二区三区不| 国产麻豆成人传媒免费观看 | 一级a爱片国产亚洲精品| 亚洲精品视频中的话| 久久图片视频小说| 国产第一页草草影院ccyy| 久久免费看少妇高潮XXX| 亚洲高清无码操逼视频| 国产精品美乳| 日产棈品一区到六区免费| 久久九九日本韩国精品| 国产簧片免费在线播放| 四虎在线最新地址99| 女人毛片免费看一分钟| 插我一区二区在线观看| 欧洲精品aaa一区二区| 免费看美女无遮掩的软件| 欧美一级高清首页蜜桃| 538pro精品视频我们不只是| 一区二区三区午夜片| 欧美激情一区精品| 日韩精品 欧美 制服丝袜| 码 码加勒比国产在线| 免费在线亚洲| chinese熟妇老女人hd视频| 1024大香蕉手机看片| 精性国产在线视频| 中国幻女free性zozo交体内谢| 中文字幕精品三级视频| 成人AV无码国产在线观看动漫| 亚洲MV国产MV在线MV综合试| 国产亚洲精品精品在线精品| 在线免费观看国产视频| 国产精品???a片在线观看原神| 国产午夜福利红色一片精品| 完整版av片永久免费| 欧美亚洲少妇日本| 午夜视频成在线人成在线人| 作爱激烈叫床视频| 日本精品在线免费观看| 国产精品美女白丝自慰| 中文精品影视日本| 激情影院免费视频试看| 亚洲爆乳av一区二区三区| 538pro精品视频我们不只是| 久久久精品2019中文字幕超碰| 国产麻豆精品成人毛片| 午夜男女后插入在线免费| 亚洲MV国产MV在线MV综合试| 在线播放亚洲黄片| 无码熟妇一区二区| 免费日韩视频| 日韩欧美女破处视频免费观赏| 99精品一区二区无码吞精视频| 日韩免费无码| 无码人妻侵犯一区侵犯| 水蜜桃视频污在线观看| 日韩三级久久| 九九九国产在现视频| 亞洲A∨精品一區二區三區下載| 国产激烈刺激网站免费观看| 国产精品 福利 在线| 91精品国产高清一区二区三密臀| 凹凸在线一区二区三区熟妇| aⅴ色窝窝男女爽爽a片| 亚洲无码日韩精选中文字幕| 国产另类欧美自拍日韩综合| 日韩免费无码| 18禁黄网站禁片无遮挡观看APP免费| 国产亚洲精品系列| 亚洲av美女在线播放啊| 午夜色a大片在线观看免费| 全免费a级毛片免费| 亚洲人妻久久无码| 一区二区人人在线| 国产精品日产精品久久| 玩弄熟睡的小男生腐h| 91精品手机国产在线GIF图片| 午夜男女后插入在线免费| 国产精品.久久久| 亚洲丝袜在线观看| 东京热无码一区| 高清国产在线观看| 一级做a爰片久久毛片潮喷无码 | 五月婷婷丁香综合| 狼人一区二区精品久久| 夜鲁夜鲁夜鲁高清免费看| 国产在线观看91精品| 国产精品二区三区四区| 亚洲国产的精品太乱码一区二区| 久久偷拍视频SPA| 欧美成人aa久久狼窝五月| 亚洲国产激情一区在线| 国产超碰97老师人人看| 久久免费视频8| 成人国产欧美日本精品久久麻豆 | 色呦呦网站免费| 91久久久韩系亚洲| 亞洲歐美偷拍另類| 搡女人真爽免费视频人成午夜| 日本3p视频在线看高清| 囯产精品99久久一区二区三区| 99尹人香蕉国产免费天天拍 | 免费国产成人午夜在线观看| 国产视频亚洲精品| 国产精品国产欧美综合一区| 国产麻豆精品成人毛片| 国产真实迷奷系列在线看| 午夜男女后插入在线免费| 欧美午夜久久精品另类| 中文字幕无码乱人妻| 美女内射口爆av在线| 成人看片黄在线观看| 一级黄色毛片在观看| 在线看片免费视频国产五月天| 精品亚洲国产成人无码| 看中国免费毛片视频| 污网站免费观看污网站| 亚洲国产精品成人一区二区小说| 黄色电影免费在线| 91久久久久久国产免费| 日韩国产欧美中文字幕在线播放| 色影音先锋色资源网站| 野花社区最新免费视频| 99尹人香蕉国产免费天天拍| 免费+无码+国产www| 肛交的免费视频91视频| 另类亚洲欧美精品综合| 亚洲一品二品三品精区网站| 亚洲AV无码乱码忘忧草亚洲 | ass日本丰满熟妇pics| 日韩成人手机午夜在线播放网站| 又大又黄又粗高潮免费看| 人妻夜夜爽天天爽4区| 亚洲爆乳av一区二区三区| 日本一区二区三区三州| 亚洲欧洲AVAV天堂系列| 久久综合九色综合欧美婷婷| 91成人豆奶视频在线| 最新欧美一区二区不卡视频| 国产福利 在线播放| 午夜精品人成在线观看| 午夜精品一区二区三区在线成人 | 精品人妻中文无码久热丝袜| 国产天堂网www在线资源av网| 亚洲欧美伊人久久| 国产美女性爱亚洲性爱在线观看| 日韩精品中文字字幕有码专区| 日韩AV无码一区二区三区不卡开心久久婷婷综合中文字幕 | 一本久道久久综合网| 麻豆国产一区二区在线观看| aⅴ色窝窝男女爽爽a片| 亚洲中文字幕不卡无码| 国产精品欲AV麻豆网站| 日韩国产欧美日韩一区二区久久| 少妇中文字幕久久精品无码| 日本天堂成人在线视频| 亚洲精品手机在线视频 | 亚洲AAA一级无费看| jizz狼友国产高清交流a| 欧美嘿咻嘿咻视频免费| 日本高清免费中文字幕区dd| 日韩在线精品一二三区| 欧美色图一区二区| 中文少妇无码影视| 正在播放极品白嫩真实面试| 日韩毛片午夜在线观看| 亚洲欧美日韩另类色图| 在线免费观看视频a| 日韩精品毛片无码一区| 亚洲自拍偷拍午夜福利| 国产香蕉久久精品免费| 四虎sihu新版影院亞洲精品| 肉色丝袜超薄一区二区三区| 久久精品αⅴ无码中文字字幕不卡| 中美日韩三级毛片免费观看| 免费精品无码成人片在线观看| 自拍影视无码免费| 福利午夜伦理影院| 久久九九日本韩国精品| 国产日韩欧美精品区性色| 欧美在线三级艳情网站亚洲成人99 | 天天操天天曰| 91伊人久久大香线蕉网站| 蜜臀aⅴ永久无码一区二区| 国产一级婬片免费播放电影| xxxx黄色网站在线观看| 午夜福利精品视频| 女生奖励自己隐私越狠越安全好| 九九爱WWW无码人成| 精品一区二区性爱| 樱花视频网站| 国产成人合集在线播放| 国产盗摄精品一区二区酒店等 | 国产精品久久成年人免费视频| 亚洲美女在线免费视频| 青青草原免费在线观看| 日韩在线视频高清| 最近免费MV在线观看| a级毛片无码真人版| 国产91作品一区在线观看| hezyo加勒比在线综合| 日本中文精品在线观看| 邻居少妇人妻互换| 小视频播放亚洲欧美| 欧美激情aⅴ精品一区二区高清 | 亚洲黄片账号免费| 国产91黑人在线| 亚洲精品成人一二三区| 成人精品aaa亚洲丝袜在线观看| 一级做a爱片高潮毛片| hezyo加勒比在线综合| 亚洲AV无码乱码忘忧草亚洲| 日韩免费福利剧场| 精品国产?Ⅴ一区二区三区| 免费A级毛卡片不收费视频| 亚洲一级a无码毛片中文国产| 国产高清av大屁股免费看| 插我一区二区在线观看| 日韩久久精品一区二区| 国产成人AV一区二区三区| 少妇的丰满3中文字幕电影| 人妻中文字幕无碼在线| 午夜福利在线观看不卡| 国产亚洲精品A片1000| 久久青青草原精品国产APP| 亚洲a精品无码毛片色欲av| 一级理论片免费观看在线| 国产精品白丝久久久| 亚洲图片视频欧美日韩| 精品无码人妻遭多人侵犯Av| 色天堂在线观看视频 | 大香蕉国产综合在线视频| 北条麻妃青青久久av| 鲁大师视频在线观看免费播放| yy111111少妇影院无码光屁股| 国产啪嗒啪嗒无遮美女视频| 白洁老师国产麻豆片| tobu8 天堂网www中文在线| av蓝导航精品导航| 1024手机在线看片| 精品久久久久久无码福利片| 欧美日韩在线视频h| 日韩国产亚洲欧美有码| 妓女网一区二区| 女人被男人桶| 无码专区 免费在线| 亚洲午夜精品第一区二区| 精品国产?Ⅴ一区二区三区 | 欧美日韩最新精品一二区热热| 在线观看国产一区二区三区 | 在线观看午夜国产精品| 久久156精品视频| 国产精品久久秘 A级| 国产av最新网址| 日本一区二区三区作爱视频| 国产成人真人片亚洲精品不卡| 亚洲日本精品va中文字幕| 综合欧美在线观看少妇| 亚洲一级av无码中文字幕| 蘑菇成品人app下载| 小编在这里为大家带来看日韩黄色毛片 | 亚洲欧美日韩免费在线播放| 亚洲欧美精品免费观看| 国产在线高清无码视频| 日韩国产欧美中文字幕在线播放| 99国内精品久久久久久| 欧美日韩电影码国产| 桃子视频APP在线下载污| 成人限制第一页| 亚洲人成网址在线观看| 91伊人久久大香线蕉网站| 日韩精品一区二区亚洲A ∨| 亚洲人妻精品综合无码专区| 四虎国产在线| 国产高清不卡免费在线观看| 毛片一区在线播放| 亚洲αv无码不卡一区二区三区| 男人和女人一起打扑克牌差差差痛游戏| 国产乱婬AV麻豆剧传媒牛牛影视| 青青青国产免费手机视频在线观看| 欧美疯狂性受xxxxx另类| 日本在线一级| 成人国产精品视频| 精品久久久久免费免费自慰| 黄人成a动漫片免费网站| 欧美一区日本二区| 最新欧美极品一区二区三区| 亚洲熟女诱惑一区二区| 亚洲精品欧美综合久久| 污软件在线观看软件| 午夜精品九九九九99蜜桃| 国产成人综合亚洲国产vr| 欧美亚洲日韩国产中文在线| 日韩产品和欧美产品的区别| 国产尤物A∨尤物在线观看| 日韩精品成人蜜桃| 老师解开乳罩喂奶我脱她内| 国内精品久久99人妻无码特黄| 欧美韩国亚洲精品综合a| 欧美一级黄色免费在线观看视频| 大粗鸡巴久久久久| 四川丰满少妇被弄到高潮| 黑人巨大无码系列在线| 国产91在线中文字幕无码| 欧美日本成人免费| 成人久久久一区二区| 亚洲欧美精品日韩片| 97人人超人人超碰超国产| 中文字幕一本久久综合| 日韩AAAA级无码专区免费| 日韩殴无码中文字幕| 日本中文字幕www| 粉色视频免费观看下载| 黄色AAA大片免费| 国产乱人视频在线免费观看| 国产一级久久女人毛片| 国产综合内射日韩久| 男女做爰猛烈吃奶吃出乳液| 国语对白国产精品一区| 在线综合亚洲欧美成人影院| 99re8免费视频精品全部| 宝可梦沙奈朵口吐白色液体 | 久久久久久无码精品国产小说| 高清国产在线观看| 成人国产一区| 野花社区观看免费观看视频6大全| 亚洲一日韩中文字暮AV| 惠民福利黄色成人网站免费无码av | 欧美三级电影天堂| 黄色一级视频网站| 日韩 一国产一无码一日韩| 免费国产成人无码学生妹| 中文字幕欧美精品日韩在线| 日韩国产欧美一区免费观看| 亚洲综合另类色区色偷偷TXT| 国产乱码人妻一区二区三区| 日本人69视频jizz免费看| 亚洲精品一区二区三区不| 欧美激情一区精品| 亚洲色图中文在线| 国产特黄a三级三级三级| 欧美猛少妇色xxxx久久久久| 男人你懂的在线观看视频| 亚洲国产午夜电影在线观看| 中文字幕电影一区在线观看| 亚洲欧美日韩国产精品中文字幕| 精品亚洲国产aⅴ在线| 成人无码av一区二区三区| 99re8免费视频精品全部| 亚洲一区二区精品久久av女优| 亚洲日韩av一区久久精品| 欧美A级毛片免费播敢| 手机在线看片亚洲一区| 亚洲AV片在线观看高清小说| 国产精品亚洲欧美—级久久精品 | 青青草无码精品伊人久久网站| 欲乱人妻少妇邻居+毛片| 熟妇人妻av中文字幕老熟妇| 欧美日韩国产精品动漫精品| 91xav在线免费观看| 扒开老女人p大荫蒂warmth| 国产精品玖玖玖玖影院| 久久久久久久久久久国产| 国产成人av麻豆精品| 国产三级片大全网| 973午夜伦伦电影论片| 今日亚洲2021在线观看| 看全色黄大色大片免费久黄久| 天天干天天肏| 成人AV无码国产在线观看动漫| 国产中文在线精品一区| 人妻中文字幕专区| 午夜精品成人一区二区三区| 中文字幕久久久久一区| 日韩av中文无码人妻无码| 精品免费在线欧美| 国产美女白浆视频一区二区| 久久成人精品免费国产片| 日韩成人精品视频自拍| 日韩三级片免费观看| 中文字幕精品三级视频| 大粗鸡巴久久久久| 午夜激情无码| 国产一区二区三区在线观看色网站 | 国产又粗又大又硬又爽免费视频 | 大学生一级毛片全黄真无码| 国产高清色高清在线观看九在线视频| 疯狂做受ⅩXXX高潮欧美| 狠狠干2017欧美最新| 91免费入口在线观看| 澳门l永久无码视频| 国产又粗又大又硬又爽免费视频| 秋霞影院韩国伦片在线播放| 老子影院午夜伦手机不卡无码| 国产天堂网www在线资源av网| 国产成人av一区二区三区中文精品| 精品在线欧美一区二区| 具有黄桃视频在线观看高清免费| 国产精品欧美久久久无广告| 被男狂揉吃奶胸高潮视频在线观看| 国产成人剧情Av麻豆嘿嘿| 色小说色网视频| 极品精品伊人国产| 亚洲日韩av免费在线观看| 淫荡人妻在线视频| 在线喷白浆在线视频| 国产av最新网址| 麻豆国产一区二区在线观看| 亚洲成a人无码无卡| 亚洲三级毛片在那看| 夜很鲁夜很鲁综合视频欧美| 中文字幕一区日韩无码| 中文字幕無碼亂碼人妻系列蜜桃 | 午夜精品一区二区三区国产色欲 | 国产午夜福利在线播放87| 日本人69视频jizz免费看| 96久久自偷自偷国产精品| 日韩无码高清wwww| 久久精品99毛片免费| 精品国产第一页动漫| 撕掉英语老师的黑色蕾丝内衣| 无码国产福利av私拍导航| 茄子成年app在线观看| 中文字幕無碼亂碼人妻系列蜜桃 | 羞羞视频APP下载网站| 九九热最新国产视频| 亚洲激情午夜视频| 97人人超人人超碰超国产| 亚洲国产一级精品毛一级精品看免费视频 | 在线观看AV无毒网站| 久久伊人免费视频| 99精品國產高清一區二區三區香蕉| av午夜福利一片看久久| 在线亚洲資源免費看| 看全色黄大色大片免费久黄久| 国国产精品V欧美精品∨日韩| 日韩视频 中文字幕在线看| 国产又粗又长又爽黄又硬视频| 中文字幕久久久久一区| 四川少扫搡BBW搡BBBB| 亚洲中文字幕不卡无码| 成人综合在线视频免费观看完整版| 日本人妻最新在线中| 野花日本韩国视频免费高清观看| 精品国产成a人片在线观看| 美人+妻+影音先锋| 國產午夜人做人免費視頻中文| 欧美极品jizzhd欧美仙踪林| 91精品无码专区免费| 亚洲一区二区一区| 特级做a爰片毛片免费看108| 在线一级国产大片| 国产αV无码日韩αV无码网站| 日韩成人在线视频观看苍井空| 伊人不卡字幕久久| 亚洲男男激情videos高清| 男人和女人一起打扑克牌差差差痛游戏| 国产欧美日韩激情视频一区| 成人欧美一区二区三区在线观看| 日韩欧美一区二区三区成人精品| 國產精品三級在線觀看| 一区二区人人在线| 日本丰满护士bbw| 男生和女生在一起打牌的很痛的app| 中文字幕一区二区高清精品久久久 | 一区二区三区无码在线| 久久午夜青青草原影院| 制服丝袜自拍偷拍av一区| 亚洲中文字幕丁香婷婷| 欧美精品青青久久久久久久久久久 | 欧美性爱首页| 人妻有码中文字幕在线不卡| 夜夜操综合网| 大香蕉国产综合在线视频| 97精品日韩永久性无码| 国产另类欧美自拍日韩综合| 欧美激情一区精品| 暖暖www视频免费高清最新期| 成在人线Aⅴ免费观看| 91视频污APP色版下载| 欧美中文字幕在线视频| 久久精品国产亚洲A∨未满十八| 美女裸体视频在线无卡黄色免费网站| 国产目拍亚洲精品二区婷婷| 亚洲三区欧美一区二区在线| 91香蕉视频在线观看分享的内容是很丰富的 | 好紧好湿好爽免费视频美女做| 亚洲中久无码永久在线观看同| 国产一二一成人观看| 欧美日韩成人精品第一区| 欧洲毛片自拍偷拍网站| 我的漂亮女房东完整版在线韩剧| 日日夜夜摸多人换着玩 | 欧美国产在线一区精品自拍| 嘟嘟嘟大豆行情网www| 人妻一区在线播放| 亚洲一级免费观看高清无码| 日本午夜在线视频| 亞洲Aⅴ无码乱码在线观看| 久久久久久免费播放一级毛片 | 亚洲av午夜成人片精品电影| 日韩国产亚洲欧美有码| 国产成人精品一区二三区韩国| 亚洲人成网站18岁禁止 | 国产精品欧洲激情无码AV在线| 亚洲狼人制服中文字幕| 国产成人精品在线不卡| 欧美丁香五月激情网| 欧美日本不卡一二三区| 中文字幕永久有效丝袜| 欧美在线国产一区| 91xav在线免费观看| 亚洲欲色欲色XXXXX在线小说| 第三视频午夜福利| 射射射天天射| 日本www成人网站在线观看| 91香蕉视频黄版下载| 清纯唯美欧美综合第一页| 国产无码不卡视频| 免费无码AV片在线观看sm| 国产精品AV毛片免费看观看| 久久人人爽人人爽av片| 在线视频日本亚洲| 日韩国产欧美成人综合另类| 亚洲中文字幕乱码影院在线| 497799欧洲版的国产suv| 神马午夜久久久久久| 国产av一区二区三区香焦| 焯逼国产精品| 成人亚洲欧美在线观看| 私人影院午夜在线观看| 欧美日韩国产性爱| 动漫av观看网站不卡无码| 夜夜操综合网| 免费看美女无遮掩的软件| 国产在线视频一卡| 亚洲精品手机在线视频| 农村少妇野外a片www| 天天做天天欢摸夜夜摸狠狠摸| 国产白丝喷水娇喘视频| 亚洲一区二区麻豆AV| 91久久国语露脸精品国产| 影音先锋+高潮+痉挛| 99精品又大又粗又硬少妇毛片| 韩国无码在线| 欧美一级在线高清免费观看| 国产热の有码热の无码视频| 无遮挡18禁国产精品| 夜鲁夜鲁夜鲁高清免费看| 亚洲男人天堂无码2024| 白丝乳交内射一二三区| 国产偷人视频免费观看| 中国幻女free性zozo交体内谢| 亚洲中文字幕不卡无码| av午夜福利精品一区| 亚洲精品高清你懂的| 91国自产拍在线天天更新| 欧美日韩性视频在线| 日韩AAAA级无码专区免费| 国产精品小姐久久久久久| 电车痴汉侵犯短裙人妻| 青娱乐精品视频在线免费观看| 成人综合在线视频免费观看完整版| 欧美日韩精选在线观看| 日韩免费福利剧场| 亚洲成人一线二三线在线观看| 好吊妞视频这里有精品妞干网| 欧美在线天堂视频不卡| 一级a爱片国产亚洲精品| 亚洲日本日本精品18不卡| 日韩激情一级毛片| 精品黄色国产在线观看 | 中文字幕亚洲无码色网视频| 国产另类欧美自拍日韩综合| xxxx欧美丰满大屁股| 好爽快点我受不了了视频| 国产偷窥成熟女精品视频| 国产激情在线91| 99国内精品久久久久久| 国产在线麻豆精品观看| 91成人午夜精品福利院| 九一视频免费版污| 婷婷综合六月| 国精一二二产品无人区免费应用| 免费A级特黄片日韩精品| 夜夜操综合网| 精品免费一区二区爱 | 熟女一区二区天天操夜夜操| 日韩在线欧美在线一区二区三区| 午夜福利在线免费| 亚洲欧美日韩中文高清| 亚洲美女在线免费视频| 日韩精品熟女AA久久毛片| 中文日无码在线观看| 日韩国产欧美成人综合另类| 91短视频在线观看污污污| 国产AV三级精品成人网站| 精品人妻少妇aⅴ免费狠狠| 色婷婷精品国产黑人一区二区三区 | 免费看一级a女人自慰青春网| 亚洲?V伊人久久综合密臀性色| 欧美成人国产精| 嫩草国产等最新內容| 女佣的味道hd中字在线观看| 一本久久a久久精品∨r综合| 日韩视频在线观看免费6080| 国产精品???a片在线观看原神 | 越猛烈欧美xx00动态图带声音| 久久免费看少妇高潮XXX| 午夜久久无码成人免费AV| 色秀视频在线WWW色| 亚洲天堂在线观看免费更新| 八戒影视大草原久久揄拍片| 亚洲精品肉丝袜久久| 国产精品视播放一区二区三区| 麻豆精品国产一级| 人人干在线视频| 国产50部艳色禁片无码国产麻豆精品一区二区三区 | 亚洲色拍国产另类| 国产精品有码无码脛∨在线| 色天堂在线观看视频 | 无码A∨高潮抽搐流白浆8MAV| 黑人又粗又大XXX精品| 中文字幕乱码一区二区三区蜜桃成熟时| 久久久久久a亚洲欧洲A v冫| 国产中文在线精品一区| 国产精品人妻无码久久久免费看| 久久久国产精品免费无码| 少妇挑战黑人4p惨叫| 亚洲av无码网站yw尤物| h工口福利里番库全彩| 不卡av中文在线观看| av一av无码免费观看| 亚洲 欧洲 日韩 综合AV| 中文字幕精品三级视频| 午夜福利精品视频| 免费国产成人午夜在线观看| 欧美一级视频高清片| 欧美另类性视频| h工口福利里番库全彩| 国产目拍亚洲精品二区婷婷| 偷拍视频国内久久精品| 韩国羞羞漫画无遮羞在线看| 人妻系列专区无码在线| 国产精品久久久久久五月天加勒比| 一区二区三区不卡中文字幕| 欧美影视一区| 韩日中文无码在线视屏| 狠狠干2017欧美最新| 久久久久久久久久久国产| 一区二区三区吞精| 这里只有好看的a视频| 欧洲黑白配一二三四区| 成人午夜福利小视频| 日韩免费高清一级毛片久久| 国产在线视频一卡| 久久九九精品视频| 欧洲另类综合| 夜色www中国精品视频网站| 狠狠色狠狠色綜合久久第一次 | 日日澡夜夜澡人人| 外国av在线免费观看| 91精品一区二区三区久久久久| 日韩激情一级毛片| 无码av高潮抽搐流白浆在线| 亚洲日韩精品人妻| 国产精品美女久久久久久大全| 精品卡通动漫在线观看视频一区 | 日韩一区二区三区四区在线播放| 亚洲色综合亚洲?V伊人蜜桃偷偷 | 国产无码不卡视频| 亚洲国产av无码综合原创国产| 亚洲日韩精品综合在线一区二区| 歐美性一交激情視頻在線| 欧美三级日韩国产在线观看| 精品亚洲国产aⅴ在线| 国产精品一区二区久久国产抖音| 色就色综合偷拍区欧美| 高潮时奶水喷出来了| 国产指交视频在线观看| 久久久综合视频一本| 91无码偷拍精品一区二区三区| 久久久久久久久久久国产| 久久99人妻精品涩爱噜噜噜蜜臀| 日韩美女粉嫩小泬在线精品| 欧洲国产精品sss在线观看av| 真实国产乱子伦对白在线播放| 亚洲精品性美腿丝袜电影| 国产精品国产欧美综合一区| 国产不卡免费在线视频| 国产欧美精品一区二区粉嫩| 日韩高清一区二区第50页| 国产精品剧情在线蜜臀| 亚洲欧洲AVAV天堂系列| 国产精品小姐久久久久久| 婷庭九月天综合水蜜桃| 99国内精品久久久久久| 色秀视频在线WWW色| 茄子成年app在线观看| 国产精品66婷婷伊人五月| 亚洲国产午夜精品一区二区| 中文字幕黄色在线观看| 另类亚洲欧美精品综合| 蘑菇成品人app下载| 9久热在线精品996热视频观看| mmuu55首页 日本系列| 国产成年男人裸j网站| 欧日一道本dvd在线无码| 最近更新中文字幕大全| 欧美12一13SEX性视频| 中文久久三级欧美| 免费观看丰满少妇一级毛片| 国产亚洲欧洲无码激情在线观看 | 国产免费女明星色视频| 香蕉视频久久免费直播| 拔萝卜免费观看高清视频下载| 中文字幕無碼亂碼人妻系列蜜桃 | 大陆日韩欧美成人| 亚洲欧美中文国产二区| 午夜精品九九九九99蜜桃| 偷拍视频国内久久精品| 久久综合老色鬼网站| 女人用炮机高潮合集视频播放 | 欧美激情aⅴ精品一区二区高清 | 三级在线观看mmm| 男生女生一起怼怼的app下载大全| 国产欧美日韩视频一区在线观看| 国产欧美一区二区日本加勒比| 免费久久黄色毛片| 亚洲国产精品成人一区二区小说| 538pro精品视频我们不只是| 亚洲国产成人mv在线观看| 动漫播放在线国产成人| 国产成人av麻豆精品| 欧美成人专区| 欧美图区另类小说熟女乱伦| 亚洲va欧美va国产va天堂影| 27报视频十八禁| 免费美女视频一区| 久久久一二三区精品| 国产一级无码| 激情婷婷丁香五月| 三级片欧美在线| 羞羞漫画免费在线看| 草莓视频免费在线看| 在线无码无码播放视频| 国产欧美日韩视频一区在线观看 | 国产精品免费播放器大全| 无码国产精品一区二区蕉蕉免费式 | 日韩av在线在线观看| 亚洲色图在线视频| 亚洲色欲或高潮影院伊人| 午夜毛片精彩毛片| 日本免费一区二区三区看片| 国产香蕉成人综合精品视频| 欧美一级高清首页蜜桃| 在线国产网站中文字幕av| 亞洲A∨精品一區二區三區下載| 一色一情一伦一区二区| 一级黄色片免费观看| 夜夜高潮夜夜爽精品视频| 欧美疯狂性受xxxxx另类| 国产精品福利视频一区二区三区| 99视频日韩三级电影| XVIDEOS免费人成视频网址| 久久网无码一级毛片| 国产毛片久久久久久久久久久久| 国产精品人妻无码久久久免费看| 国产农民工简易窝棚嫖妓精彩对白| 色偷偷AV永久无码精品无码| 91香蕉视频国产免费下载| 日日噜噜噜夜夜爽狠狠视频| 日韩欧美精品亚洲一区二区| 中文字幕人妻久久精品一区二区| 又黄又爽国产免费网站在线观看| 亚洲欧美中文日韩v在线在线观看 91精品国产高清一区二区三密臀 欧美日韩国产三级久久 | 色欲?ⅴ精品一区二区三区四区 | 99RE8国产这里只有精品| 日韩人妻久久久av一区二区| 欧美亚洲日韩国产中文在线| 999福利精品久久久| 免费观看又色又刺激的视频| 永久免费看黄| 欧美一级在线高清免费观看| 91短视频在线观看污污污| 中文字幕AV二区| 日韩精品毛片无码一区| 妇搡BBBB精品一区二区| 美女内射口爆av在线| 一级做a爱片高潮毛片| 国产亚洲h网综合h网久久| 国语自产精彩视频在线视频| app搞鸡视频在线观看黄色| aⅴ色窝窝男女爽爽a片| 9色丨porny丨人妻| 黑人巨大精品无码专区| 电影天堂免费在线观看| 激情男女高潮射精?V免费| 白洁老师国产麻豆片| 99ER这里只有精品视频8| 国产精品熟女第7页| 自拍日韩葡萄影院视频在线播放 | 久久亚洲精品少妇| 五月婷婷丁香综合| 天天更新最近中文字幕完整视频在线看! | 国产高清吹潮免费视频| 欧美激情四射一区二区在线| …久久精品99久久香蕉国产| 久久高清综合免费| 超97视频在线免费观看| 国产中文在线精品一区| jizz一区二区在线观看| 亚洲卡2卡三卡4卡2021老狼| 日韩欧美人妻之中文字幕| 午夜精品成人一区二区三区 | 久久婷婷色中文字幕免费高清| 狼友看视频的网站| 国产成人麻豆免费观看| 成人高清毛片视频| 国产又黄又爽又大的免费视频 | 欧美一级黄色免费在线观看视频| k频道一区国产在线观看| 自拍日韩葡萄影院视频在线播放| 善良的嫂子高清播放完整版| 青娱乐精品视频在线免费观看| 高清少妇欧美中文| 欧美A级毛片免费播敢| 亚洲特级毛片无码免费观看 | 欧洲亚洲国产综合精品| 亚洲三级毛片在那看| 国产亚洲A v手机在线观看| 国产三级片在线观看网站| 在线喷白浆在线视频| app搞鸡视频在线观看黄色| 黑人巨大精品无码专区| 亚洲 欧洲 日韩 综合AV| 色噜噜国产精品视频一区二区互动交流| 偷拍视频国内久久精品| 中文字幕av美利坚合众国无码| 污软件在线观看软件| 91精品网站天堂系列在线播放| 亚州中文字幕不卡影院| 日本大乳高潮视频在线观看亚洲欧美人成人让影院 | 午夜福利男女xx00视频网站| 亚洲中文字幕在线有码| 91短视频在线观看污污污| 國產精品99久久| 丰满少妇强烈进入高清视频| 亚洲欧洲在线观看无码| 又黄又爽免又刺激费视频网站| 久久国产午夜精品免费一区二区| 欧洲免费在线视频| 94人妻喷水视频在线| 成在人线Aⅴ免费观看| 二级黄色录像片免费播放| 一区三区在线免费视频观看| 中文字幕新无码国产在线视频| 国产超清无码 片内射免费| 婷婷六月天无码| 拔萝卜视频直播下载| 国产指交视频在线观看| 欧美日本不卡一二三区| 樱花视频网站| 午夜APP在线观看| 欧美在线国产一区| 精品黄色国产在线观看| 国产一级二级三级免费| 一区二区人人在线| 农村少妇野外a片www| 另类亚洲欧美精品综合| 婷婷伊人久久大香线蕉AV| 日韩免费不卡视频1| 狠狠干经典视频在线观看| 国产一级A一级裸体片| 国产亚洲A v手机在线观看| 色戒未删减2小时38分在线| 国产一级婬A片AAA毛片| 欧美一级欧美一级在线观看 | 日韩欧美国产手机在线观看| 岳乳丰满一区二区三区| 在线观看精品成人综合视频| 大家都能看的免费毛片视频| 狼人一区二区精品久久| 无码AV中文字幕| 男人天堂日韩精品| 秋霞鲁丝片AV无码| 在线观看亚洲精品视频| 午夜国产一级大片免费观看| 尤物波多野结依无码大黄片| 三级片欧美在线| 国产精品一二三级视频| metart精品白嫩的asspics| 亚洲欧美一区二区三区69| 日韓福利一區| 在线精品三级视频在线网| 88AV葵司便利店侵犯堕落| 久久黄色片三级片黄色网址| 黑人巨大亚洲综合在线| 亚洲人成网址在线观看| 19禁无遮挡啪啪无码网站性色| 最新国产乱伦| 国产成人剧情?v麻豆映画| 亚洲三级视频在线播放| 老实人夫被爆炒主角们爆炒了| 久久 久久 国内精品亚洲| 亚洲色拍国产另类| 伊人直播黄版APP入口| A级国产乱理伦片喂奶| 一区二区三区av免费| 日本少妇一级婬片HD69网站| 狠狠色狠狠色綜合久久第一次 | 国产乱码人妻一区二区三区| 搡女人真爽免费视频人成午夜| 国产一区二区三区撒尿在线| 男女做爰大粗舒服小说| 亚洲中文字幕一区二区三区在线91 | 福利社区在线观看| 18进黄址app最新版| 欧美gαy男男激情1069| 草草影院欧美04一区二区三区| 97久久精品免费公开| 国产污污视频在线观看| 日本高清在线视频无码| 色婷婷国产精品欧美毛片| 高清av中文字幕无码| 欧美日韩国产在线一区二| 免费无码a∨片在线观看| 一区三区在线免费视频观看| 婷婷丁香性爱| 国产AV三级精品成人网站| 亚洲色图国产无码| 国产影视乱伦三级| 日本国产我97在线| 国产精品酒店在线观看| 污污视频免费网站| 精品日韩久久一区| 免费视频成人欧美精品影院| 亚洲va欧美va人人爽老师| 97人人视频波多野结衣蜜月| 熟妇人妻av中文字幕老熟妇| 无码高清在线不卡一区二区 | av午夜福利一片看久久| 日本在线视频色综合| 国产午夜有码精品免费看| 国产精品男人在线播放| 麻豆精品一区二区综合āV| 99久国产久精品视频| 九九爱WWW无码人成| 超碰97人人天天夜夜| 国产白浆在线视频网| 电车痴汉侵犯短裙人妻| 冯仰妍破处门| 麻豆精品在线免费观看| 奖励网站正能量www正能量| 影音先锋国产精品天堂| 成人毛片视频亚洲| 狠狠综合久久一区二区三区 | 网址你懂得国产精品| av午夜福利一片看久久| 色欲悠久久久久综合区欧美亚洲日韩 | 久久国产精品一国产精| 今日亚洲2021在线观看| 啪一啪鲁一鲁2019在线视频| 91果冻精品国产自产自产在| 国产日韩欧美一区二区四区| 十大禁止安装app软件入口免费| 美女裸体视频91免费国产| 手机在线看片亚洲一区| 午夜福利精品视频| 欧美91成人亚洲播放网站| 久久精品国产国产精品久久| 国产又黄又爽又大的免费视频| 亚洲色图在线视频| 成人欧美视频免费看黄黄| 中文字幕二区亚洲综合| 99不卡亚洲无码视频| 亚洲AV无码乱码忘忧草亚洲| 日本丰满熟妇厨房伦| 大又大粗又爽又黄少妇毛片视频 | 一级无码国产片手机版| 亚洲āv无码专区在线播放中文| 欧美极品jizzhd欧美仙踪林| 十大禁止安装app软件入口免费 | 又黄又爽国产免费网站在线观看| 国产精品亚洲精品91| 亚洲中文字幕在线观看视频特物资 | 国产成视频在线观看| 国产黄色精品www| 日韓三級電影在線觀看| 亚洲资源中文字幕| 向井蓝中文字幕一区二区三区| 亚洲 欧洲亚洲中文字幕无码精品| 91免费入口在线观看| 亚洲黄片账号免费| 中文一区二区视频成人二区| 91精品在线观看免费视频| 美女视频黄又黄又免费| 三级在线看中文字幕完整版| 亚洲日比视频| 伊人直播黄版APP入口| 91好色先生下载污| 精品妇人妻视在线视频| 亚洲男男激情videos高清| 中文字幕av美利坚合众国无码| 欧美性爱激情| 亚洲精品日韩专区在线观春| 欧美嘿咻嘿咻视频免费| 麻豆视频传媒APP| 午夜亚洲乱码伦小说区| 色综合精品视频在线| 隔壁放荡人妻bd高清| 高清免费三级毛片| 国产精品影音先锋69| 色网在线观看| 亚i洲成色在线综合网站| 中国一级免费黄色电影| 精品人妻挤奶一二三四区 | 国产簧片免费在线播放| 成人自拍视频在线观看| 女生奖励自己隐私越狠越安全好| 久久精品国产亚洲?V无码偷窥| 亚洲熟女诱惑一区二区| 国产91九色在线| 欧美在线国产一区| 1精品啪国产在线观看免费牛牛 | 国产精品a久久久久| 国产成人在线看片| 国产狼友精品视频网| 亚洲国产中文字幕在线视频| 蜜柚影院AV免费观看| 国产美女白浆视频一区二区| 不卡av在线播放| 免费无码a∨片在线观看| 97人妻人人揉人人躁人人爽动漫| 免费看美女无遮掩的软件| 小说图片视频一区| 亚洲精品免费影院| 欧美一区日本二区| 国产精品黄在线观看免费网站| 免费在线观看精品亚洲| 免费国产一区二区久久| 中文又粗又大又硬毛| 偷拍亚洲综合二区| 国产激烈刺激网站免费观看| 成年女人喷潮视频免费观看| 伊人蕉影院久亚洲影院| 久久久最近免费字幕中文大全| 被男子脱掉内裤的美女视频| 人妻回春按摩肏到中出| 久久综合老色鬼网站| 精品区一区二在线观看| 波多野吉衣在线A片免费播放| 国产成人综合在线女婷五月99播放| 亚洲国产自久久婷婷| 日本久久高清一区二区三区| heyzo无码综合亚洲精品| av蓝导航精品导航| 亚洲欧美日韩岛国色图| 青青青青久久精品国产首| 欧美猛少妇色xxxx久久久久| 国产又黄又爽的免费视频| 人妻系列专区无码在线| 中文字幕人妻毛片av| 麻豆精品国产一级| 国产精品AV毛片免费看观看| 欧美猛少妇色xxxx久久久久| 久久一区二区美女视频网| 国产精品a久久久久| 车里要了好多次天天影院网| 欧美成人做爰a片免费看美七烈| jizz成熟丰满老女人| 1024在线看片你懂的| 91精品国产成人久久久久久| 久久人人97超碰人人爱百度| 国产91久久精品一区二区九色| 日本丰满护士bbw| 天美麻花果冻女演员表| 三级毛片高清一区| 精品一区二区三区免费在线视频| 日韩精品 欧美 制服丝袜| 成人国产一区| 一本无码人妻在中文字幕免费经典| 制服丝袜物喷水亚洲综合精品 | 亚洲国产日韩欧美综合在线一区二区三区 | 不卡av在线播放| 成人性毛片免费观看黄 | 无码强姦精品一区二区| 无码人妻不卡久久一区二区| 自拍影视无码免费| 欧洲国产精品sss在线观看av| 国产99热在线露出| 91精品国产综合久久久亚洲日韩|